  50   Wed May 11 22:45:22 2022 Max, Wilfried, PatrickGeneralscanning wavelength
The scan parameters for the next shift are:

in COBRACONTROL:

increment: 0,005nm

from position: 601,62nm

to position: 601,405nm

These are the wavelengths in air!


The wavelength in vacuum we expect is: 601.832nm

You can check the current wavelength in vacuum on the wavemeter in the LabView GUI.

edit: In the night shift, we checked the scanned vacuum wavelengths in the wavemeter and also checked the expected transition wavelength.
The resonance should be very much in the center of the above mentioned scan range.
The increment corresponds to 4.1 GHz steps. Is this small enough?
  98   Tue May 31 15:19:58 2022 Max, Carsten, DanyalGeneralscans for different E-cool currents
until 15:15 we have measured with I_e = 100 mA (3 loops per file) 
E_cool HV = 225255 V 


after that (at 15:26) we changed to I_e = 200 mA (2 loops per file) 
E_cool HV = 225272 V 

after that (at 17:15) we changed to I_e = 50 mA (first 4 then 6 loops per file) 
E_cool HV = 225247 V 
  34   Tue May 10 23:53:42 2022 RodolfoGeneralshift change
The night shift took over. They are trying now to overlap the ion and laser beams.
  39   Wed May 11 06:41:32 2022 Simon, Christopher, ShahabRunsshifts
new shift started.
  48   Wed May 11 22:04:30 2022 Phillip, Wilfried, MaxGeneralspacial laser - ion overlap verified
After the SIS/ESR optimization we checked the spatial overlap with the T-scrapers again.

The values are:
devicemove in dir.scratch (mm)gone (mm)
GECEDS1VUup -3.0 -2.2
GECEDS1HAright -22.9 -22.0
left -11.0 -13.0
GECEDS2VUup -4.5 -2.7
GECEDS2HAright -21.0 -19.6
left -7.8 -8.4


The beam position is approx. as before. The laser position is still good and we have spatial overlap.
  52   Wed May 11 23:36:24 2022 Ruijiu Chen, Carsten, GuyDAQstart NTCAP.
Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
RF-Attenuation(dB):40
IF-Attenuation(dB):19.9288
Samples/Record:2^18=262144
Records/File:2^12=4096
Masterpath:p:\208Bi\iq\IQ_2022-05-10_17-06-29
           p:\208Bi\sc\IQ_2022-05-10_17-06-29
Free space of hard disk: 34.9TB.
  74   Mon May 16 19:20:55 2022 Max, WilfriedAnalysisstart go4 before laser scan
It is necessary to start go4 before you start the laser scan. Otherwise you get an offset in the laser Step plots.
  24   Mon May 9 19:56:41 2022 ZoranAcceleratorstatus Monday evening
The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport and the devices for the 
ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment before tomorrow morning.

=> the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
=> the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.

The ESR cave is closed again. Talk to the main control room if you need access.
  25   Tue May 10 09:05:19 2022 ZoranAcceleratorstatus Monday evening
> The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport 
and the devices for the 
> ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment 
before tomorrow morning.
> 
> => the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
> => the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.
> 
> The ESR cave is closed again. Talk to the main control room if you need access.

Status SIS on Monday evening. ESR setting up starting on Tuesday morning. There is some prospect of getting more ions by setting up multi-multiturn 
injection, however still uncertain.
Attachment 1: 22-05-09_200006_20220509_170137_tcl1024_dcct.png
22-05-09_200006_20220509_170137_tcl1024_dcct.png
  26   Tue May 10 11:40:55 2022 SebastianAcceleratorstill no beam @ESR
There is still no Beam in the ESR.

The beam is currently at TE3 - between SIS and ESR
  109   Fri Jun 3 12:01:17 2022 DanyalDetectorsswitched off XUV detector on 1 June ~17:00
I have switched off the XUV detector on 1 June at about 17:00. 
The high voltages of the MCP (in ESR laser lab) were turned off and inside the ESR cave the power supplies (coils and cathode) and the crate were turned off. 
Also the new "control box" for the detector was switched off. 
And I checked (visually) that the XUV detector (and the Cu detector too) were indeed "moved out". 

Danyal