  43   Mon Jan 20 10:40:00 2020 Cristinatest with bakeoutCeramic Tube Diagnostic-Dorn 06-004-01376-3KW4On scheduleKW420.01.20DONEAccepted21.01.2020Setup 127.01.20Accepted29.01.20M.Müller    
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller    
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  47   Thu Feb 6 11:11:21 2020 CristinaGeneralIn kind contribution Sweden -NikoMarch 2020On schedule              
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert    
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert    
  50   Thu Feb 6 12:48:46 2020 Cristinaleak check30 SIS 100 pumping chambersMay 20DelayedDecember 20         1 chamber required: acceptance test without
bakeout
  
  51   Tue Feb 11 09:53:14 2020 Cristinaleak checkSIS100 Sextupole (6)September 2020Delayed              
  52   Tue Feb 11 09:54:49 2020 Cristinatest with bakeoutSIS100 Injection Kicker September 2020Delayed              
  53   Tue Feb 11 09:57:17 2020 Cristinatest with bakeoutSIS100 diagnostic chambersJune 2020Delayed 17.11.2020DONENot Needed17.11.20Customised25.11.20Cond. Accep.01.12.20GrossmontageThere are a total of 6 chambers. We have to
do leak check to all 6, and a complete SAT
(with bakeout) to 1 chamber
  
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac    
  55   Fri Feb 14 13:34:54 2020 Cristinatest with bakeoutBerrilium Copper Stripes Dermati14.02.2020On schedule14.02.202014.02.2020DONENot Needed17.02.2020; 11:30 amSetup 124.02.2020Cond. Accep.26.02.2020Bardonner    
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  58   Tue Mar 3 09:34:40 2020 CristinaCoatingSPARC chambers June 2019DelayedFebraury 202012.02.2020DONEAccepted01.09.2020Horizontal Coating Setup03.11.20Accepted10.12.20Track to JülichHR11VU61 (21.09.20); HR18VU63 (06.10.20);
HR19VU64 (26.10.20); HR12VU62(02.11.20)
  
  59   Tue Mar 3 09:58:03 2020 Cristinatest with bakeoutFerrite RI (as received)15.MarchOn schedule 20.03.2020DONENot Needed23.03.2020Setup 127.03.2020Cond. Accep.-----------------    
  60   Tue Mar 3 13:50:28 2020 Cristinatest with bakeoutMacor 4 -IPM GiacominiKW10On schedule 03.03.2020DONENot Needed18.03.2020; 07:45 amMobile 227.03.2020Cond. Accep.11.05.2020T. Giacomini    
  61   Wed Mar 4 10:06:09 2020 Pheleak checkTransistion tube for SIS100 string test_Second testBeginning 2020DelayedFebruaryEnd of FebruaryDONEAccepted03.03.2020Customised03.03.2020Accepted5.03.2020Ivan and Stefan (for integration @BNG)   IMG-20200304-WA0001.jpg 
  62   Mon Mar 9 08:46:22 2020 Phetest without bakeoutBPM SIS100 2010-3, repeat after long pumping @ Hackhalle On schedule 06.03.2020DONEAccepted09.03.2020; 07:00 amMobile 310.03.2020Accepted12.03.2020M.Müller    
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller    