Entry  Mon Jan 20 10:40:00 2020, Cristina, test with bakeout, Ceramic Tube Diagnostic-Dorn 06-004-01376-3, KW4, On schedule, KW4, 20.01.20, DONE, Accepted, 21.01.2020, Setup 1, 27.01.20, Accepted, 29.01.20, M.Müller 
 
Entry  Thu Feb 6 10:33:17 2020, Cristina, test without bakeout, BPM 2010-17 (keept in the new cryostat), KW7, On schedule, KW7, 10.02.2020, DONE, Accepted, 12.02.2020, Mobile 3, 14.02.2020, Refused, 18.02.2020, M.Müller 
 
Entry  Thu Feb 6 10:34:00 2020, Cristina, test without bakeout, BPM 2010-15 (from the Company), KW8, On schedule, KW8, 18.02.2020, DONE, Refused, 19.02.2020, Mobile 3, 21.02.2020, Cond. Accep., 25.02.2020, M.Müller 
 
Entry  Thu Feb 6 10:34:25 2020, Cristina, test without bakeout, BPM 2010-16 (keep in the old cryostat), KW9, On schedule, KW9, 26.02.2020, DONE, Refused, 26.02.2020, Mobile 3, 28.02.2020, Cond. Accep., 27.02.2020, Müller 
 
Entry  Thu Feb 6 11:11:21 2020, Cristina, General, In kind contribution Sweden -Niko, March 2020, On schedule, , , , , , , , , ,  
 
Entry  Thu Feb 6 12:45:52 2020, Cristina, test without bakeout, Protoype BV CWT, March, On schedule, , 26.08.20, DONE, Not Needed, 14.09.20, Customised, 21.09.20, Accepted, 22.09.20, S. Wilfert 
 
Entry  Thu Feb 6 12:47:18 2020, Cristina, leak check, Interconnction bellows between Dipole and Quadrupole, October , On schedule, , 3.11.20, DONE, Accepted, 04.11.20, Customised, 04.11.20, Refused, 04.11.20, in Büro of S.Wilfert 
 
Entry  Thu Feb 6 12:48:46 2020, Cristina, leak check, 30 SIS 100 pumping chambers, May 20, Delayed, December 20, , , , , , , , ,  
1 chamber required: acceptance test without bakeout
Entry  Tue Feb 11 09:53:14 2020, Cristina, leak check, SIS100 Sextupole (6), September 2020, Delayed, , , , , , , , , ,  
 
Entry  Tue Feb 11 09:54:49 2020, Cristina, test with bakeout, SIS100 Injection Kicker , September 2020, Delayed, , , , , , , , , ,  
 
Entry  Tue Feb 11 09:57:17 2020, Cristina, test with bakeout, SIS100 diagnostic chambers, June 2020, Delayed, , 17.11.2020, DONE, Not Needed, 17.11.20, Customised, 25.11.20, Cond. Accep., 01.12.20, Grossmontage 
There are a total of 6 chambers. We have to do leak check to all 6, and a complete SAT (with bakeout) to 1 chamber
Entry  Tue Feb 11 09:59:48 2020, Cristina, leak check, SIS100 Quadrupole chambers, March 2020, Delayed, September 20, September 20, DONE, Accepted, 30.09.20, HEBT Setup, 06.10.20, Accepted, 8.10.20, I.Pongrac 
 
Entry  Fri Feb 14 13:34:54 2020, Cristina, test with bakeout, Berrilium Copper Stripes Dermati, 14.02.2020, On schedule, 14.02.2020, 14.02.2020, DONE, Not Needed, 17.02.2020; 11:30 am, Setup 1, 24.02.2020, Cond. Accep., 26.02.2020, Bardonner 
 
Entry  Wed Feb 19 11:42:59 2020, Cristina, pumping speed, TMP Cryring (Nikita), KW8, On schedule, KW8, 19.02.2020, DONE, Refused, 9.03.2020, Fischer-Mommsen, 16.03.2020, Accepted, 29.05.2020, Nikita pumpingspeed.jpg
 
Entry  Tue Mar 3 09:34:40 2020, Cristina, Coating, SPARC chambers , June 2019, Delayed, Febraury 2020, 12.02.2020, DONE, Accepted, 01.09.2020, Horizontal Coating Setup, 03.11.20, Accepted, 10.12.20, Track to Jülich 
HR11VU61 (21.09.20); HR18VU63 (06.10.20); HR19VU64 (26.10.20); HR12VU62(02.11.20)
Entry  Tue Mar 3 09:58:03 2020, Cristina, test with bakeout, Ferrite RI (as received), 15.March, On schedule, , 20.03.2020, DONE, Not Needed, 23.03.2020, Setup 1, 27.03.2020, Cond. Accep., --------, --------- 
 
Entry  Tue Mar 3 13:50:28 2020, Cristina, test with bakeout, Macor 4 -IPM Giacomini, KW10, On schedule, , 03.03.2020, DONE, Not Needed, 18.03.2020; 07:45 am, Mobile 2, 27.03.2020, Cond. Accep., 11.05.2020, T. Giacomini 
 
Entry  Wed Mar 4 10:06:09 2020, Phe, leak check, Transistion tube for SIS100 string test_Second test, Beginning 2020, Delayed, February, End of February, DONE, Accepted, 03.03.2020, Customised, 03.03.2020, Accepted, 5.03.2020, Ivan and Stefan (for integration @BNG) IMG-20200304-WA0001.jpg
 
Entry  Mon Mar 9 08:46:22 2020, Phe, test without bakeout, BPM SIS100 2010-3, repeat after long pumping @ Hackhalle, , On schedule, , 06.03.2020, DONE, Accepted, 09.03.2020; 07:00 am, Mobile 3, 10.03.2020, Accepted, 12.03.2020, M.Müller 
 
Entry  Thu Mar 12 13:47:38 2020, Phe, test without bakeout, BPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic), Received , On schedule, , 12.03.2020, DONE, Not Needed, 12.03.2020; 11:55 am, Mobile 3, 17.03.2020; 11:00 am, Accepted, 19.03.2020, M.Müller 
 