HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 20     Entry time: Fri Mar 27 13:04:17 2020
Author: Ragan 
Category: General 
Subject: FRS Settings until now 
Yuri and Helmut have been extensively involved in tuning and optimizing of the FRS.

26th March, 2020 (Evening setting):
1) 206Pb67+ beam from SIS @401.17 MeV/u.
2) SEETRAM in target area of FRS is used for stripping the beam from SIS to get 206Pb81+ and is then transported to ESR @400 MeV/u. (SEETRAM consists of three Ti foils of ~10 um thickness which are used for stripping purpose (more info: https://www-win.gsi.de/frs-setup/ ))
3) SL1 slits are opened +-10 mm to get rid of other charge states of 206Pb and only transport 206Pb81+ through FRS.

27th March, 2020 (Evening setting):
1) Different target (Be 1-6 g/cm2 with Nb backing) and degrader (Al)thicknesses are used for the optimization of 206Pb81+ with matter in FRS to get the beam with @400 MeV/u in ESR.
2) 206Pb67+ beam from SIS @540-560 MeV/u.
Attachment 1: frs.pdf  270 kB  | Show | Show all
Attachment 2: FRS.pdf  4.700 MB  | Show | Show all
ELOG V3.1.5-fc6679b