HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  laser spectroscopy on Be-like Kr, Page 3 of 5  Not logged in ELOG logo
Entry  Thu Feb 27 21:23:02 2025, Jens, DAQ, Python Data Channels 
Python variables and names in DAQ
Because the Name of variables in DAQ doesnt match the the real variables, here is List of the channels and what value is in this channel
Entry  Thu Feb 27 20:21:31 2025, Sebastian, General, 10 MHz Ref Clock (Butis) 
10 MHz Referenz Clock von BUTIS mit AFG als externl clock verbunden.
Wird benötigt das die Bunch Kavität (DDS System) in Phase mit AFG (Laserreprate) ist.
Entry  Thu Feb 27 16:30:57 2025, Konstantin und Rodolfo, DAQ, HF Signal 
We have exchanged the HF-Signal in the DAQ Electronic: from Dummy-HF to the real HF from accelerator. 
Entry  Thu Feb 27 11:19:55 2025, Danyal, Accelerator, pictures of the ion beam from 26.02.2025  Schottky_pick-up_Bild.jpgSchottky_resonator_Bild.jpggebunchter_Strahl_im_ESR.jpg
Hier sind noch ein paar Bilder vom Ionenstrahl , wie er gestern Abend war.
Entry  Thu Feb 27 10:52:32 2025, Rodolfo, Detectors, Taking PMTs into operation 20250227_105411.jpg20250227_143518.jpg
[B]PMT Nord[/B] the power supply (CH0) is giving an alarm already by an applied voltage of -1707 V (operation voltage is -2450 V). It is leaking to much
current, larger than the set value of 310 uA. See attached picture 20250227_105411.jpg .
Entry  Thu Feb 27 09:59:08 2025, Konstantin, Calibration, HV-Divider 
The readout of the HV divider runs on a RaspberryPi inside the HV-cave of the electron cooler.
Starting from 2025-02-27 09:42, the divider ratio was changed from 248517 to 248515. Usually, the
readout should run continuously. If not, the following procedure must be applied:
Entry  Thu Feb 27 09:38:04 2025, Konstantin & Danyal, Detectors, Laufzeit Messungen 
Gestern Abend haben wir die Signal Laufzeiten im gemessen:

PMT Mitte: 1213 ns (bis zur Messhütte ohne DAQ sind es 1025 ns) 
Entry  Wed Feb 26 18:53:52 2025, Danyal, Accelerator, ESR settings 
Date: 26.02.2025 @  18:35

E-cooler:  HV = 157366 +/- 1 V  (HV divider value)
Entry  Tue Feb 25 14:51:52 2025, Danyal, General, Experiment Acceptance 
Today, 25 FEB 2025 at 9:00 AM, our experiment was reviewed carefully by the safety committee. 
The experiment was accepted without problems. 
All was fine, only minor comments were made and only a few short-notice actions were required. 
Entry  Tue Feb 25 13:12:01 2025, Sebastian, DAQ, Teilungsverhältnis Ohmlabs HVS250 Bericht_PTB_verbesserter_Teiler_2018.pdfMaßstabsfaktoren.JPG
Hochspannung Maßstabsfaktoren

-140 kV >>> 248514
Entry  Thu Feb 20 13:51:04 2025, Denise, Sebatian, DAQ, DAQ Channelliste 
[TABLE border="1"]
TDC Channels |
|- 
Entry  Thu Feb 20 13:37:30 2025, Denise, Sebastian, DAQ, CFD Schwellen DAQ 
Schwellen fuer den CFD N842 (lascool)
Lasereinstellungen dabei waren: 0.5 Skalenteile -> 115ps Pulse
3.56654MHz Reprate
Entry  Thu Feb 20 00:45:00 2025, Danyal, General, Doppler width of M1 transition 
According to Paul Indelicato

transition 3P1 -> 3P0  in 78Kr32+ : 
Entry  Mon Feb 17 13:49:20 2025, Denise, General, Frequenzbreiten Ionensystem 
Berechnung der Frequenzbreiten des Lasers im Ionensystem 
Werte für die Frequezbreiten des Lasers aus Dissertation Benedikt Langfeld übernommen
Entry  Fri Feb 14 16:41:54 2025, Sebastian , General, Verkabelung PD ESR IMG_8368.jpeg
Verkabelung von den Photodioden im ESR. Sind auch gelabelt.

PD gehen zuerst einmal in den FAMP (10x Verstärkung) 
Entry  Fri Feb 14 16:24:22 2025, Denise, General, Strahlprofil UV im ESR  IMG_8360.jpeg796a74f2-ec76-4396-82e5-9d3209b36612.jpeg0bbd839a-f6cf-4fa4-a5a4-71d0c84044fa.mov
Erstes Bild ist das Strahlptofil in Höhe des Nord 
towers. 
Zweites Bild (mit Millimeterpapier) und Video zeigt 
Entry  Thu Feb 13 12:56:01 2025, Danyal, General, ESR access - monday (whole day) 8-18 hr 
 
Entry  Thu Feb 13 12:55:13 2025, Danyal, General, ESR access - tomorrow (Fri) 10:00 - 12:00 
 
Entry  Wed Feb 12 12:48:48 2025, Danyal, General, ESR access  
We had the chance to shortly enter the ESR, between 10:45 and 11:30. 

- We repositioned the PSDs of the TEM system. 
Entry  Tue Feb 11 13:08:32 2025, Danyal, Accelerator, limited access to ESR this week 
Hitrap will kein ESR Zugang erlauben bevor 22 Uhr. Außerdem merken die, wenn ESR-SIS nicht laufen, dass sie morgens immer 1 Stunde Zeit verlieren weil nicht
"angefordert" wurde. Deswegen wollen sie, dass ESR-SIS nachts auch weiter Strahl anfordern, etwa 1 mal pro 5 Minuten. Aber wir finden schon noch eine Lücke
um reinzugehen.
ELOG V3.1.5-fc6679b