HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025, Page 3 of 5  Not logged in ELOG logo
Entry  Mon May 12 10:09:21 2025, Christopher, Nils, Accelerator, Intervention TK Chopper - no beam for one hour 
At 11am there will be an intervention for about one hour related to the TK chopper - hence no beam for SIS as well as ESR.
During that time, the pneumatic drives within ESR will be mechanically checked (lubricated).
Entry  Mon May 12 14:47:52 2025, Christopher, DAQ, frequency counter BG7TBL_FA-2_Frequency_Counter_Operator_Manual-62519_English_Ed.pdf
FA-2 frequency counter
Entry  Mon May 12 21:39:49 2025, Zoran, Runs, DR running again with Bi209 
Stronger spectra than before, probably due to a stronger overlap with the electron beam.
Open files starting with run_0022, finished with 0025, each one about 6 min charge breeding and 11 min ramp
ntcap stopped, electron current 500 mA, DC beam
Entry  Mon May 12 22:44:00 2025, Zoran, Runs, 209Bi bunched beam 
ntcap restarted (05-12_22-22-23), measuring with bunched beam
10 min breeding time
Entry  Mon May 12 23:34:39 2025, Carsten, Analysis, Sample DR Spectra DR_209Bi_500mA_newESR_settings.pngDR_209Bi_500mA_newESR_settings_bunched.png
See attachment - electron current 500 mA.
First spectrum DC,
Second spectrum bunched.
Entry  Tue May 13 00:05:39 2025, Konstantin, Calibration, Cooler HV 
The DR measurement was repeated with proper electron cooler settings. Readout of electron cooler HV is not affected by the Grafana failure and can be displayed
in Medusa in the View "Log-Display". Measured voltages in Subchain 8 are:
Entry  Tue May 13 00:36:27 2025, Finn, Simon, Konstantin, , DR measurements. Night shift. 
[TABLE border="1"]
Time |File | PTB 32 | PTB 33 | Ohmlabs | ESR intensity SC8 | Typical SIS injections | comments |-
00:18 | 27 | 205819 | 205819 | 205812 | 2.24e7 | 4e8 | |-
Entry  Tue May 13 00:43:31 2025, Konstantin, General, Connection interrupt 
Connection reset to all NUCs by accident manual power cut.
Entry  Tue May 13 12:59:49 2025, Carsten, Wilfried, Christopher, Nils, General, Setup of ESR for 208Bi 
In the morning the colleagues from ESR setup the beam for production of 208Bi81+, however the identification (via the schottky) of the correct fragments
and charge states is still ongoing.
Entry  Tue May 13 15:34:23 2025, Yuri, Calibration, Particle Identification 
Setting on 208Bi81+
Manipulation after accumulation and orbit shift, before slowing down
Entry  Tue May 13 17:46:35 2025, Carsten, Runs, Start of DR measurements with 208Bi DR_208Bi_500mA_unbunched(DC).pngDR_208Bi_500mA_unbunched(DC)_true_counts.png
Same ramps as before, 8 repetitions.
ESR is set-up for breeding of 208Bi80+.
In order to reduce unwanted primary at injection to the ESR, in the transfer line scrapers are in use, presently GTE4DS5HL -5.0, GTE4DS5HR +7.0
Entry  Tue May 13 21:37:09 2025, Carsten, Runs, DR run with bunched beam / 500 mA /208Bi80+ 
Just changed settings towards a new scanning range and bunched beam.
Stopped and started NTCAP, now: IQ_2025-05-13_21-01-44
new ADC file
Entry  Wed May 14 00:11:52 2025, Dimitrios, Simon, Runs, Night shift DR Bi-208 Screenshot_2025-05-14_06-33-45.png
[TABLE border="1"]
Time |File | PTB 32 | PTB 33 | Ohmlabs | ESR intensity SC8 | Typical SIS injections | comments |-
00:15 | 36 | 205860 | 205861 | 205853 | 0 | 8e8 | something killed the beam after deceleration, particle detectors look fine|-
Entry  Tue May 13 01:21:16 2025, Konstantin, Simon, Analysis, Longitudinal bunch length Bildschirmfoto_2025-05-13_01-24-40.pngBildschirmfoto_2025-05-13_01-33-06.pngBildschirmfoto_2025-05-13_01-38-19.png
We measured the longitudinal bunch length for all different detectors

[TABLE border="1"]
    Reply  Wed May 14 02:19:46 2025, Dimitrios, Simon, Analysis, Longitudinal bunch length Bildschirmfoto_2025-05-14_02-16-42.pngBildschirmfoto_2025-05-14_02-17-58.pngBildschirmfoto_2025-05-14_02-15-05.png
We repeated this measurement for 208-Bi. The bunch lengths are about half as long (due to lower space charge and consequently less heating?)

[TABLE border="1"]
Entry  Wed May 14 06:31:28 2025, Dimitrios, Simon, Runs, DR scans @300mA 
We reduced the electron cooler current to 300mA and continued measuring the DR spectrum.

[TABLE border="1"]
Entry  Wed May 14 08:24:39 2025, Danyal, Nils, Hendrik Day shift, Runs, DR scans @300mA 
Continuing with the measurements of the last shift, also at 300mA. Creating new file, as beam got killed during last run.

[TABLE border="1"]
Entry  Wed May 14 11:59:39 2025, Nils, Analysis, Current DR spectra 208Bi DR_208Bi_300mA_raw.pngDR_208Bi_300mA_Time_normalized_.png
Results so far for the DR scans @300mA e-cooler current.
Entry  Wed May 14 12:43:43 2025, Danyal, Nils, Hendrik Day shift, Runs, DR scans @300mA 
Continuing with the measurements of the last shift, also at 300mA. Creating new file, as beam got killed during last run.

[TABLE border="1"]
Entry  Wed May 14 19:06:51 2025, Carsten, Runs, Different pattern/ Fixes during the day new runs for 300 mA (increased intensities) DR_208Bi_300mA_optimized_ion_beam.pngDR_208Bi_300mA_optimized_ion_beam_cts.png
During the day several things were discussed concerning intensity and the pressurized air devicees.
In total 6 to 7 different things are not ok for a proper opreation of the devices (not to be discussed here).
Entry  Wed May 14 22:05:54 2025, Rodolfo, Laser, Laser settings 
Here are summarized some settings of the laser system.

[B]Dye:[/B] Pyrromethene 597 in Ethanol 
ELOG V3.1.5-fc6679b