HOME ESR EXPERIMENTS LABS etc
NucAR lab laser_lab Fritz-Bosch-Lab X-Ray Lab target Beavertail
  Beavertail, Page 1 of 1  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Text Attachments
  1   Wed Jun 15 13:11:38 2022 Guy LeckenbyDAQSignal DiagramAttached is the signal mapping that will be
used for the BEAVERTAIL test.
 Beavertail_Signal_Map.pdf 
  2   Fri Jun 17 15:32:47 2022 Guy LeckenbyElectronicsPreamp SettingsBias Select: In general, higher bias resistors
-> lower electronic noise. However, higher
resistance = larger voltage drop due to leakage
 Preamp_Settings.png 
  3   Mon Jun 20 10:36:56 2022 Guy LeckenbyDAQDAQ Startup CommandsThree terminals/processes are required to
record data on a local machine.
1. log in x86l-131. 
  
  4   Tue Jun 21 02:37:07 2022 Guy Leckenby, Iris Dillmann, Chris GriffinGeneralRun notesBeam: 208Pb(82+), 269.0 MeV/u, ~2*10^7 ions
in ESR
 Pocket-drive.pngecooler-current.png208Pb82_Beam-Lifetime.png 
  5   Wed Jun 22 18:01:18 2022 Guy LeckenbyDetectorsDetector ArrangmentAttached is the detector arrangement for the
3 setups used during the tests.
 Detector_Setups_for_Test.pdf 
  6   Wed Jun 22 19:14:12 2022 Guy LeckenbyDAQFBEX Script ChoicesHere were the f_user.c choices we implemented
for this experiment.
 f_user.c 
  7   Tue Jun 28 17:42:53 2022 Guy LeckenbyDAQCabling ChangesIn the previous signal map, I incorrectly
mapped the DSSD channels. To correctly read
out the DSSD for the new test, we will swap
 DSSD_New_Ch.png 
  8   Fri Jul 29 15:33:08 2022 Guy LeckenbyElectronicsResults of Noise TestingUwe and I were able to get some noise testing
done before the ESR was closed with asbestos
exposure. We used the new flange so didn't
 PLEIADES_Noise_-_coupled_to_ESR.jpgPLEIADES_Noise_-_isolated_from_ESR.jpg 
  9   Mon Nov 7 14:14:38 2022 Chris Griffin, Guy LeckenbyElectronicsMSI-8 module detailsMSI-8 module details.

MMPR1 card configurations:
  
  10   Fri Nov 11 10:27:59 2022 Chris Griffin, Guy LeckenbyDetectorsCurrent leakage currentsAttached are photos of leakage currents for
the current GAGG and BGO setups.
This setup uses the new flange (blue gas
 Housing1-GAGG.jpgHousing2-BGO.jpg 
  11   Tue Nov 15 14:30:25 2022 Chris GriffinElectronicsOld flange noiseLast week we tested both the new and old flanges
with the GAGG housing set up described in
the previous ELog entry.
 oldFlange-MPR.jpg 
  12   Thu Nov 17 13:42:16 2022 Chris GriffinDetectorsDetector config changesI have changed the configuration of Housing
2 (BGO) to account for the detector being
fixed (bond wires) and provide a "plug-and-play"
  
  14   Mon May 29 12:23:48 2023 Guy Leckenby, Chris GriffinElectronicsOld flange noise re-testsWhilst constructing a new flange to replace
the old one, we did some tests again to compare
the performance of new vs old flange.
 26.05.23-MHLab-Old_Flange_Biased_No_Grnd_Con_n-sides.PNG26.05.23-MHLab-OF-B-YGC-n-sides.PNG26.05.23-ESR-OF-B-YGC-n-sides.PNG26.05.23-ESR-OF-B-YGC-p-sides.PNG26.05.23-ESR-NF-B-NGC-n-sides.PNG 
  15   Thu Jun 1 09:39:24 2023 Guy Leckenby, Chris GriffinElectronicsNew new flange testWe tested the new new flange using the same
setup as in ELOG entry 14. The noise level
seemed to be somewhere between the middle
 31.05.23-ESR-NNF-YGC-n-sides.PNG31.05.23-ESR-NNF-NGC-n-sides.PNG31.05.23-ESR-NNF-YGC-n-sides-v2.PNG 
  16   Thu Jun 1 10:42:31 2023 Guy LeckenbyElectronicsSummary of Preamp TestingMSI-8 and MPR-16 preamps have nominal differential
output ranges of +/-1.8V and +/-1.2V respectively
at maximum input (ie 5GeV).
 preamp_tests.png 
  17   Tue Dec 12 12:57:16 2023 JanDAQtest lmd-files with pulserWe took a few lmd-files with different settings
of the febex DAQ to provide data for go4
development, when the DAQ is not running.
  
ELOG V3.1.5-fc6679b