HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  masses & isomeres 2025, Page 15 of 17  Not logged in ELOG logo
Entry  Sat Apr 5 11:04:22 2025, Hannes, Cagla, General, Beam back 
The beam is back as before since 11:02.
Entry  Sat Apr 5 12:03:23 2025, Hannes, Cagla, General, Lassie screenshots 2025-04-05_12-02-57-892.png2025-04-05_12-02-51-503.png2025-04-05_12-03-22-319.png2025-04-05_12-03-41-597.png
 
Entry  Sat Apr 5 12:59:08 2025, Hannes, Cagla, General, Lassie screenshots 2025-04-05_12-59-26-722.png2025-04-05_12-59-07-111.png2025-04-05_13-00-24-333.png2025-04-05_13-00-15-781.png
 
Entry  Sat Apr 5 14:02:54 2025, Hannes, Cagla, General, Lassie screenshots 2025-04-05_14-03-09-807.png2025-04-05_14-02-50-834.png2025-04-05_14-03-58-456.png2025-04-05_14-03-52-527.png
 
Entry  Sat Apr 5 15:01:03 2025, Hannes, Cagla, General, Lassie screenshots 2025-04-05_15-01-39-374.png2025-04-05_15-01-22-352.png2025-04-05_15-01-59-451.png2025-04-05_15-02-06-386.png
 
Entry  Mon Mar 31 20:42:38 2025, H. Weick, S. Litvinov, Accelerator, fragment setting, E-SIS 
~ 20:00 changed E-SIS to 524.0 MeV/u to get 194Pb at the Brho of the primary beam before (=7.2008 Tm).
which corresponds to gamma = 1.400 for 194Pb82+. 
Before it was E-SIS = 480.5 MeV/u after Be-1839 mg/m^2 target Brho = 7.2014 Tm.
Keep target and beamlines and ESR the same, only SIS and TE-line before target is changed.
Entry  Tue Apr 1 02:37:28 2025, H. Weick, S. Litvinov, Accelerator, Isoc-setting +scrapers IMG_20250401_013626.jpgIMG_20250401_013636.jpgIMG_20250401_013646.jpgIMG_20250401_023358.jpg
First a setting with orbit bump for injection on central orbit was tried.
- quadrupoles tuned and scrapers optimized

Then back to an ESR setting without this bump like last year.
- again quadrupoles tuned and scrapers optimized
This gave a good resolution in which the isomer should be resolved.

Just after this was achieved all resolution was lost.
Making the input for ESR setting again recovered it, now with slightly different scrapers.

Quads: K'L Q3D / Q6D = -0.3603263
Sext: K''L GE01KS2 = -0.14
           GE01KS3 =  0.05

scrapers: GEEXDS1HA =  -5 mm
          GE01DS3HG = -70 mm 

Details see paper scans below.
Entry  Fri Apr 4 17:04:39 2025, H. Weick, S. Litvinov, Accelerator, slits after target, Bio_REM alarm primary_beam_on_TE4_slits.JPG
A Bio-REM detector on the roof of ESR caused an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we avoid it by catching the primary beam at TE4 slits.
The distribution on current grids looks liek in the LISE simulation, we cut at 5mm.
The beam come sin three charge states tehouter ones 82+, 81+ anyway do not make it to ESR, we need to cut also the 80+ at least half.
Then the dose rate on ESR roof is much lower 0.8 uSv/h -> 0.2 uSv/h.
Entry  Fri Apr 4 17:10:35 2025, H. Weick, S. Litvinov, Accelerator, ESR scraper setting 
the new scraper setting for good isochronicity but still acceptable intensity losses is:
Done at ~ 15:00 today.
GEEXDS1HA (outside)          =  -8 mm
GEEXDS1HG (ToF-det-aperture) =  20.5 mm
GE01DS3HG                    = -84.2 mm  (fully open is -130 mm)
in addition, a detector pocket is in GE01DD2IG = 1.7 mm
Entry  Thu Mar 27 17:20:40 2025, Esther, Yue, Carlo, Zac, Shahab, Detectors, Setup Genesys 2025-03-27_17-19-33-724.png
We set up the Genesys. Channel map:

tr0:
IO1: Trigger MBS
IO2: Trigger NTCAP
IO3: None
IO4: Trigger RSA01
IO5: Trigger RSA02

tr1: 
None
Entry  Wed Apr 9 06:47:51 2025, Esther, Nikos, General, Brief beam interruptions 2025-04-09_06-44-13-080_tcl1064.png2025-04-09_06-44-10-755_tcl1064.tdf
There was no beam from SIS between about 06:28 and 06:39.

