HOME ESR EXPERIMENTS LABS etc
overview Control System beam optics AP-network Vacuum NORTH ARC SOUTH ARC COOLER LINE TARGET LINE INJECTION
Schottky_410MHz
  Schottky_410MHz, Page 1 of 1  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  1   Wed Aug 21 15:53:36 2019 ShahabStatus UpdateBlade installed[B]Installation of the blades[/B]

The ferritic blade was installed successfully.
 IMG_20190712_113334.jpg 
  2   Tue Nov 5 16:40:12 2019 ShahabStatus UpdatePartly torn drive belt on resonator MotorAfter an inspection, the drive belt of the
3rd motor of the 410MHz Schottky resonator
was found to be partly torn. A new belt will
 IMG_20191105_155947.jpg 
  3   Mon Nov 11 13:51:19 2019 ShahabGeneralFuse inside ESRA fuse has been apparently blown last week
inside ESR due to a clean power supply device.
This fuse was unfortunately responsible for
 IMG_20191111_095410.jpg 
  4   Mon Nov 11 14:14:37 2019 ShahabGeneralResonator drive belt exchangedThe drive belt for the 400 MHz Schottky resonator
has been replaced  by a new one. Tests have
been performed, all works fine now. Fine
 IMG_20191111_092731.jpg 
  5   Mon Nov 11 14:41:30 2019 ShahabGeneralDocumentation of the problems found in Schototky 410 MHz MotorHallo Herr Weber,

ich habe jetzt den Antrieb erfolgreich repariert.
 Bild1.jpgBild4.jpgBild2.jpgBild3.jpg 
ELOG V3.1.5-fc6679b