HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 3 of 8  Not logged in ELOG logo
ID Date Author Category Subject
  120   Thu Apr 3 13:32:42 2025 CN, IDGeneralScreenshots
Attachment 1: 2025-04-03_13-31-16-104.png
2025-04-03_13-31-16-104.png
Attachment 2: 2025-04-03_13-31-21-711.png
2025-04-03_13-31-21-711.png
Attachment 3: 2025-04-03_13-31-42-214.png
2025-04-03_13-31-42-214.png
  119   Thu Apr 3 11:51:00 2025 CN, IDDAQRSA started for 188Hf ESR tuning
Started both RSAs for the tuning of the ESR to 188Hf. Both pockets are in parking position OUTSIDE.
  118   Thu Apr 3 10:07:34 2025 CN, ZP, CJG, MCGeneralScreenshots
Attachment 1: 2025-04-03_10-04-14-352.png
2025-04-03_10-04-14-352.png
Attachment 2: 2025-04-03_10-04-23-381.png
2025-04-03_10-04-23-381.png
Attachment 3: 2025-04-03_10-05-06-655.png
2025-04-03_10-05-06-655.png
  117   Thu Apr 3 09:53:02 2025 Ruijiu Chen,WolframAnalysisGood injection ratio
Currently, we only use 37% of the injections in our data analysis. However, 63% of the injections have a height below 100, and these may include 
single ion injections. We need to visually inspect these injections to identify the single ion injections.
Attachment 1: photo_2025-04-03_09-53-26.jpg
photo_2025-04-03_09-53-26.jpg
  116   Thu Apr 3 09:43:14 2025 AllAcceleratorStop 194Pb, switch to 208Pb82+
The repair of SIS electron cooler power supplies

In the meantime we received a few injections and confirmed that 194Pb setting is still as it was before entering into the ESR

Now we change to 208Pb82+ to do several ESR accelerator tests

Esis = 517 MeV/u
Change the beamline to 208 Pb 82+ and the ESR to 208 b 82+ and NO other changes
  115   Thu Apr 3 09:34:42 2025 IDGeneralFinished in the ESR as of 9:05
We had stopped the RSAs at 8:00 (call for restart)
Time stamp computer stopped and started at 9:35
  114   Thu Apr 3 08:02:04 2025 Team PLEIADES (JG, ID, CJG, MC)DetectorsEntering ESR for PLEIADES
We are going to enter the ESR to check on the PLEIADES pocket detectors and install a nitrogen cooling.
  113   Thu Apr 3 07:59:09 2025 ZP, CN, IDGeneralScreenshots
Screenshots before opening ESR.
Attachment 1: 2025-04-03_07-58-00-874.png
2025-04-03_07-58-00-874.png
Attachment 2: 2025-04-03_07-57-08-478.png
2025-04-03_07-57-08-478.png
Attachment 3: 2025-04-03_07-57-36-781.png
2025-04-03_07-57-36-781.png
  112   Thu Apr 3 06:56:31 2025 JEL, ZNRunsScreenshots
Attachment 1: 2025-04-03_06-55-08-030.png
2025-04-03_06-55-08-030.png
Attachment 2: 2025-04-03_06-54-58-081.png
2025-04-03_06-54-58-081.png
Attachment 3: 2025-04-03_06-55-25-792.png
2025-04-03_06-55-25-792.png
  111   Thu Apr 3 06:33:08 2025 Zac, JohanGeneralBeam lost at 06:27, returned at 06:34
Spike in beam intensity at 06:27 (5x usual intensity) and then beam is lost. HKR says it's a problem with the magnet's power supply. Once the beam returned, the peaks are shifted to the left but are slowly shifting back into position.
  110   Thu Apr 3 06:16:32 2025 JEL, ZNGeneralScreenshots
Stable since last entry
Attachment 1: 2025-04-03_06-15-12-250.png
2025-04-03_06-15-12-250.png
Attachment 2: 2025-04-03_06-15-00-458.png
2025-04-03_06-15-00-458.png
Attachment 3: 2025-04-03_06-14-54-153.png
2025-04-03_06-14-54-153.png
  109   Thu Apr 3 05:11:37 2025 Zac, JohanGeneralBeam lost at 05:07, returned at 05:14
  108   Thu Apr 3 03:48:40 2025 JEL, ZNRunsScreenshots
The peaks in the analyzer are slowly shifting back to the original position. 
Note that a quadrupole was the cause of the issue 45 mins ago and it was cycled.  Might be relevant...
Attachment 1: 2025-04-03_03-47-28-530.png
2025-04-03_03-47-28-530.png
Attachment 2: 2025-04-03_03-47-11-337.png
2025-04-03_03-47-11-337.png
Attachment 3: 2025-04-03_03-47-42-665.png
2025-04-03_03-47-42-665.png
  107   Thu Apr 3 02:59:15 2025 JEL, ZNRunsScreenshot, beam received, baem lost, beam back again
Beam is back for 10 mins-

The peaks on the analyzer appear shifted to the right.

As I write this the beam disappeared again.... 02.59

and back again at 03.08
Attachment 1: 2025-04-03_02-58-06-109.png
2025-04-03_02-58-06-109.png
Attachment 2: 2025-04-03_02-57-54-019.png
2025-04-03_02-57-54-019.png
Attachment 3: 2025-04-03_02-57-31-430.png
2025-04-03_02-57-31-430.png
  106   Thu Apr 3 02:52:27 2025 Zac, JohanGeneralBeam is back at 02:52
  105   Thu Apr 3 02:01:29 2025 Zac, JohanGeneralQuadrupole issues
HKR has called someone to fix the quadrupole, they think it will take about an hour.
  104   Thu Apr 3 01:56:57 2025 Zac, JohanGeneralProblems with one of the quadrupoles
Since around 01:45 we get spills but see nothing on analysers. HKR says there is a problem with one of the quadrupoles; they are working on it.
  103   Thu Apr 3 01:29:49 2025 Zac, JohanGeneralBeam is back at 01:27
  102   Thu Apr 3 01:19:44 2025 Zac, JohanGeneralBeam fluctuations
Beam gone again between 01:14 and 01:18, then again at 01:19. HKR says there are problems with the source.
  101   Thu Apr 3 01:14:16 2025 Zac, JohanGeneralBeam is back at 01:12
ELOG V3.1.5-fc6679b