HOME ESR EXPERIMENTS LABS etc
overview Control System beam optics AP-network Vacuum NORTH ARC SOUTH ARC COOLER LINE TARGET LINE INJECTION
interaction chamber Schottky_245MHz DCCT (beam trafo) detector drives
  interaction chamber  Not logged in ELOG logo
Message ID: 7     Entry time: Mon Aug 31 10:02:20 2026
Author: Jan 
Category: General 
Subject: NECTAR chamber - CAD 
Attached are the construction drawings of the NECTAR chamber as designed and manufactured by MPIK Heidelberg in
2026.

Additionally, the off-beam fixation is attached in another drawing. This is for mounting the chamber on the pre-
installation frame.

Finally, the STEP files of the full chamber as well as of the support frame situation are attached.

The large DN200 detector drives are from VAB and called "UHV Präzisions-Lineardurchführung LD 200".
Attachment 1: NECTAR_chamber_FINAL_contruction_drawings.pdf  9.719 MB  Uploaded Mon Aug 31 11:03:08 2026  | Hide | Hide all | Show all
NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf NECTAR_chamber_FINAL_contruction_drawings.pdf
Attachment 2: NECTAR_addons_FINAL_contruction_drawings.pdf  154 kB  Uploaded Mon Aug 31 11:08:59 2026  | Show | Hide all | Show all
Attachment 3: NECTAR_chamber_FINAL.STEP.tar.gz  6.860 MB  Uploaded Mon Aug 31 11:21:12 2026
Attachment 4: Support_V1.stp.zip  2.183 MB  Uploaded Mon Aug 31 11:57:53 2026
ELOG V3.1.5-fc6679b