HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Laser Cooling Experiment 2021  Not logged in ELOG logo
Message ID: 69     Entry time: Sat May 15 12:11:54 2021
Author: Benedikt 
Category: General 
Subject: Laser-bunch-timing 
Optimizing the laser bunch timing.
h = 7 (9.0389145 MHz)
Reprate is already set to same frequency.


Results: For h=7:
4 ns delay results in a maximum fluorescence rate in the XUV detector
25 ns delay shows the highest intensity in the Schottky spectrum while the laser operates at 1028.940 nm.
ELOG V3.1.5-fc6679b