HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 12 of 17  Not logged in ELOG logo
Entry  Tue Apr 1 22:03:07 2025, Jeroen, Zac, Esther, Shahab, Wolfram, DAQ, Optimisation of settings 
Estimation of potential gain by changing. Files from this points are going to rubbish. Potential gains are c. 20% 

22:04: The current acquisition window is recording for 2.9 s. And is not recording for 3.9 s. We are running currently with a spill cycle of 5s every repetition.

22:22 The spill cycle between each injection was changed to 4->3->2s progressively and FRS also stopped taking spills so we settled on 2s spill request.

In the morning the spill request has to be changed back to 5s when the FRS goes back into operation.

new file with the setting is

RSA01-2025.04.01.22.19.06.761.tiq

[analysis]
nframes = 190
lframes = 65536
navg = 1
Entry  Tue Apr 1 20:00:14 2025, Jeroen, Zac, Esther, Accelerator, Beam fell out 
No beam from 19:57:41.
    Reply  Tue Apr 1 20:02:19 2025, Jeroen, Zac, Esther, Accelerator, Beam fell out 
> No beam from 19:57:41.

Beam back from 20:02
    Reply  Tue Apr 1 20:19:23 2025, Jeroen, Zac, Esther, Accelerator, Beam fell out 2025-04-01_20-17-10-651_tcl1064.png
> > No beam from 19:57:41.
> 
> Beam back from 20:02
    Reply  Tue Apr 1 16:44:32 2025, Jeroen, Esther, General, No SIS beam since 14:35 2025-04-01_16-47-13-677_tcl1146.png2025-04-01_16-47-10-870_tcl1146.tdf
Beam resumed at 16:40. 
Entry  Tue Apr 1 20:37:04 2025, Jeroen, DAQ, Change of settings for shorter acq. window 
Acquisition stopped at 20:36. 

First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq

Last file from this setting: RSA01-2025.04.01.20.36.54.257.tiq

acq. length changed to 500 ms

acq bw changed to 50 MHz

==> 12 MSamples

Trigger window condition set to 50%.

First file from this setting: RSA01-2025.04.01.20.45.40.053.tiq

Analysis setting the the frame length 2^16 and frame number = 190.
Entry  Mon Apr 7 07:09:01 2025, Jelena, Guy, Accelerator, Beam interruption, FRS 
Beam is gone since 7:02. Control room is notified. Beam is back since 7:14. FRS started taking spills.
Entry  Mon Apr 7 08:03:07 2025, Jelena, Guy, General, Lassie screenshots 2025-04-07_08-00-16-559.png2025-04-07_08-00-30-113.png2025-04-07_08-01-02-170.png2025-04-07_08-01-06-617.png
 
Entry  Mon Apr 7 09:16:17 2025, Jelena, Guy, General, Lassie screenshots 2025-04-07_09-14-56-204.png2025-04-07_09-14-50-804.png2025-04-07_09-14-22-416.png2025-04-07_09-14-14-074.png
 
Entry  Mon Apr 7 10:04:49 2025, Jelena, Guy, General, Lassie screenshots 2025-04-07_10-02-10-801.png2025-04-07_10-02-07-117.png2025-04-07_10-01-23-120.png2025-04-07_10-01-31-280.png
 
Entry  Mon Apr 7 10:49:04 2025, Jelena, Guy, General, Beam stops for tuning 
We stop taking beam at 10:47 for tuning a new setting. 

Team PLEIADES is wanting to get access for 10 mins to install a remote oscilloscope, so entry to the ESR has been requested. 
Entry  Mon Apr 7 12:29:16 2025, Jelena, Guy, General, Lassie screenshots 2025-04-07_12-28-34-271.png2025-04-07_12-28-26-706.png2025-04-07_12-28-50-809.png2025-04-07_12-28-46-565.png
 
Entry  Mon Apr 7 13:18:27 2025, Jelena, Guy, General, Tuning 2025-04-07_13-17-37-105.png2025-04-07_13-17-28-724.png2025-04-07_13-17-58-900.png2025-04-07_13-17-54-807.png
Beam was gone at 13:04 due to fragment tuning.
Entry  Mon Apr 7 14:05:40 2025, Jelena, Guy, General, Lassie screenshots 2025-04-07_14-03-27-506.png2025-04-07_14-03-33-525.png2025-04-07_14-03-47-372.png2025-04-07_14-03-44-209.png
 
Entry  Tue Apr 1 06:53:51 2025, Jelena B,Siddharth, General, Lassie Monitor 2025-04-01_06-49-59-989_tcl1064.png
 
Entry  Tue Apr 1 08:36:25 2025, Jelena B, Siddharth, General, Lassie 2025-04-01_08-37-32-155_tcl1064.png 2025-04-01_08-37-32-155_tcl1064.png
 
Entry  Tue Apr 1 10:03:56 2025, Jelena B, Siddharth, General, Technical issue with SIS18  2025-04-01_10-02-16-454_tcl1064.png
From HKR info: there is a technical issue with SIS18 and we will have no beam for next 25 minutes. 
Entry  Tue Apr 1 10:34:20 2025, Jelena B, Siddharth, General, Resolved issue with SIS18 2025-04-01_10-33-38-948_tcl1064.png
Beam is back with some fluctuations.
We did not have beam from 9:34 until 10:08, around 35 minutes. 
Entry  Tue Apr 1 11:47:14 2025, Jelena B, Siddharth, General, Lassie 2025-04-01_11-46-35-517_tcl1064.png  2025-04-01_11-46-35-517_tcl1064.png
 
Entry  Tue Apr 1 12:58:27 2025, Jelena B, Siddharth, General, Lassie 2025-04-01_12-57-50-275_tcl1064.png
 
ELOG V3.1.5-fc6679b