HOME ESR EXPERIMENTS LABS etc
overview Control System beam optics AP-network Vacuum NORTH ARC SOUTH ARC COOLER LINE TARGET LINE INJECTION
interaction chamber Schottky_245MHz DCCT (beam trafo) detector drives
  interaction chamber  Not logged in ELOG logo
Message ID: 5     Entry time: Tue Oct 10 21:25:28 2023
Author: Jan Glorius 
Category: General 
Subject: documentation of installations oct 2023 
A summary of installations in the target line done in october 2023 is given below and in the attachement.
The work was done mainly by Jan Glorius, Davide Racano and Nikita Kotovskiy.

mirror chamber:
- exchanged "south window" [now MgF2]
- exchanged "middle window" [now CaF2]
- installed two NEG pumps, one inside and one outside the ring [before: blind flanges]

interaction chamber:
- installed two detector pockets with stainless steel windows [25 micron], one on top and one on bottom of chamber [before: blind flanges]
- installed pneumatic drive in "zero degree position" [before: blind flange], mounted is a detector pocket with a stainless steel window [25 micron]
- installed channeltron in 60° outside flange CF40 [before: CaF2 window on CF63 adapter]
- opened & closed blind flange on bottom of chamber to check potential collisions of top pocket and moving side pocket

In the attached overview all flanges opened during installation work are labeled.
Attachment 1: ESR_Targetumbauten_Okt_2023.png  5.405 MB  Uploaded Tue Oct 10 23:28:51 2023  | Show | Show all
ELOG V3.1.5-fc6679b