HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
Laser Cooling Experiment 2021, Page 4 of 5
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
Simulations
Accelerator
84 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
Next
All
ID
Date
Author
Category
Subject
Text
85
Tue May 31 07:29:11 2022
Ken
Detectors
XUV-Detektor
Rate was very low: ~ 100Hz
Adjusted Walk level and Threshold, new rate:
5kHz
66
Sat May 15 09:57:24 2021
Dayshift
Runs
Currently on schedule
Enhance fluorescence rate and perform
laser bunch timing
Draft
Wed May 12 02:16:25 2021
Danyal, Lars
Accelerator
Ion beam position
Laser Position with scrapers verified.
1HA: impossible to scratch laser beam, still
there at -1.0 mm
1
Mon May 10 07:58:13 2021
Danyal
General
Telephone numbers and Zoom link
Telephone numbers:
ESR laser lab: +49 (0)6159 71 - 2882
2
Tue May 11 15:49:30 2021
Danyal
General
setting up ESR
The operators are still busy extracting the
beam from the SIS18 towards the ESR and injecting
it into the ESR.
5
Tue May 11 18:29:35 2021
Danyal
General
first ions in the ESR
6
Tue May 11 20:14:43 2021
Danyal
General
bad ESR vacuum
I just heard that the ESR vacuum is quite
bad.
There was a small vacuum problem a while
8
Wed May 12 02:34:29 2021
Danyal
General
instabilities in ion frequency
The ion beam moves around, pretty arbitrary.
See picture.
ESR crew believes that it is not due to fluctuations
20
Wed May 12 13:11:58 2021
Danyal
Accelerator
short break between 13:30 and 15:30
There will be a short break (2 hours) this
afternoon. Between 13:30 and 15:30.
The so-calles "super lense" in the UNILAC
21
Wed May 12 15:36:04 2021
Danyal
Accelerator
general power failure in ESR! (everything is off)
The power in the ESR is off.
(also on the gas-target area on top of ESR)
Electrical engineers are trying to find and
25
Wed May 12 22:35:33 2021
Danyal
General
frev and fb
Schottky frequency (189th harmonic) = 244.033662
MHz
30
Thu May 13 00:58:53 2021
Danyal
DAQ
unbunched ion beam
31
Thu May 13 01:01:27 2021
Danyal
DAQ
bunched ion beam
32
Thu May 13 01:05:45 2021
Danyal
DAQ
more stability by bunching
Because the C3+ part of the ion beam is properly
bunched, it is no longer so sensitive to
the drifts caused by the e-cooler.
84
Mon May 17 21:43:56 2021
Danyal
General
The test beamtime was a success.
Dear all,
The test beamtime is now over.
17
Wed May 12 09:59:08 2021
Benedikt
General
Rigol DSG821 signal generator settings
40
Thu May 13 20:18:10 2021
Benedikt
General
New f_rev
The ions were changed to a different speed
today at 2 PM. The new revolution frequency
is now 1.291278 MHz.
41
Thu May 13 21:00:48 2021
Benedikt
General
New reprate of the UV laser
The lasersystem now operates at a reparte
of 9.038946 MHz. This is 7 times f_rev (see
previous post).
56
Fri May 14 11:01:33 2021
Benedikt
Calibration
Laser Beam adjusted
The laser beam was adjusted in his position
to overlap better with the ions.
57
Fri May 14 16:37:01 2021
Benedikt
General
Status update
Right now, we have to adjust the ion beam
a bit to overlap better with the laser beam.
We keep the laser wavelength at resonance
Goto page
Previous
1
,
2
,
3
, 4,
5
Next
All
ELOG V3.1.5-fc6679b