Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 8 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  147   Fri Aug 20 09:21:08 2021 Cristinatest with bakeoutDiagnostic chambers (2)   19.08.21DONENot Needed14.09.21Customised25.09.21Cond. Accep.02.11.2021M. Mueller    
  148   Wed Sep 15 10:29:42 2021 Cristinatest with bakeoutAl chamber    DONENot Needed02.09.21Mobile 313.09.21Accepted16.09.21N.Staldmann    
  149   Tue Sep 21 11:38:16 2021 Phetest without bakeoutKyocera ceramics - 4x On schedule 21.09.2021DONE 23.09.21Mobile 315.10.21Accepted      
  150   Tue Sep 28 11:55:07 2021 Cristinatest without bakeoutBPM with ceramic   12.09.21DONENot Needed14.09.21Mobile 316.09.21Refused28.09.21M.Müller    
  151   Wed Oct 20 11:25:04 2021 Phetest without bakeoutBPM Chambers - 2x On schedule 20.10.2021DONENot Needed21.10.21 27.10.21Cond. Accep.02.11.21M.Mueller    
  Draft   Tue Nov 2 09:06:05 2021 Phetest without bakeoutCecom chamber for FAT K2030-1123, 06004016122 On schedule  on-going           
  153   Mon Nov 8 15:10:43 2021 Phetest with bakeoutSIS100 bunch compressor with ceramic gap On schedule 08.11.2021DONENot Needed25.11.21Setup 101.12.21Accepted      
  154   Wed Nov 17 11:46:15 2021 Cristinatest with bakeoutCoated Al sheet metall bent (Brandau)   5.11.21DONENot Needed8.11.21Setup 115.11.21Cond. Accep.03.02.22R.Sanchez    
  155   Wed Nov 17 11:48:30 2021 Cristinatest without bakeoutFluorescence chamber SIS100   12.11.21DONEAccepted17.11.21Mobile 318.11.21Accepted      
  156   Wed Nov 17 11:50:00 2021 Cristinaleak checkSIS100 bunch compressor   15.11.21DONENot Needed16.11.21Customised17.11.21Accepted      
  157   Wed Nov 17 11:51:00 2021 Cristinatest with bakeoutSecond SIS100 injection Septa     DONENot Needed11.11.21Customised19.11.21Cond. Accep.      
  158   Thu Dec 2 11:08:38 2021 Cristinatest without bakeoutBPM   30.11.21DONENot Needed02.12.21Mobile 306.12.21Accepted23.02.22M.Müller    
  159   Thu Dec 9 11:41:47 2021 Cristinatest with bakeoutTube with ceramic gap- resistence study   03.12.21DONENot Needed06.12.21Setup 109.12.21 Dec 21     
  160   Thu Dec 9 11:42:50 2021 Cristinatest without bakeoutBPM   07.12.21DONENot Needed09.12.21Mobile 313.12.21Cond. Accep.17.12.21Müller    
  161   Wed Jan 12 08:40:00 2022 Cristina Windows for ESR   10.01.22DONENot Needed13.01.22Setup 221.10.22Cond. Accep.03.02.22R.Sanchez    
  162   Wed Jan 12 08:40:41 2022 Cristina XHU detector ESR   16.12.21DONENot Needed12.01.22Setup 126.01.22Cond. Accep.24.02.22D.Winters    
  163   Tue Jan 18 08:50:13 2022 Cristinatest with bakeoutMirror chamber ESR (Brandau)   16.01.22DONENot Needed17.01.22Customised31.01.22Cond. Accep.31.01.22ESR    
  164   Tue Jan 18 08:51:15 2022 Cristinatest without bakeoutGrids for pLinac (Siebert)07.01.22  17.01.22DONENot Needed19.01.22HEBT Setup31.01.22Cond. Accep.31.01.22T.Sieber    
  165   Wed Feb 9 14:19:51 2022 Cristinatest without bakeoutCECOM chamber   KW5DONENot Needed08.02.2022Customised09.02.22Accepted M.Müller    
  166   Tue Feb 15 09:56:13 2022 Cristinatest without bakeoutNTG chamber HEBT special installation   03.02.22DONENot Needed10.02.22Customised14.02.22Cond. Accep.25.06.22S.Zeller    
ELOG V3.1.5-fc6679b