  Bound beta decay experiment on Tl-205, Page 1 of 9  Not logged in ELOG logo
ID Date Authordown Category Subject
  80   Mon Mar 30 07:02:15 2020 tinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA
I_cooler = 20 mA

beam: 206Pb81+
energy: 400 MeV/u

purpose: data for the measurement of half life of 206Pb81+ due to its interaction with electron cooler and residual gas

Detector position (CsISiPHOS): 60 mm
Detector position (MWPC):     -10 mm

run start at 06:08 , run file: run0270.lmd  (0268.lmd and 0269.lmd are garbage files)
file running: 0270.lmd

_______________________________________________________________________________

time: 07:00

I_cooler = -01 mA

      
ESR particles:  2.2E5
        


NTCAp file:
SC_2020-03-30_06-11-08
IQ_2020-03-30_06-11-16
(saved in drive: p)

copy and repeat the above (below the line) every 30 minutes
  41   Sat Mar 28 16:12:25 2020 ruijiu, raganDAQenter ESR and turn on the HV crate.
  15   Tue Feb 25 15:48:31 2020 ruijiu chenDAQImportant folders of e121 eperiments:
1. slow control:
1.1. program file:
litv-exp@ringpi:~/epics/mrcc_ioc/db $ 
1.2 user interface:
litv-exp@lxg1298:~/E121/scripts/GUIe121_new

2. mbs:
2.1 user interface
litv-exp@lxg1298:~/E121/scripts$ ./e121_gui.py
2.2 source 
R4L-47 litv-exp > pwd                                                                                                                                                                                                                        
/esr/usr/litv-exp/2020_e121/                                                                                                                                                                                             
3. go4:
litv-exp@lxg1298:~/2019Munich-Det/Go4-Muenchen-3V785AH-1V830-simple$ go4
4. experimenal data:
litv-exp@lxg1298:/data.local1/E121
  16   Tue Feb 25 15:49:58 2020 ruijiu chenDAQchanging scaling factor.
How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
R4L-47 litv-exp > emacs -nw f_user.c
2. change the parameters "MWPC_downscale". 
#define MWPC_downscale 0    // reduction = 2**MWPC_downscale                  
3.compile the program.
4. restart mbs.                                                                                                                                                               
  99   Mon Mar 30 14:48:02 2020 ruijiu and TinoDetectorsThe leakcurrent of SiPad is over the setting limit.
Because the 
leakcurrent of 
6 Sipads is 
over the 
setting limit, 
the alarm of 
HV module is 
sounding.
Ruijiu 
increase the 
limit to 1500 
uA.
Attachment 1: Screenshot_20200330-145551.jpg
Screenshot_20200330-145551.jpg
Attachment 2: Screenshot_20200330-145544.jpg
Screenshot_20200330-145544.jpg
Attachment 3: IMG_20200330_144915.jpg
IMG_20200330_144915.jpg
  100   Mon Mar 30 15:03:58 2020 ruijiu Tino, Yuri, Lasoro, Nik and UliDetectorsthe gas bottle is empty.
The gas bottle was empty. Tino replaced 
the previous old bottle with 50 bar gas left. 

Yuri is getting new gas bottles.

Yuri got a new gas bottle. We repalced 
the the new gas bottle. There is 200 
bar gas left now. 
The old gas bottle with 50 bar gas 
left was kept inside ESR.
The empty gas bottle was removed from 
ESR.  

The outlet volve was decreased by 30 degree.
Since the value is almost 0, we can not read the value of outlet volve.
Attachment 1: IMG_20200330_152735_mh1585575780057.jpg
IMG_20200330_152735_mh1585575780057.jpg
  37   Sat Mar 28 15:07:40 2020 ruijiuDAQstart run
  38   Sat Mar 28 15:19:23 2020 ruijiu start run e121_run_0236.lmd
store 206Pb81+ beam inside ESR and measure its halflife. 
The HV of detector is off.
Start DAQ to record the ESR current in lmd file.
Nik is optimizing the gas jet target. So this file is still test run.
  44   Sun Mar 29 09:40:35 2020 ruijiuDAQrestart go4
go4 crush up. 
the problem is 
due to  mbs. 
restart mbs. 
see an error. 
restart again. 
the mbs and go4 
are working 
working. 
Attachment 1: IMG_20200329_093354.jpg
IMG_20200329_093354.jpg
  45   Sun Mar 29 09:57:26 2020 ruijiuDetectorsthe HV of charged particle detector
        MHV1     MHV2
ch1:1st Sipad  4th 
Sipad
ch2:2nd Sipad  6th 
Sipad
ch3:3rd Sipad  DSSD
ch4:4th Sipad  CsI
Attachment 1: IMG_20200329_095014.jpg
IMG_20200329_095014.jpg
  46   Sun Mar 29 10:09:14 2020 ruijiu start run e121_run_0237.lmd
Sergey and Yuri are tuning Tl beam. The particle number in ers is about 1e4. I(SIS)=5e8
run stop: after few minutes (garbage data)
  51   Sun Mar 29 13:05:36 2020 ruijiuDAQstart ntcap
IQ_2020-03-29_13-05-
56
SC_2020-03-29_13-05-
56
Attachment 1: IMG_20200329_130438.jpg
IMG_20200329_130438.jpg
  53   Sun Mar 29 14:01:45 2020 ruijiu beam position on DSSD
move the detector 1cm 
outside.from 60mm to 
70mm.
left direction is 
outside. right direction 
is 
inside(close to beam).
the spot is moving from 
left to right.
Attachment 1: IMG_20200329_140003.jpg
IMG_20200329_140003.jpg
  54   Sun Mar 29 14:29:13 2020 ruijiu e121_run_00240.lmd
s6 positon at 50mm.
  55   Sun Mar 29 18:41:31 2020 ruijiuAnalysisRatio between MPWC rate and DSSD rate
slit	Ratio	error
-1	18.64	0.4
-2	18.18	0.38
-3	20.85	0.5
-4	18.15	0.34
-5	17.44	0.31
-6	17.38	0.32
-7	17.82	0.32
-8	16.41	0.27
-9	18.51	0.37
Attachment 1: ratio.png
ratio.png
  58   Sun Mar 29 21:02:43 2020 ruijiuAnalysisdecay line of 205Tl beam
decay line of 205Tl beam with Ar gas jet target on and S6 slit at -8mm
Ar gas density~1e12 atoms/cm2
Attachment 1: main_s6_neg8_202003292059.png
main_s6_neg8_202003292059.png
Attachment 2: main_s6_neg8_202003292059.root
  60   Sun Mar 29 21:39:27 2020 ruijiuAnalysisIonization cross section and capture cross section for h-206Pb + Ar
Ionization cross section = 1320 barn.
Capture cross section = 557+137+44.5=735.5.
sigma_Ion/sigma_cap=1.79
Attachment 1: 202003292141.png
202003292141.png
  90   Mon Mar 30 12:12:25 2020 ruijiuGeneralInstruction of NTCAP for shift person
To start a new run with NTCap, we need to retart NTCAP. 
1. Stop labview program. 
2. Start labview program and start a new run.
Attachment 1: Instruction_of_NTCAP_for_shift_person.png
Instruction_of_NTCAP_for_shift_person.png
  95   Mon Mar 30 13:40:57 2020 ruijiuDetectorsHV of Inner detector
Attachment 1: IMG_20200330_133909.jpg
IMG_20200330_133909.jpg
  96   Mon Mar 30 13:41:20 2020 ruijiuDetectorsHV of Inner detector
Attachment 1: IMG_20200330_133909.jpg
IMG_20200330_133909.jpg