12:00 Outside particle detector moved out to parking position again (-125 mm)
11:37 Outside particle detector (GE01DD2AG) moved in to -100mm to take data
10:16 Moved outside particle detector back into parking position (-126mm)
9:53 Data taking with outside detector (GE01DD2AG) moved in to -110mm
We will need to enter the ESR to connect the cables again for our DAQ and then drive in the outside detector for 20min to get some data. 9:35 entered 9:41 exit 9:44 ESR available again
The beam is gone in ESR via TE (FAST) and also in SIS18_RING (FAST) starting from 07.51 am until 07.59 am.