ID |
Date |
Author |
Category |
Subject |
Text |
 |
85
|
Tue May 31 07:29:11 2022 |
Ken | Detectors | XUV-Detektor | Rate was very low: ~ 100Hz
Adjusted Walk level and Threshold, new rate:
5kHz
|
|
66
|
Sat May 15 09:57:24 2021 |
Dayshift | Runs | Currently on schedule | Enhance fluorescence rate and perform
laser bunch timing
|
|
Draft
|
Wed May 12 02:16:25 2021 |
Danyal, Lars | Accelerator | Ion beam position | Laser Position with scrapers verified.
1HA: impossible to scratch laser beam, still
there at -1.0 mm |
|
1
|
Mon May 10 07:58:13 2021 |
Danyal | General | Telephone numbers and Zoom link | Telephone numbers:
ESR laser lab: +49 (0)6159 71 - 2882
|
|
2
|
Tue May 11 15:49:30 2021 |
Danyal | General | setting up ESR | The operators are still busy extracting the
beam from the SIS18 towards the ESR and injecting
it into the ESR. |
|
5
|
Tue May 11 18:29:35 2021 |
Danyal | General | first ions in the ESR | |
|
6
|
Tue May 11 20:14:43 2021 |
Danyal | General | bad ESR vacuum | I just heard that the ESR vacuum is quite
bad.
There was a small vacuum problem a while |
|
8
|
Wed May 12 02:34:29 2021 |
Danyal | General | instabilities in ion frequency | The ion beam moves around, pretty arbitrary.
See picture.
ESR crew believes that it is not due to fluctuations |
|
20
|
Wed May 12 13:11:58 2021 |
Danyal | Accelerator | short break between 13:30 and 15:30 | There will be a short break (2 hours) this
afternoon. Between 13:30 and 15:30.
The so-calles "super lense" in the UNILAC |
|
21
|
Wed May 12 15:36:04 2021 |
Danyal | Accelerator | general power failure in ESR! (everything is off) | The power in the ESR is off.
(also on the gas-target area on top of ESR)
Electrical engineers are trying to find and |
|
25
|
Wed May 12 22:35:33 2021 |
Danyal | General | frev and fb | Schottky frequency (189th harmonic) = 244.033662
MHz
|
|
30
|
Thu May 13 00:58:53 2021 |
Danyal | DAQ | unbunched ion beam | |
 |
31
|
Thu May 13 01:01:27 2021 |
Danyal | DAQ | bunched ion beam | |
  |
32
|
Thu May 13 01:05:45 2021 |
Danyal | DAQ | more stability by bunching | Because the C3+ part of the ion beam is properly
bunched, it is no longer so sensitive to
the drifts caused by the e-cooler.
|
|
84
|
Mon May 17 21:43:56 2021 |
Danyal | General | The test beamtime was a success. | Dear all,
The test beamtime is now over.
|
|
17
|
Wed May 12 09:59:08 2021 |
Benedikt | General | Rigol DSG821 signal generator settings | |
|
40
|
Thu May 13 20:18:10 2021 |
Benedikt | General | New f_rev | The ions were changed to a different speed
today at 2 PM. The new revolution frequency
is now 1.291278 MHz. |
|
41
|
Thu May 13 21:00:48 2021 |
Benedikt | General | New reprate of the UV laser | The lasersystem now operates at a reparte
of 9.038946 MHz. This is 7 times f_rev (see
previous post).
|
|
56
|
Fri May 14 11:01:33 2021 |
Benedikt | Calibration | Laser Beam adjusted | The laser beam was adjusted in his position
to overlap better with the ions.
|
|
57
|
Fri May 14 16:37:01 2021 |
Benedikt | General | Status update | Right now, we have to adjust the ion beam
a bit to overlap better with the laser beam.
We keep the laser wavelength at resonance |
|