New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Apr 2 07:39:41 2025, Michael, Alex, General, The beam is back at 07:35 
 
Entry  Wed Apr 2 07:33:59 2025, Michael, Alex, General, Beam gone again 
7:29, beam gone again, operators say they need another 5 minutes.
Entry  Wed Apr 2 07:25:15 2025, Carlo, Chris, Alex, Michael , General, Beam back 
07:20  we have beam back.
Entry  Wed Apr 2 07:16:33 2025, Carlo, Chris, Alex, Michael, DAQ, ESR not requesting 
7:05 ESR not requesting new pulses from the SIS. 
Operators are trying to fix the problem.
Entry  Wed Apr 2 05:48:31 2025, Chris, Carlo, Zac, General, Beam returned 
Beam was returned to the ESR at 05:11.

HKR said there had been some problem with one of the dipoles and in order to restore it a power supply had to be reset, which took some time.
Entry  Wed Apr 2 04:59:50 2025, Zac, Chris, Carlo, General, Receiving injections but not seeing anything on RSAs 2025-04-02_05-18-32-212_tcl1146.png2025-04-02_05-21-50-973_tcl1146.png
Starting at around 04:09 we don't see anything on RSAs. RSAs are still triggering and writing files, but only see noise. Lassie indicates beam current in
the ESR
Entry  Wed Apr 2 04:33:57 2025, Carlo, Zac, Chris, DAQ, Screenshots Lassie 2025-04-02_04-28-59-944_tcl1064.png2025-04-02_03-38-54-877_tcl1064.png
screenshots of Lassie
Entry  Wed Apr 2 02:51:31 2025, Carlo, Zac, Chris, DAQ, Beam is back 
02:44 beam is back
Entry  Wed Apr 2 01:46:52 2025, Chris, Carlo, Zac, General, Beam loss 
HKR just called to say a power supply to the SIS18 extraction kicker has failed.
The service person has been called and is expected to take ~1h to arrive and approx. ~2h to carry out the repair.
Entry  Wed Apr 2 00:59:43 2025, Zac, Carlo, Chris, Accelerator, Lost the beam 
Beam was lost from 00:44 until 00:59
Entry  Wed Apr 2 00:08:57 2025, Ruijiu Chen,Shahab, Analysis, the peak corresponding to 194Pb⁸²⁺ was mixed with signals from some unknown ions. photo_2025-04-02_00-12-38.jpgphoto_2025-04-02_00-12-43.jpg
I examined the spectrum of 194Pb at the 211 harmonic. It was observed that the peak corresponding to 194Pb82+ was mixed with signals 
from some unknown ions. Consequently, we switched to the 212 harmonic, where the frequency of 194Pb82 was measured at 410.5385024.
Entry  Tue Apr 1 23:56:18 2025, Shahab, Carlo, Zac, Yue, Michael, DAQ, Change of RSA01 settings for new harmonic=212. 
23:55 stop the RSAs. 

410:
Entry  Tue Apr 1 23:23:18 2025, C Griffin, General, PLEIADES removed 
Leakage currents were steadily increasing in the PLEIADES detectors so we decided to stop taking data, move both the detectors back and turn off bias.
Entry  Tue Apr 1 23:07:15 2025, Shahab, DAQ, short interruption of queqiao script for RSAs 
has been restored.
Entry  Tue Apr 1 22:53:59 2025, Esther, General, Lassie exports 2025-04-01_22-53-17-548_tcl1146.png2025-04-01_22-53-21-680_tcl1146.tdf
 
Entry  Tue Apr 1 22:05:24 2025, Ruijiu , Analysis, analysis result 202504012157.png202504012157.pdf202504012206.pngphoto_2025-04-01_22-43-41.jpg
This is a preliminary result during 4:00-19:00 April 1st 2025. 
I correct the frequency drift of 194Pb82+ ions injection by injection.
Entry  Tue Apr 1 22:03:07 2025, Jeroen, Zac, Esther, Shahab, Wolfram, DAQ, Optimisation of settings 
Estimation of potential gain by changing. Files from this points are going to rubbish. Potential gains are c. 20% 

22:04: The current acquisition window is recording for 2.9 s. And is not recording for 3.9 s. We are running currently with a spill cycle of 5s every repetition.
Entry  Tue Apr 1 20:37:04 2025, Jeroen, DAQ, Change of settings for shorter acq. window 
Acquisition stopped at 20:36. 

First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq
    Reply  Tue Apr 1 21:05:20 2025, Jeroen, Zac, Esther, Shahab, Wolfram, DAQ, Change of settings for shorter acq. window 
> Acquisition stopped at 20:36. 

> First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq
Entry  Tue Apr 1 20:00:14 2025, Jeroen, Zac, Esther, Accelerator, Beam fell out 
No beam from 19:57:41.
    Reply  Tue Apr 1 20:02:19 2025, Jeroen, Zac, Esther, Accelerator, Beam fell out 
> No beam from 19:57:41.

Beam back from 20:02
       Reply  Tue Apr 1 20:19:23 2025, Jeroen, Zac, Esther, Accelerator, Beam fell out 2025-04-01_20-17-10-651_tcl1064.png
> > No beam from 19:57:41.

> Beam back from 20:02
Entry  Tue Apr 1 17:08:13 2025, JG, ID, MC, CG, Detectors, pleiades in position 
The pleiades detectors are now moved into a position which does not disturb the stored beam. 

inner detector: BGO