HOME
ESR
EXPERIMENTS
LABS etc
overview
Control System
beam optics
AP-network
Vacuum
NORTH ARC
SOUTH ARC
COOLER LINE
TARGET LINE
INJECTION
Schottky_410MHz
Schottky_410MHz, Page 1 of 1
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
5 Entries
ID
Date
Author
Category
Subject
Text
1
Wed Aug 21 15:53:36 2019
Shahab
Status Update
Blade installed
[B]Installation of the blades[/B]
The ferritic blade was installed successfully.
2
Tue Nov 5 16:40:12 2019
Shahab
Status Update
Partly torn drive belt on resonator Motor
After an inspection, the drive belt of the
3rd motor of the 410MHz Schottky resonator
was found to be partly torn. A new belt will
3
Mon Nov 11 13:51:19 2019
Shahab
General
Fuse inside ESR
A fuse has been apparently blown last week
inside ESR due to a clean power supply device.
This fuse was unfortunately responsible for
4
Mon Nov 11 14:14:37 2019
Shahab
General
Resonator drive belt exchanged
The drive belt for the 400 MHz Schottky resonator
has been replaced by a new one. Tests have
been performed, all works fine now. Fine
5
Mon Nov 11 14:41:30 2019
Shahab
General
Documentation of the problems found in Schototky 410 MHz Motor
Hallo Herr Weber,
ich habe jetzt den Antrieb erfolgreich repariert.
ELOG V3.1.5-fc6679b