Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 4 of 9
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full |
Summary
|
Threaded
|
Hide attachments
165 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
64
Thu Mar 12 13:49:09 2020
Phe
test without bakeout
BPM SIS100 2010-17 (ceramic only)
Received
On schedule
12.03.2020
DONE
Not Needed
18.03.2020; 08:25
Setup 1
19.03.2020; 11:00
Cond. Accep.
19.03.2020
M.Müller
66
Thu Mar 19 11:23:38 2020
Phe
test without bakeout
BPM SIS100 2010-15 (after cryo)
On schedule
19.03.2020
DONE
Not Needed
19.03.2020; 15:00
Mobile 3
25.03.2020
Cond. Accep.
26.03.2020
M.Müller
67
Wed Mar 25 14:22:40 2020
Phe
test without bakeout
Broken ceramic for BPM
On schedule
25.03.2020
DONE
Not Needed
26.03.2020
Setup 2
27.03.2020
Cond. Accep.
28.03.2020
M.Müller
68
Mon Apr 6 15:33:45 2020
Phe
test with bakeout
Unbaked Ferrites from RI (bigger size)
On schedule
06.04.2020
DONE
Not Needed
Setup 1
22.04.2020
Cond. Accep.
69
Wed Apr 22 08:35:13 2020
Phe
test without bakeout
BPM 2010-15 - 2 weeks pump down in Hackhalle
On schedule
21.04.2020
DONE
Not Needed
21.04.2020; 17:00
Mobile 3
24.04.2020
Accepted
23.04.20
M.Müller
70
Wed Apr 22 10:14:43 2020
Cristina
test with bakeout
Ceramic Tube for Cryring (Sieber
KW13
Delayed
22.04.2020
24.04.2020
DONE
Not Needed
27.04.2020
Setup 2
06.05.2020
Refused
8.05.2020
T.Sieber
71
Wed Apr 22 13:45:53 2020
Cristina
test without bakeout
p-linac dipoles
20.04.2020
On schedule
20.04.2020
DONE
Accepted
21.04.2020
HEBT Setup
29.04.2020
Cond. Accep.
27.05.2020
Florian (Grossmontage)
72
Fri Apr 24 09:56:27 2020
Cristina
test with bakeout
Be windows-Spillman
KW18
On schedule
28.04.2020
DONE
Not Needed
26.05.2020
Setup 2
MEASUREMENTS STOPPED
02.10.20
Collegue Spillman
73
Wed May 13 15:26:53 2020
Phe
test with bakeout
Big Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005
On schedule
11.05.2020
DONE
Not Needed
13.05.2020; 7:40 am
Setup 1
25.05.2020
Cond. Accep.
---------
-----------
74
Tue May 19 09:20:24 2020
Cristina
test with bakeout
Ceramic parts Hillenbrand
25.05.20
On schedule
25.05.2020
DONE
Accepted
26.05.2020
Setup 1
30.05.2020
Accepted
09.06.2020
Hillenbrand
75
Tue May 19 12:03:40 2020
Phe
Problem
Turbo Pump from Thomas Seiber
On schedule
KW19
DONE
Not Needed
19.05.2020
Customised
20.05.2020
Refused
27.05.2020
Student from T.Sieber
Die Pumpe hat den Fehlercode 088 und hat eine Störung des Axiallagersensors.(checked by Graziano)
Attachment 1:
pump_Sieber.jpg
76
Wed May 27 10:34:37 2020
Phe
test without bakeout
BPM SIS100 X2010-16
KW21
DONE
Not Needed
20.05.2020
Customised
22.05.2020
Cond. Accep.
26.08.20
M.Müller
77
Wed Jun 17 10:13:57 2020
Cristina
test with bakeout
IPM SIS18
End May
On schedule
End May (the gewind had to be redone by Pfeiffer)
DONE
Accepted
17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20
Customised
31.08.20
Cond. Accep.
04.09.2020
Back to Tino G.
78
Wed Jun 17 12:58:02 2020
Cristina
test without bakeout
SIS100 Dipole 07-6-016-4
----
------
17.06.2020
DONE
Accepted
17.06.2020
HEBT Setup
19.06.2020
Cond. Accep.
22.06.2020
brought back to the TH
79
Fri Aug 28 11:51:30 2020
Phe
test without bakeout
SIS100 dipole 07-00009-020-01
DONE
Accepted
26.08.20
HEBT Setup
28.08.20
Refused
1.09.20
in the TH
80
Fri Aug 28 11:52:43 2020
Phe
test without bakeout
BPM SIS100 2010-61
26.08.20
DONE
Accepted
26.08.20
Mobile 3
28.08.20
Cond. Accep.
09.09.20
S. Fiedler
81
Fri Sep 11 09:56:40 2020
Cristina
test without bakeout
BPM SIS100 X2010-63
DONE
Accepted
31.08.2020
Mobile 3
01.09.20
Accepted
09.09.20
S. Fiedler
82
Fri Sep 11 09:59:20 2020
Cristina
test without bakeout
Bellows IPM SIS18
01.09.2020
DONE
Refused
02.09.2020
HEBT Setup
03.09.2020
Refused
11.09.2020
Zentrale Dienst (back to Giacomini)
83
Fri Sep 11 10:07:46 2020
Cristina
test with bakeout
Nuts company TwinNut
DONE
Accepted
01.09.2020
Mobile 2
10.09.2020
Accepted
------
--------
84
Fri Sep 11 10:13:59 2020
Cristina
test without bakeout
Cecom diagnostic chamber HEBT
01.09.2020
DONE
Accepted
02.09.2020
Setup 1
04.09.2020
Cond. Accep.
23.09.20
M.Müller
Goto page
Previous
1
,
2
,
3
, 4,
5
...
7
,
8
,
9
Next
All
ELOG V3.1.5-fc6679b