The operators are still busy extracting the beam from the SIS18 towards the ESR and injecting it into the ESR.
There will be a short break (2 hours) this afternoon. Between 13:30 and 15:30. The so-calles "super lense" in the UNILAC needs to be cleaned (rinsed). After that operation should continue as usual.
We see a strange behavior of the anode signal when we bunch the ion beam and electron cooler is on. peak structure... ---> we play now with the bunching amplitude 200mV 150mV 100mV ---> Peaks higher? see attached file