Attached to this elog entry is a short manual for the xuv-detector control. If anything is missing or not understandable I can change anything.
Attached you'll find a short manual for operating the whole DAQ system
The operators are still busy extracting the beam from the SIS18 towards the ESR and injecting it into the ESR.
Telephone numbers: ESR laser lab: +49 (0)6159 71 - 2882 ESR measurement hut: +49 (0)6159 71 - 2880 HKR (main control room): +49 (0)6159 71 - 2317 or 2245 here is the zoom information: https://tu-darmstadt.zoom.us/j/2183997317?pwd=WGc2TEkxYlEyNFhMWm02bFhqRnRVUT09 Meeting-ID: 218 399 7317 Passwort: 481607