ID |
Date |
Author |
Category |
Subject |
Text |
 |
46
|
Sun Jun 22 21:36:48 2025 |
Carsten, Finn, Zac, Esther | Runs | First laser scans |
[B] Scan parameters:[/B]
[TABLE border="1"]
|
|
60
|
Wed Jun 25 05:53:54 2025 |
Rodolfo | Laser | FCU | Cobra's FCU was recalibrated. Table saved
as FCU_547-554_RS_2024-06-25.fcu. |
|
Draft
|
Fri Jun 27 06:13:02 2025 |
Esther, Konstantin | Runs | Early shift - data taking | [B]Notes:[/B]
1. TE slits at -10 and +10
2. SIS intensity unstable until about 9:00 |
|
31
|
Sat Jun 21 00:23:22 2025 |
Rodolfo | Laser | Dye | I have prepared new (fresh) dye solutions
of Fluorescein 27: 2 charges. They are in
the Safety Cabinet (Sicherheitsschrank) in |
|
7
|
Wed Jun 11 16:44:39 2025 |
Carsten, Jan | Detectors | Detector voltages and thresholds for DAQ2 (Mesycontrol) | Voltages (2650v) for the small band 9423 is
ok. Signals are nicely separated from background,
thresholds can be easily set.
|
|
59
|
Tue Jun 24 22:24:36 2025 |
Carsten, Finn, Hiroshi, Esther, Rodolfo | Runs | Data taking (night shift 24.06.) |
[B] Scan parameters:[/B]
[TABLE border="1"]
|
|
8
|
Wed Jun 11 17:33:04 2025 |
Carsten, Jan | DAQ | DAQ2 - new computer , new directories (lxg0155 doesn't work reliably) | LXG0155 (used in form er beamtimes) crashes
and hangs and hangs eventually.
|
|
11
|
Fri Jun 13 18:14:02 2025 |
Konstantin, Carsten | DAQ | DAQ Folder | Dryrun of DAQs. Folders of the data are:
|
|
50
|
Mon Jun 23 01:01:17 2025 |
Carsten | Detectors | CAEN PMT Power supply | Since yesterday, channel 0 of the CAEN PS
is dead (no voltage even without cable).
Changed detector south to channel 3. |
|
21
|
Wed Jun 18 03:12:25 2025 |
Rodolfo | Laser | Beam Stabilization | The laser beam pointing has changed, even
thought the MRC settings are the same as
given in Entry 5 (this elog). This could |
|
47
|
Sun Jun 22 22:29:04 2025 |
Carsten | Accelerator | Backup copy of present accelerator settings - don't use if you don't know what you are doing | # Version: 1.3
# Comment: ParamModi Export at 2025-06-22T22:28:05.633712878+02:00[Europe/Berlin]
# Context: ESR_25_12_THORIUM_20June_v3.C1
|
|
29
|
Fri Jun 20 11:25:32 2025 |
Julien, Kristian, Konstantin | Laser | Automated laser scans | In contrast to entry [URL=https://elog.gsi.de/esr/E0052_2025/12]E12[/URL],
the cabling for the automated start of the
laser scan is now connected to [B]IO3 of |
|
27
|
Wed Jun 18 20:24:01 2025 |
Carsten, Shahab, Ragandeep, Danyal et al. (the dayshift) and ESR crew | Accelerator | 229Th89+ identification | We believe to have identified the 237U92+
and the 229Th89+ peaks.
|
|