Again from 07:02 to 07:11.

And again from 07:49 to 07:55.
Entry  Mon Mar 31 17:46:21 2025, Esther, DAQ, NTCAP scaler assignment 
The setup contains two NI-6612 I/O cards with BNC-2121 connector accessories that provide eight inputs each for TTL scaler signals.
Important: When connecting scaler signals make sure that they are TTL (not NIM)!

Additionally, there is the possibility to assign data streams (eg clocks) from other modules in the NI chassis to scaler channels.
Below you find the assignment of the channels on the software side, including the internal clocks. This is important when analysing the .tmds files.

ChannelInputComment
010 MHz clockexternal (from NI 6674T timing module)
1DC trafoion current in ESR
2injection triggerfrom Genesys (IO2 on sddsc221)
3U-coolercooler voltage
4I-coolercooler electron current
5P-gunpressure at e-cooler
6100 kHz clockinternal
720 MHz clockinternal
8software triggerfrom Detectomer
9PLEIADES outside
9PLEIADES inside
Entry  Tue Apr 1 22:53:59 2025, Esther, General, Lassie exports 2025-04-01_22-53-17-548_tcl1146.png2025-04-01_22-53-21-680_tcl1146.tdf
 
Entry  Wed Apr 9 11:18:27 2025, Esther, DAQ, NTCAP off, RSA triggers disconnected 
The NTCAP computer and crate are switched off.
The triggers are disconnected from the RSAs, but they remain on.
Entry  Fri Apr 4 18:38:52 2025, Dima, Zac, Sid, Kanika, Ragan, Shahab, Beatriz, DAQ, new file name and settings for 245 MHz IMG_4981.JPGIMG_4982.JPG
new settings:
1.8 seconds recording on 245 MHz on RSA02

starting from file name:

2025.04.04.18.36.32.895


settings are in the attachment
Entry  Sat Apr 5 18:24:09 2025, Dima, Zac, Shahab, DAQ, RSAs stop again, due to misses IMG_4991.JPGIMG_4992.JPG
RSAs had to stop because the cycle of 1.8 came too often, both analyzers could not catch up with the file transfer.


changed to 1.7 seconds

last file in the 1.8 setting:

RSA01-2025.04.05.18.20.46.005
RSA02-2025.04.05.18.20.43.346


new filenames from the 1.7 s settings:

RSA01-2025.04.05.18.28.12.146.tiq

new analysis settings:

[analysis]
nframes = 80
lframes = 131072
avg = 4




Explanation:

every file has 10625050 samples with 1.7 seconds length
sampling rate: 6.25 MSPS
this means every sample is worth: 1.6e-7 seconds
this means every frame with length of 2^17 samples will have a time length of: 21 ms
finally with an averaging of 4 frames into one, this means that every time frame in the NPZ file will have 80ms length



frequency setting

please see attached pictures.
Entry  Wed Apr 2 01:46:52 2025, Chris, Carlo, Zac, General, Beam loss 
HKR just called to say a power supply to the SIS18 extraction kicker has failed.
The service person has been called and is expected to take ~1h to arrive and approx. ~2h to carry out the repair.
Entry  Wed Apr 2 05:48:31 2025, Chris, Carlo, Zac, General, Beam returned 
Beam was returned to the ESR at 05:11.

HKR said there had been some problem with one of the dipoles and in order to restore it a power supply had to be reset, which took some time.

05:41 data are back in the RSAs. Files that contain data from:
RSA01-2025.04.02.05.41.14.938.tiq_spectrogram.npz
to:
RSA01-2025.04.02.06.24.01.530.tiq_spectrogram.npz


06:24 data not visible again, only noise.

06:43 data are ack in the RSAs. Files that contain data from:
RSA01-2025.04.02.06.43.43.580.tiq_spectrogram.npz
Entry  Wed Apr 2 02:51:31 2025, Carlo, Zac, Chris, DAQ, Beam is back 
02:44 beam is back
Entry  Wed Apr 2 04:33:57 2025, Carlo, Zac, Chris, DAQ, Screenshots Lassie 2025-04-02_04-28-59-944_tcl1064.png2025-04-02_03-38-54-877_tcl1064.png
screenshots of Lassie
ELOG V3.1.5-fc6679b