Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 4 of 9
Not logged in
Find
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
165 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
7
,
8
,
9
Next
All
Thu Mar 12 13:49:09 2020, Phe, test without bakeout, BPM SIS100 2010-17 (ceramic only), Received, On schedule, , 12.03.2020, DONE, Not Needed, 18.03.2020; 08:25, Setup 1, 19.03.2020; 11:00, Cond. Accep., 19.03.2020, M.Müller
Thu Mar 19 11:23:38 2020, Phe, test without bakeout, BPM SIS100 2010-15 (after cryo), , On schedule, , 19.03.2020, DONE, Not Needed, 19.03.2020; 15:00, Mobile 3, 25.03.2020, Cond. Accep., 26.03.2020, M.Müller
Wed Mar 25 14:22:40 2020, Phe, test without bakeout, Broken ceramic for BPM, , On schedule, , 25.03.2020, DONE, Not Needed, 26.03.2020, Setup 2, 27.03.2020, Cond. Accep., 28.03.2020, M.Müller
Mon Apr 6 15:33:45 2020, Phe, test with bakeout, Unbaked Ferrites from RI (bigger size), , On schedule, , 06.04.2020, DONE, Not Needed, , Setup 1, 22.04.2020, Cond. Accep., ,
Wed Apr 22 08:35:13 2020, Phe, test without bakeout, BPM 2010-15 - 2 weeks pump down in Hackhalle, , On schedule, , 21.04.2020, DONE, Not Needed, 21.04.2020; 17:00, Mobile 3, 24.04.2020, Accepted, 23.04.20, M.Müller
Wed Apr 22 10:14:43 2020, Cristina, test with bakeout, Ceramic Tube for Cryring (Sieber, KW13, Delayed, 22.04.2020, 24.04.2020, DONE, Not Needed, 27.04.2020, Setup 2, 06.05.2020, Refused, 8.05.2020, T.Sieber
Wed Apr 22 13:45:53 2020, Cristina, test without bakeout, p-linac dipoles, 20.04.2020, On schedule, , 20.04.2020, DONE, Accepted, 21.04.2020, HEBT Setup, 29.04.2020, Cond. Accep., 27.05.2020, Florian (Grossmontage)
Fri Apr 24 09:56:27 2020, Cristina, test with bakeout, Be windows-Spillman, KW18, On schedule, , 28.04.2020, DONE, Not Needed, 26.05.2020, Setup 2, MEASUREMENTS STOPPED, , 02.10.20, Collegue Spillman
Wed May 13 15:26:53 2020, Phe, test with bakeout, Big Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005, , On schedule, , 11.05.2020, DONE, Not Needed, 13.05.2020; 7:40 am, Setup 1, 25.05.2020, Cond. Accep., ---------, -----------
Tue May 19 09:20:24 2020, Cristina, test with bakeout, Ceramic parts Hillenbrand, 25.05.20, On schedule, , 25.05.2020, DONE, Accepted, 26.05.2020, Setup 1, 30.05.2020, Accepted, 09.06.2020, Hillenbrand
Tue May 19 12:03:40 2020, Phe, Problem, Turbo Pump from Thomas Seiber, , On schedule, , KW19, DONE, Not Needed, 19.05.2020, Customised, 20.05.2020, Refused, 27.05.2020, Student from T.Sieber
Wed May 27 10:34:37 2020, Phe, test without bakeout, BPM SIS100 X2010-16, , , , KW21, DONE, Not Needed, 20.05.2020, Customised, 22.05.2020, Cond. Accep., 26.08.20, M.Müller
Wed Jun 17 10:13:57 2020, Cristina, test with bakeout, IPM SIS18, End May, On schedule, , End May (the gewind had to be redone by Pfeiffer), DONE, Accepted, 17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20, Customised, 31.08.20, Cond. Accep., 04.09.2020, Back to Tino G.
Wed Jun 17 12:58:02 2020, Cristina, test without bakeout, SIS100 Dipole 07-6-016-4, ----, , ------, 17.06.2020, DONE, Accepted, 17.06.2020, HEBT Setup, 19.06.2020, Cond. Accep., 22.06.2020, brought back to the TH
Fri Aug 28 11:51:30 2020, Phe, test without bakeout, SIS100 dipole 07-00009-020-01, , , , , DONE, Accepted, 26.08.20, HEBT Setup, 28.08.20, Refused, 1.09.20, in the TH
Fri Aug 28 11:52:43 2020, Phe, test without bakeout, BPM SIS100 2010-61, , , , 26.08.20, DONE, Accepted, 26.08.20, Mobile 3, 28.08.20, Cond. Accep., 09.09.20, S. Fiedler
Fri Sep 11 09:56:40 2020, Cristina, test without bakeout, BPM SIS100 X2010-63, , , , , DONE, Accepted, 31.08.2020, Mobile 3, 01.09.20, Accepted, 09.09.20, S. Fiedler
Fri Sep 11 09:59:20 2020, Cristina, test without bakeout, Bellows IPM SIS18, , , , 01.09.2020, DONE, Refused, 02.09.2020, HEBT Setup, 03.09.2020, Refused, 11.09.2020, Zentrale Dienst (back to Giacomini)
Fri Sep 11 10:07:46 2020, Cristina, test with bakeout, Nuts company TwinNut, , , , , DONE, Accepted, 01.09.2020, Mobile 2, 10.09.2020, Accepted, ------, --------
Fri Sep 11 10:13:59 2020, Cristina, test without bakeout, Cecom diagnostic chamber HEBT, , , , 01.09.2020, DONE, Accepted, 02.09.2020, Setup 1, 04.09.2020, Cond. Accep., 23.09.20, M.Müller
Goto page
Previous
1
,
2
,
3
, 4,
5
...
7
,
8
,
9
Next
All
ELOG V3.1.5-fc6679b