HOME ESR EXPERIMENTS LABS etc
overview Control System beam optics AP-network Vacuum NORTH ARC SOUTH ARC COOLER LINE TARGET LINE INJECTION
Schottky_410MHz
  Schottky_410MHz  Not logged in ELOG logo
Message ID: 1     Entry time: Wed Aug 21 15:53:36 2019
Author: Shahab 
Category: Status Update 
Subject: Blade installed 
Installation of the blades

The ferritic blade was installed successfully. VNA Tests were successful afterwards. Data was taken for offline assessment.
Attachment 1: IMG_20190712_113334.jpg  3.239 MB  Uploaded Wed Aug 21 16:55:15 2019  | Hide | Hide all
IMG_20190712_113334.jpg
ELOG V3.1.5-fc6679b