HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  nuclear two-photon decay 2024, Page 4 of 6  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  54   Thu May 16 16:38:11 2024 Ide, HubbardRunsNo beam to ESRbecause of problems in HHT
no beam from 16:36
  
  53   Thu May 16 16:10:03 2024 Ide, HubbardRunsLassie ScreenshotLassie Screenshot taken at 16:09  2024-05-16_16-08-02-778_tcl1064.png.pdf 
  52   Thu May 16 15:24:30 2024 Ide, HubbardAcceleratornew Plunger settingplunger motors were set

to +/-390 mm for 245 MHz resonator
  
  51   Thu May 16 14:52:45 2024 ShahabDAQZr recordingRecording Zr starting from 14:45 again back
to short cycle.
  
  50   Thu May 16 13:04:02 2024 Mayr, HannesRunsDAQ stopped, change setting to 98ZrBeam tuning for 98Zr starting at 12:53, following
data should be excluded from analysis. DAQ
was stopped around 13:13.
  
  Draft   Thu May 16 12:48:58 2024 SergeyAcceleratorTune to 98Zr- stop longer measurements
- change quadrupole and sextupole magnets
- rescale SIS-TE-ESR
  
  48   Thu May 16 11:20:10 2024 SergeyAcceleratorScreenshot of ESR pattern with 140 repetitions (each is 100 ms)Injection Beam Process: 100ms
Bunching Beam Process: 16ms
Intermediate Beam Process: 100 ms, which
 2024-05-16_11-19-01-545.png 
  47   Thu May 16 11:13:05 2024 Mayr, HannesRunsRatesWith the new timing, the rates now look like
can be seen in the screenshot.
 2024-05-16_11-10-57-933_tcl1064.png 
  46   Thu May 16 11:08:27 2024 Mayr, HannesRunsDAQ running again"Real" measurement with good data starting
from 11:07 until approximately 13:00.
Measurement time was changed to 10s with
  
  45   Thu May 16 10:18:14 2024 Mayr, HannesRunsBeam back, DAQ offBeam is back since 10:10, but DAQ is turned
off to change the setting there.
Measurements starting at 10:18 are only test
  
  44   Thu May 16 09:41:56 2024 Mayr, HannesRunsNo beamNo beam from 09:39 to 10:10 due to a setting
change. The change aims to increase the measurement
time to 10s.
  
  43   Thu May 16 08:58:39 2024 Mayr, HannesRunsFluctuations in particle rateParticle rates are fluctuating and increasing
from a constant 5e8 to something around 1e9.
 2024-05-16_08-58-00-964_tcl1064.png 
  42   Thu May 16 07:50:39 2024 Mayr, HannesRunsPeaks with very high particle ratePeaks in the particle diagram going to unusual
high 1.4e9 particles.
 2024-05-16_07-49-53-757_tcl1064.png 
  41   Thu May 16 07:25:33 2024 Mayr, HannesRunsLassie Screenshot 07:23Start of regular screenshots of the Lassie
monitor every 1-2 hours.
 2024-05-16_07-23-30-208_tcl1064.png 
  40   Thu May 16 04:37:27 2024 Boguslaw, CamilleRunsNo beam to ESRWe had no beam in ESR for about 3 minutes  2024-05-16_04-38-44-446_tcl1064.png 
  39   Thu May 16 00:37:41 2024 Boguslaw, CamilleRunsInjection pattern changedThe injection pattern changed on Lassie monitor
(0:27 AM). (picture 1)
 2024-05-16_00-34-07-585_tcl1064.png2024-05-16_01-53-34-896_tcl1064.png2024-05-16_03-10-00-258_tcl1064.png 
  38   Wed May 15 23:04:32 2024 XinliangAnalysisElectron cooler dataThe cooler curve measured during May 14 afternoon.  20240515230302.pngdata_2024_-_sergey.xlsxiso.xlsx 
  36   Wed May 15 20:40:51 2024 Jeroen, JohanRunsBeam returned to ESR20:39:42 Runs restarted.  2024-05-15_20-40-22-391_tcl1064.png2024-05-15_22-01-28-310_tcl1064.png 
  35   Wed May 15 20:17:20 2024 JeroenAcceleratorFewer spills from SIS18 then lost beamApparently fewer spills coming from SIS18,
see attached.
 2024-05-15_20-16-49-990_tcl1064.png2024-05-15_20-18-47-422_tcl1064.png 
  34   Wed May 15 19:45:44 2024 Helmut WeickAcceleratorCooler curves after beam shiftAfter the Beam position tuning but before
the scraper tuning two more cooler curves
were taken.
 curce_1.PNGcurce_2.PNGisoc_curves_15052024.xlsx 
ELOG V3.1.5-fc6679b