HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025, Page 4 of 4  Not logged in ELOG logo
ID Date Author Category Subject
  7   Wed Jun 11 16:44:39 2025 Carsten, JanDetectorsDetector voltages and thresholds for DAQ2 (Mesycontrol)
Voltages (2650v) for the small band 9423 is ok. Signals are nicely separated from background, thresholds can be easily set.
For the broadband 9422 the voltage is by far too low. Signals and BG are barely separated.
Increased voltage from 1500V to 1750V (according to datasheet Vmax = 2500V, 1500 V is the min voltage for gain 1e6...).
Now signals are better separated - threshold with mesycontrol can be set in such a way that the dark count rate is 300 - 400 Hz (was > 1kHz).
For detector south, the threshold in DAQ1 has to be readjusted.

Below are the settings for Mesytec CFD. Internally the 2nC chips (x 20 ??? ) are used for both groups. Please note that thre are also 20nC chips in "parking position" (lower amplfication).
The Mesytec PMT CFD Version uses "nC" chips while the other Mesytec Shapers "gain / amplification", i.e. chips labeled with 20 are x20 and have a large amplification while the "nC" chips give the full scale range , aka the 20nC is tghe small amplification.

Note as well: Externally, the channel numbering starts with "1" while the Mesycontrol starts with "0".

The sum of all Mesytec signals defines the gate for the ADC.
Group 4-7 are the x100 signals (similar to Vuprom TDC). These signals go to the 25ps TDC and are used for timing, and to the ADC.
Group 0-3 is x10; thresholds are artificially set slightly too high, signals are used in the ADC only. Since these are the same signals as in the x100 group, their (correct) gate signals can be used in the ADC. The x10 capture also the very high signals.

ch 0(1): PMT South x10 (A).
ch 1(2): PMT Mid x10 (B).
ch 2(3): PMT North x10 (C).

ch 4(5): PMT South x100 (B).
ch 5(6): PMT Mid x100 (D).
ch 6(7): PMT North x100 (F).
Attachment 1: Mesytec_CFD_Settings_2025-06-11_17-17-33.png
Mesytec_CFD_Settings_2025-06-11_17-17-33.png
  6   Wed Jun 11 11:20:23 2025 Konstantin, SimonDAQoctal gate generator delays
We checked the set delays of the OG 8000 octal gate generator and compared them with the values measured before the Bi-beamtime (see entry 34).
All values match within an uncertainty of <1ns


OG 8000 delay / ns
Photodiode North 62
Photodiode South 66.2
PMT South 157.5
PMT Middle 156.6
PMT North 159.4
Particle South 329.8
  5   Fri Jun 6 14:27:10 2025 Rodolfo, KonstantinLaserMRC Beam Stabilization Presettings
These are the settings for the Beam Stabilization from MRC.

Laser-beam energy ca. 18 mJ @ 275 nm
Attachment 1: MRC-Settings_2025_06-06.JPG
MRC-Settings_2025_06-06.JPG
Attachment 2: AFG_Settings_Thorium_2025-06-06.jpg
AFG_Settings_Thorium_2025-06-06.jpg
Attachment 3: MRC-Controller_Settings_Thorium_2025-06-06.jpg
MRC-Controller_Settings_Thorium_2025-06-06.jpg
  4   Wed Jun 4 16:18:57 2025 Rodolfo, SimonDetectorsPMT dark count rates
I adjusted the offsets of the amplifiers in the cave and measured the dark count rates :

PMT Model Operation Voltage Count rate (Hz)
South ET9422B Broadband -1500 V 1300
Middle ET9423B Smallband -2650 V 20
North ET9423B Smallband -2650 V 30



Also the MCP anode of the XUV detector is now connected to the amplifiers and fed to the data cable of "PMT Cu".




Quote:
This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025


PMT Model SN Operation Voltage Threshold
South ET9422B 1042 Broadband -1500 V
Middle ET9423B 653 Smallband -2650 V 10 (preliminary)
North ET9423B 652 Smallband -2650 V 12 (preliminary)
  3   Wed Jun 4 16:17:47 2025 SimonDetectorsNitrogen
The nitrogen supply for the PMTs is turned ON.
  2   Mon Jun 2 16:36:57 2025 CarstenDetectorsMesycontrol
ssh -Y litv-exp@x86l-204
'mesycontrol'
Attachment 1: MSCF16-F-V.pdf
MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf
  1   Tue May 20 16:14:30 2025 Rodolfo, SimonDetectorsPMT arrangement at ESR
This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025


PMT Model SN Operation Voltage Threshold
South ET9422B 1042 Broadband -1500 V
Middle ET9423B 653 Smallband -2650 V 10 (preliminary)
North ET9423B 652 Smallband -2650 V 12 (preliminary)
Attachment 1: PMT_Arrangement_2025-05-20.jpg
PMT_Arrangement_2025-05-20.jpg
ELOG V3.1.5-fc6679b