HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 15 of 17  Not logged in ELOG logo
ID Date Authordown Category Subject
  189   Sat Apr 5 11:04:22 2025 Hannes, CaglaGeneralBeam back
The beam is back as before since 11:02.
  191   Sat Apr 5 12:03:23 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_12-02-57-892.png
2025-04-05_12-02-57-892.png
Attachment 2: 2025-04-05_12-02-51-503.png
2025-04-05_12-02-51-503.png
Attachment 3: 2025-04-05_12-03-22-319.png
2025-04-05_12-03-22-319.png
Attachment 4: 2025-04-05_12-03-41-597.png
2025-04-05_12-03-41-597.png
  193   Sat Apr 5 12:59:08 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_12-59-26-722.png
2025-04-05_12-59-26-722.png
Attachment 2: 2025-04-05_12-59-07-111.png
2025-04-05_12-59-07-111.png
Attachment 3: 2025-04-05_13-00-24-333.png
2025-04-05_13-00-24-333.png
Attachment 4: 2025-04-05_13-00-15-781.png
2025-04-05_13-00-15-781.png
  194   Sat Apr 5 14:02:54 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_14-03-09-807.png
2025-04-05_14-03-09-807.png
Attachment 2: 2025-04-05_14-02-50-834.png
2025-04-05_14-02-50-834.png
Attachment 3: 2025-04-05_14-03-58-456.png
2025-04-05_14-03-58-456.png
Attachment 4: 2025-04-05_14-03-52-527.png
2025-04-05_14-03-52-527.png
  197   Sat Apr 5 15:01:03 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_15-01-39-374.png
2025-04-05_15-01-39-374.png
Attachment 2: 2025-04-05_15-01-22-352.png
2025-04-05_15-01-22-352.png
Attachment 3: 2025-04-05_15-01-59-451.png
2025-04-05_15-01-59-451.png
Attachment 4: 2025-04-05_15-02-06-386.png
2025-04-05_15-02-06-386.png
  11   Mon Mar 31 20:42:38 2025 H. Weick, S. LitvinovAcceleratorfragment setting, E-SIS
~ 20:00 changed E-SIS to 524.0 MeV/u to get 194Pb at the Brho of the primary beam before (=7.2008 Tm).
which corresponds to gamma = 1.400 for 194Pb82+. 
Before it was E-SIS = 480.5 MeV/u after Be-1839 mg/m^2 target Brho = 7.2014 Tm.
Keep target and beamlines and ESR the same, only SIS and TE-line before target is changed.
  20   Tue Apr 1 02:37:28 2025 H. Weick, S. LitvinovAcceleratorIsoc-setting +scrapers
First a setting with orbit bump for injection on central orbit was tried.
- quadrupoles tuned and scrapers optimized

Then back to an ESR setting without this bump like last year.
- again quadrupoles tuned and scrapers optimized
This gave a good resolution in which the isomer should be resolved.

Just after this was achieved all resolution was lost.
Making the input for ESR setting again recovered it, now with slightly different scrapers.

Quads: K'L Q3D / Q6D = -0.3603263
Sext: K''L GE01KS2 = -0.14
           GE01KS3 =  0.05

scrapers: GEEXDS1HA =  -5 mm
          GE01DS3HG = -70 mm 

Details see paper scans below.
Attachment 1: IMG_20250401_013626.jpg
IMG_20250401_013626.jpg
Attachment 2: IMG_20250401_013636.jpg
IMG_20250401_013636.jpg
Attachment 3: IMG_20250401_013646.jpg
IMG_20250401_013646.jpg
Attachment 4: IMG_20250401_023358.jpg
IMG_20250401_023358.jpg
  160   Fri Apr 4 17:04:39 2025 H. Weick, S. LitvinovAcceleratorslits after target, Bio_REM alarm
A Bio-REM detector on the roof of ESR caused an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we avoid it by catching the primary beam at TE4 slits.
The distribution on current grids looks liek in the LISE simulation, we cut at 5mm.
The beam come sin three charge states tehouter ones 82+, 81+ anyway do not make it to ESR, we need to cut also the 80+ at least half.
Then the dose rate on ESR roof is much lower 0.8 uSv/h -> 0.2 uSv/h.
Attachment 1: primary_beam_on_TE4_slits.JPG
primary_beam_on_TE4_slits.JPG
  161   Fri Apr 4 17:10:35 2025 H. Weick, S. LitvinovAcceleratorESR scraper setting
the new scraper setting for good isochronicity but still acceptable intensity losses is:
Done at ~ 15:00 today.
GEEXDS1HA (outside)          =  -8 mm
GEEXDS1HG (ToF-det-aperture) =  20.5 mm
GE01DS3HG                    = -84.2 mm  (fully open is -130 mm)
in addition, a detector pocket is in GE01DD2IG = 1.7 mm
  3   Thu Mar 27 17:20:40 2025 Esther, Yue, Carlo, Zac, ShahabDetectorsSetup Genesys
We set up the Genesys. Channel map:

tr0:
IO1: Trigger MBS
IO2: Trigger NTCAP
IO3: None
IO4: Trigger RSA01
IO5: Trigger RSA02

tr1: 
None
Attachment 1: 2025-03-27_17-19-33-724.png
2025-03-27_17-19-33-724.png
  323   Wed Apr 9 06:47:51 2025 Esther, NikosGeneralBrief beam interruptions
There was no beam from SIS between about 06:28 and 06:39.

