HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay 2024, Page 1 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Text Attachments
  114   Tue May 21 11:09:15 2024 YuriGeneralLogbook for beam tuning.The version with better resolution is on our
wiki page.
[URL=https://wiki.gsi.de/pub/ESR_EXP/E0018Experiment/20240521_logbook3.pdf]https://wiki.gsi.de/pub/ESR_EXP/E0018Experiment/20240521_logbook3.pdf[/URL]
 20240521_logbook3.pdf 
  113   Tue May 21 08:50:06 2024 YuriAcceleratorEoBEnd of beamtime!
Request is out.
Scrapers are removed, slits in the TE line
  
  112   Tue May 21 03:27:21 2024 K.Takiura Y.KikuchiRunsBeam back03:26 Beam is back.   
  111   Tue May 21 03:07:58 2024 K.Takiura Y.KikuchiRunsNo beam03:07 Beam is down.   
  110   Mon May 20 14:02:03 2024 Jelena, Oliver, ShahabDAQRetune 245 MHzMew numbers for 245 MHz plunger is 190 (both)   
  109   Mon May 20 13:31:09 2024 Jelena, Oliver, ShahabGeneralNew setting focussing on 96-Srplunger 150 for 250
plunger 48 for 410 
  
  108   Mon May 20 13:26:55 2024 Jelena, Oliver, ShahabGeneralPlunger valuesplunger 150 for 250
plunger 48 for 410 
  
  107   Mon May 20 09:01:51 2024 Oliver, JelenaGeneralShift newsData collection runs smooth so far.

Yuri Litvinov will start modifying SP magnets
  
  106   Mon May 20 09:01:14 2024 YuriAcceleratorModify SP magnetsIn attempt to remove double-peak structure,
we will modify the SP magnets
START: 9:02
  
  105   Mon May 20 05:32:17 2024 Gregor, CaglaAcceleratorShort beam interruptionWe lost the beam for ~2min at (from ~5:28
till ~5:30). Everything seems to be back
at the same state.
  
  104   Sun May 19 17:48:15 2024 xing xu, hongfu, shahabRunsBeam backbeam is back, first file 17:47   
  103   Sun May 19 15:13:48 2024 xing xu, hongfuRunsNo beambeam is down 14:45. Problem with UNILAC. may
take an hour.
  
  102   Sun May 19 14:17:57 2024 Shahab, Kanika,hongfu li,xing xuDAQcenter frequency change for 96Sraiming for 96-Sr:

  
  101   Sun May 19 14:11:29 2024 Yuri, SergeyAcceleratorSextupolesat 13:00
scrapers in the ESR are moved to block the
most outside orbits
  
  100   Sun May 19 12:04:55 2024 KanikaAcceleratorBeam backThe beam is back.   
  99   Sun May 19 11:02:49 2024 Xu Zhou, Yuhu Zhang, KanikaAcceleratorthe beam is pausedThe beam is paused and HHT team needs to enter
the ring.
  
  98   Sat May 18 16:45:15 2024 Helmut, YuryAcceleratorsetting for 96Sr (98Y)To have a few more lines the setting actually
is not on 96Sr directly, but on 98Y39+.
98Y is also the one set to be isochronous.
 TEline-ESR-100Mo_98Y.lpp2024-05-18_17-03-55_ESR_ISO_13May24_98Y.C1.txt2024-05-18_17-05-31_SIS18_FAST_ESR_100Mo_13May24_98Y.C1.txt 
  97   Sat May 18 16:29:15 2024 Filip, Taka, ShahabRunsGood operation screen shot   2024-05-18_16-27-32-898.png 
  96   Sat May 18 16:21:30 2024 Taka, Filip, ShahabDAQDAQ start16:21 DAQ restart for 96Sr

Acq. time 300 ms, 50 MS/s, span 25 MHz
  
  95   Sat May 18 15:26:46 2024 Taka, FilipDAQDAQ stop15:20 RSA DAQ stop -> Sr setting   
ELOG V3.1.5-fc6679b