Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 3 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page
Previous
1
,
2
, 3,
4
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
43
Mon Jan 20 10:40:00 2020
Cristina
test with bakeout
Ceramic Tube Diagnostic-Dorn 06-004-01376-3
KW4
On schedule
KW4
20.01.20
DONE
Accepted
21.01.2020
Setup 1
27.01.20
Accepted
29.01.20
M.Müller
44
Thu Feb 6 10:33:17 2020
Cristina
test without bakeout
BPM 2010-17 (keept in the new cryostat)
KW7
On schedule
KW7
10.02.2020
DONE
Accepted
12.02.2020
Mobile 3
14.02.2020
Refused
18.02.2020
M.Müller
45
Thu Feb 6 10:34:00 2020
Cristina
test without bakeout
BPM 2010-15 (from the Company)
KW8
On schedule
KW8
18.02.2020
DONE
Refused
19.02.2020
Mobile 3
21.02.2020
Cond. Accep.
25.02.2020
M.Müller
46
Thu Feb 6 10:34:25 2020
Cristina
test without bakeout
BPM 2010-16 (keep in the old cryostat)
KW9
On schedule
KW9
26.02.2020
DONE
Refused
26.02.2020
Mobile 3
28.02.2020
Cond. Accep.
27.02.2020
Müller
47
Thu Feb 6 11:11:21 2020
Cristina
General
In kind contribution Sweden -Niko
March 2020
On schedule
48
Thu Feb 6 12:45:52 2020
Cristina
test without bakeout
Protoype BV CWT
March
On schedule
26.08.20
DONE
Not Needed
14.09.20
Customised
21.09.20
Accepted
22.09.20
S. Wilfert
49
Thu Feb 6 12:47:18 2020
Cristina
leak check
Interconnction bellows between Dipole and Quadrupole
October
On schedule
3.11.20
DONE
Accepted
04.11.20
Customised
04.11.20
Refused
04.11.20
in Büro of S.Wilfert
50
Thu Feb 6 12:48:46 2020
Cristina
leak check
30 SIS 100 pumping chambers
May 20
Delayed
December 20
1 chamber required: acceptance test without
bakeout
51
Tue Feb 11 09:53:14 2020
Cristina
leak check
SIS100 Sextupole (6)
September 2020
Delayed
52
Tue Feb 11 09:54:49 2020
Cristina
test with bakeout
SIS100 Injection Kicker
September 2020
Delayed
53
Tue Feb 11 09:57:17 2020
Cristina
test with bakeout
SIS100 diagnostic chambers
June 2020
Delayed
17.11.2020
DONE
Not Needed
17.11.20
Customised
25.11.20
Cond. Accep.
01.12.20
Grossmontage
There are a total of 6 chambers. We have to
do leak check to all 6, and a complete SAT
(with bakeout) to 1 chamber
54
Tue Feb 11 09:59:48 2020
Cristina
leak check
SIS100 Quadrupole chambers
March 2020
Delayed
September 20
September 20
DONE
Accepted
30.09.20
HEBT Setup
06.10.20
Accepted
8.10.20
I.Pongrac
55
Fri Feb 14 13:34:54 2020
Cristina
test with bakeout
Berrilium Copper Stripes Dermati
14.02.2020
On schedule
14.02.2020
14.02.2020
DONE
Not Needed
17.02.2020; 11:30 am
Setup 1
24.02.2020
Cond. Accep.
26.02.2020
Bardonner
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
58
Tue Mar 3 09:34:40 2020
Cristina
Coating
SPARC chambers
June 2019
Delayed
Febraury 2020
12.02.2020
DONE
Accepted
01.09.2020
Horizontal Coating Setup
03.11.20
Accepted
10.12.20
Track to Jülich
HR11VU61 (21.09.20); HR18VU63 (06.10.20);
HR19VU64 (26.10.20); HR12VU62(02.11.20)
59
Tue Mar 3 09:58:03 2020
Cristina
test with bakeout
Ferrite RI (as received)
15.March
On schedule
20.03.2020
DONE
Not Needed
23.03.2020
Setup 1
27.03.2020
Cond. Accep.
--------
---------
60
Tue Mar 3 13:50:28 2020
Cristina
test with bakeout
Macor 4 -IPM Giacomini
KW10
On schedule
03.03.2020
DONE
Not Needed
18.03.2020; 07:45 am
Mobile 2
27.03.2020
Cond. Accep.
11.05.2020
T. Giacomini
61
Wed Mar 4 10:06:09 2020
Phe
leak check
Transistion tube for SIS100 string test_Second test
Beginning 2020
Delayed
February
End of February
DONE
Accepted
03.03.2020
Customised
03.03.2020
Accepted
5.03.2020
Ivan and Stefan (for integration @BNG)
62
Mon Mar 9 08:46:22 2020
Phe
test without bakeout
BPM SIS100 2010-3, repeat after long pumping @ Hackhalle
On schedule
06.03.2020
DONE
Accepted
09.03.2020; 07:00 am
Mobile 3
10.03.2020
Accepted
12.03.2020
M.Müller
63
Thu Mar 12 13:47:38 2020
Phe
test without bakeout
BPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)
Received
On schedule
12.03.2020
DONE
Not Needed
12.03.2020; 11:55 am
Mobile 3
17.03.2020; 11:00 am
Accepted
19.03.2020
M.Müller
Goto page