Again from 07:02 to 07:11.

And again from 07:49 to 07:55.
Attachment 1: 2025-04-09_06-44-13-080_tcl1064.png
2025-04-09_06-44-13-080_tcl1064.png
Attachment 2: 2025-04-09_06-44-10-755_tcl1064.tdf
  10   Mon Mar 31 17:46:21 2025 EstherDAQNTCAP scaler assignment
The setup contains two NI-6612 I/O cards with BNC-2121 connector accessories that provide eight inputs each for TTL scaler signals.
Important: When connecting scaler signals make sure that they are TTL (not NIM)!

Additionally, there is the possibility to assign data streams (eg clocks) from other modules in the NI chassis to scaler channels.
Below you find the assignment of the channels on the software side, including the internal clocks. This is important when analysing the .tmds files.

ChannelInputComment
010 MHz clockexternal (from NI 6674T timing module)
1DC trafoion current in ESR
2injection triggerfrom Genesys (IO2 on sddsc221)
3U-coolercooler voltage
4I-coolercooler electron current
5P-gunpressure at e-cooler
6100 kHz clockinternal
720 MHz clockinternal
8software triggerfrom Detectomer
9PLEIADES outside
9PLEIADES inside
  54   Tue Apr 1 22:53:59 2025 EstherGeneralLassie exports
Attachment 1: 2025-04-01_22-53-17-548_tcl1146.png
2025-04-01_22-53-17-548_tcl1146.png
Attachment 2: 2025-04-01_22-53-21-680_tcl1146.tdf
  329   Wed Apr 9 11:18:27 2025 EstherDAQNTCAP off, RSA triggers disconnected
The NTCAP computer and crate are switched off.
The triggers are disconnected from the RSAs, but they remain on.
  166   Fri Apr 4 18:38:52 2025 Dima, Zac, Sid, Kanika, Ragan, Shahab, BeatrizDAQnew file name and settings for 245 MHz
new settings:
1.8 seconds recording on 245 MHz on RSA02

starting from file name:

2025.04.04.18.36.32.895


settings are in the attachment
Attachment 1: IMG_4981.JPG
IMG_4981.JPG
Attachment 2: IMG_4982.JPG
IMG_4982.JPG
  210   Sat Apr 5 18:24:09 2025 Dima, Zac, ShahabDAQRSAs stop again, due to misses
RSAs had to stop because the cycle of 1.8 came too often, both analyzers could not catch up with the file transfer.


changed to 1.7 seconds

last file in the 1.8 setting:

RSA01-2025.04.05.18.20.46.005
RSA02-2025.04.05.18.20.43.346


new filenames from the 1.7 s settings:

RSA01-2025.04.05.18.28.12.146.tiq

new analysis settings:

[analysis]
nframes = 80
lframes = 131072
avg = 4




Explanation:

every file has 10625050 samples with 1.7 seconds length
sampling rate: 6.25 MSPS
this means every sample is worth: 1.6e-7 seconds
this means every frame with length of 2^17 samples will have a time length of: 21 ms
finally with an averaging of 4 frames into one, this means that every time frame in the NPZ file will have 80ms length



frequency setting

please see attached pictures.
Attachment 1: IMG_4991.JPG
IMG_4991.JPG
Attachment 2: IMG_4992.JPG
IMG_4992.JPG
  60   Wed Apr 2 01:46:52 2025 Chris, Carlo, ZacGeneralBeam loss
HKR just called to say a power supply to the SIS18 extraction kicker has failed.
The service person has been called and is expected to take ~1h to arrive and approx. ~2h to carry out the repair.
  64   Wed Apr 2 05:48:31 2025 Chris, Carlo, ZacGeneralBeam returned
Beam was returned to the ESR at 05:11.

HKR said there had been some problem with one of the dipoles and in order to restore it a power supply had to be reset, which took some time.

05:41 data are back in the RSAs. Files that contain data from:
RSA01-2025.04.02.05.41.14.938.tiq_spectrogram.npz
to:
RSA01-2025.04.02.06.24.01.530.tiq_spectrogram.npz


06:24 data not visible again, only noise.

06:43 data are ack in the RSAs. Files that contain data from:
RSA01-2025.04.02.06.43.43.580.tiq_spectrogram.npz
  61   Wed Apr 2 02:51:31 2025 Carlo, Zac, ChrisDAQBeam is back
02:44 beam is back
  62   Wed Apr 2 04:33:57 2025 Carlo, Zac, ChrisDAQScreenshots Lassie
screenshots of Lassie
Attachment 1: 2025-04-02_04-28-59-944_tcl1064.png
2025-04-02_04-28-59-944_tcl1064.png
Attachment 2: 2025-04-02_03-38-54-877_tcl1064.png
2025-04-02_03-38-54-877_tcl1064.png
ELOG V3.1.5-fc6679b