Leakage currents were steadily increasing in the PLEIADES detectors so we decided to stop taking data, move both the detectors back and turn off bias.
The repair of SIS electron cooler power supplies In the meantime we received a few injections and confirmed that 194Pb setting is still as it was before entering into the ESR Now we change to 208Pb82+ to do several ESR accelerator tests Esis = 517 MeV/u Change the beamline to 208 Pb 82+ and the ESR to 208 b 82+ and NO other changes
07:20 we have beam back.