HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Laser Cooling Experiment 2021, Page 5 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject
  4   Tue May 11 16:33:31 2021 Ken UeberholzDetectorsDetector control manual
Attached to this elog entry is a short manual for the xuv-detector control. If anything is missing or not understandable I can change anything.
  3   Tue May 11 16:07:59 2021 SebastianDAQDAQ Manual
Attached you'll find a short manual for operating the whole DAQ system
  2   Tue May 11 15:49:30 2021 DanyalGeneralsetting up ESR
The operators are still busy extracting the beam from the SIS18 towards the ESR and injecting it into the ESR. 
  1   Mon May 10 07:58:13 2021 DanyalGeneralTelephone numbers and Zoom link
Telephone numbers:

ESR laser lab: +49 (0)6159 71 - 2882
ESR measurement hut: +49 (0)6159 71 - 2880
HKR (main control room): +49 (0)6159 71 - 2317 or 2245

here is the zoom information:

https://tu-darmstadt.zoom.us/j/2183997317?pwd=WGc2TEkxYlEyNFhMWm02bFhqRnRVUT09

Meeting-ID: 218 399 7317
Passwort: 481607
ELOG V3.1.5-fc6679b