HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay 2024, Page 1 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue May 21 11:09:15 2024, Yuri, General, Logbook for beam tuning. 20240521_logbook3.pdf
The version with better resolution is on our wiki page.
[URL=https://wiki.gsi.de/pub/ESR_EXP/E0018Experiment/20240521_logbook3.pdf]https://wiki.gsi.de/pub/ESR_EXP/E0018Experiment/20240521_logbook3.pdf[/URL]
Entry  Tue May 21 08:50:06 2024, Yuri, Accelerator, EoB 
End of beamtime!
Request is out.
Scrapers are removed, slits in the TE line removed, ESR is ramped down.
Entry  Tue May 21 03:27:21 2024, K.Takiura Y.Kikuchi, Runs, Beam back 
03:26 Beam is back.
Entry  Tue May 21 03:07:58 2024, K.Takiura Y.Kikuchi, Runs, No beam 
03:07 Beam is down.
Entry  Mon May 20 14:02:03 2024, Jelena, Oliver, Shahab, DAQ, Retune 245 MHz 
Mew numbers for 245 MHz plunger is 190 (both)
Entry  Mon May 20 13:31:09 2024, Jelena, Oliver, Shahab, General, New setting focussing on 96-Sr 
plunger 150 for 250
plunger 48 for 410 
Entry  Mon May 20 13:26:55 2024, Jelena, Oliver, Shahab, General, Plunger values 
plunger 150 for 250
plunger 48 for 410 
Entry  Mon May 20 09:01:51 2024, Oliver, Jelena, General, Shift news 
Data collection runs smooth so far.

Yuri Litvinov will start modifying SP magnets now. The resolution will change.
Entry  Mon May 20 09:01:14 2024, Yuri, Accelerator, Modify SP magnets 
In attempt to remove double-peak structure, we will modify the SP magnets
START: 9:02
SP unchanged. Other values lead to a worse peak shapes.
Entry  Mon May 20 05:32:17 2024, Gregor, Cagla, Accelerator, Short beam interruption 
We lost the beam for ~2min at (from ~5:28 till ~5:30). Everything seems to be back at the same state.
Entry  Sun May 19 17:48:15 2024, xing xu, hongfu, shahab, Runs, Beam back 
beam is back, first file 17:47
Entry  Sun May 19 15:13:48 2024, xing xu, hongfu, Runs, No beam 
beam is down 14:45. Problem with UNILAC. may take an hour.
Entry  Sun May 19 14:17:57 2024, Shahab, Kanika,hongfu li,xing xu, DAQ, center frequency change for 96Sr 
aiming for 96-Sr:

Entry  Sun May 19 14:11:29 2024, Yuri, Sergey, Accelerator, Sextupoles 
at 13:00
scrapers in the ESR are moved to block the most outside orbits
E02DS3HG out -> -60 mm
Entry  Sun May 19 12:04:55 2024, Kanika, Accelerator, Beam back 
The beam is back.
Entry  Sun May 19 11:02:49 2024, Xu Zhou, Yuhu Zhang, Kanika, Accelerator, the beam is paused 
The beam is paused and HHT team needs to enter the ring.
Entry  Sat May 18 16:45:15 2024, Helmut, Yury, Accelerator, setting for 96Sr (98Y) TEline-ESR-100Mo_98Y.lpp2024-05-18_17-03-55_ESR_ISO_13May24_98Y.C1.txt2024-05-18_17-05-31_SIS18_FAST_ESR_100Mo_13May24_98Y.C1.txt
To have a few more lines the setting actually is not on 96Sr directly, but on 98Y39+.
98Y is also the one set to be isochronous. 
But in addition the SIS-energy is shifted by -0.9 MeV/u to get at least better transmission for 96Sr.
Entry  Sat May 18 16:29:15 2024, Filip, Taka, Shahab, Runs, Good operation screen shot 2024-05-18_16-27-32-898.png
 
Entry  Sat May 18 16:21:30 2024, Taka, Filip, Shahab, DAQ, DAQ start 
16:21 DAQ restart for 96Sr

Acq. time 300 ms, 50 MS/s, span 25 MHz
Entry  Sat May 18 15:26:46 2024, Taka, Filip, DAQ, DAQ stop 
15:20 RSA DAQ stop -> Sr setting
ELOG V3.1.5-fc6679b