HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  laser spectroscopy on Be-like Kr, Page 5 of 5  Not logged in ELOG logo
Entry  Mon Jan 27 16:57:07 2025, Sebastian, DAQ, COM Ports Gentec Messkopf NW und SW Tower @ ESR 
COM 5 Südwest Tower --> Laser EXIT
COM 6 Nordwest Tower --> Laser ENTRANCE
Entry  Mon Jan 27 16:55:46 2025, Sebastian, General, DLC Pro IP Adresse 
SISDEV007
140.181.91.46
Entry  Mon Jan 27 11:06:21 2025, Sebastian, General, Optiken ESR Lab, NW und SW eingebaut 
Die Optiken (Layertec 2" und 3") ab TEM Spiegel ESR Lab 
bis ESR TEM Spiegel eingebaut.
Entry  Mon Jan 27 10:59:22 2025, Sebastian, DAQ, RedPitaya  
[B]Hostname: ext-91000370132.gsi.de
IP-Adresse: 10.100.3.106
[/B]
Entry  Fri Jan 24 16:36:10 2025, Rodolfo, General, Cameras Kamera_NW_ATPDEV005_IRIS-IN.PNGKamera_SW_APDEV17_IRIS-OUT.PNG
I have installed two cameras, which can be used to monitor the position of the laser beam. In order to access them (only at GSI) via a browser just type
the "device's name" follow by "gsi.de"
Entry  Fri Jan 24 15:06:51 2025, Rodolfo, Detectors, Solar Blind PMTs Be-like-Kr_Detektoren_2025-01-24.jpgPMT9423_SN650_Datenblatt.pdf
We (Danyal and Rodolfo) have installed two "solar-blind" PMTs from "ET Enterprises" Model 9423B to the "mirror chamber" at ESR . See attached picture.

- PMT NORD. Serial Nummer: 650. For the operating voltage plear see the attached PDF file, PMT9423_SN650_Datenblatt.
Entry  Fri Dec 13 13:44:13 2024, Sebastian, Runs, test 
test 123
Entry  Fri Dec 13 13:39:05 2024, Danyal, General, Test 
Test
ELOG V3.1.5-fc6679b