HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Bound beta decay experiment on Tl-205, Page 6 of 9  Not logged in ELOG logo
ID Date Author Category Subjectdown
  132   Fri Apr 3 10:06:15 2020 ShahabRunsPlots from Scopes
Just two plots from the scopes for documentation:

magnets.png:

yellow: dipole
green and blue: quadrupoles
red: ESR current


kicker.png:

blue: SIS kicker
yellow: ESR kicker

green: SIS current
red: ESR current

trigger: SIS Kicker
Attachment 1: magnets.png
magnets.png
Attachment 2: kicker.png
kicker.png
  25   Fri Mar 27 20:52:31 2020 RaganGeneralPlans for the measurement with 206Pb81+
We plan to measure:

1. Lifetime of H-like 206Pb81+ beam with two electron cooler currents:
a) 200 mA
b) 10 mA (so that recombination rate is less)
using MWPC (capture detector in outer pocket) and CsISiPHOS (loss detector in inner pocket). 

2. To find the efficiency of the MWPC.
  166   Mon Apr 6 09:34:58 2020 ShahabRunsPictures from one and a half hour measurement
cheers!
Attachment 1: wideband_rec_001.PNG
wideband_rec_001.PNG
  161   Sun Apr 5 23:28:01 2020 Ragan, Alex, EstherRunsOne-hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0549.lmd

_______________________________________________________________________________

time when accumulation starts: 23:04
time when storage starts: 23:42
time when storage ends: 00:42
I_cooler during storage time: -2 mA (20 mA)

I_cooler = 180 mA  


I_SIS: 1.8e9      
ESR particles after stacking: 2.2e6 (offset 3e5)
Number of stackings:  100
Target ON density: 4.24e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 





NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-05_23-42-50-224.png
2020-04-05_23-42-50-224.png
Attachment 2: 2020-04-06_00-56-01-052.png
2020-04-06_00-56-01-052.png
Attachment 3: 0A9DA63C-7DBD-42B3-9CE9-08E9785B33B2.jpeg
0A9DA63C-7DBD-42B3-9CE9-08E9785B33B2.jpeg
Attachment 4: C885A387-78BB-49BF-AD5C-D7FEAB8248DE.jpeg
C885A387-78BB-49BF-AD5C-D7FEAB8248DE.jpeg
Attachment 5: 7487031D-7B12-4ACF-B0C8-55D5B928C0CE.jpeg
7487031D-7B12-4ACF-B0C8-55D5B928C0CE.jpeg
Attachment 6: 3EE56236-447E-4EAE-8394-B1F05BC9D1C7.jpeg
3EE56236-447E-4EAE-8394-B1F05BC9D1C7.jpeg
Attachment 7: D809F5FB-214D-486B-A4F0-912FD2C0CB94.MOV
  123   Thu Apr 2 21:10:57 2020 Ragan, Yuri, Sergey, NikosRunsOne hour measurement (S2:-10/35 mm)
beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hrs
S2:-10/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:05 , first file: run0292.lmd 
file running: 0293.lmd

_______________________________________________________________________________

time when accumulation starts: 19:23
time when storage starts: 19:36
time when storage ends: 20:36
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 2.2e9      
ESR particles after stacking: 2.6e6   (offset 1e5)
Number of stackings: 30
Target ON density: 3.44e12 
Target on time for measurement: 10 mins (by event mode)       


NTCAp file:
SC_2020-04-02_19-10-21
\IQ_2020-04-02_19-10-14
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
  126   Fri Apr 3 01:22:13 2020 Ragan, Pierre-Michel, DimaRunsOne hour measurement (S2: 0/35 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:05 , first file: run0292.lmd 
file running: 0295.lmd

_______________________________________________________________________________

time when accumulation starts: 01:09
time when storage starts: 01:20
time when storage ends: 02:20
I_cooler during storage time: -1 mA

I_cooler =  174 mA


I_SIS: 1.8e9      
ESR particles after stacking: 2.5e6 (offset 1e5)
Number of stackings: 30
Target ON density: 3.48e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-02_19-10-21
\IQ_2020-04-02_19-10-14
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 8E469F1D-992F-4E96-A30A-022B0D1A0E5A.jpeg
8E469F1D-992F-4E96-A30A-022B0D1A0E5A.jpeg
  164   Mon Apr 6 05:43:50 2020 Ragan, Laszlo, NikosRunsOne and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0558.lmd

_______________________________________________________________________________

time when accumulation starts: 05:41
time when storage starts: 06:19
time when storage ends: 07:49
I_cooler during storage time: -1 mA (20 mA)

I_cooler = 179 mA  


I_SIS: 1.75e9      
ESR particles after stacking: 2.3e6 (offset 5e5)
Number of stackings:  100 
Target ON density: 4.36e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 



NTCAp file:
SC_2020-04-06_00-59-46
\IQ_2020-04-06_00-59-38
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-06_06-18-59-809.png
2020-04-06_06-18-59-809.png
Attachment 2: 946073FA-3077-4CBF-900B-565BD19CF040.jpeg
946073FA-3077-4CBF-900B-565BD19CF040.jpeg
Attachment 3: 10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg
10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg
Attachment 4: 2020-04-06_08-03-40-493.png
2020-04-06_08-03-40-493.png
  148   Sat Apr 4 17:32:01 2020 Ragan, Alex, EstherGeneralNo beam in ESR
The beam is coming from SIS but doesn't arrive in ESR because the quadrupole magnets in ESR have failed.

Update (18:01): Problem has been resolved. 
  30   Sat Mar 28 11:07:49 2020 Ragan, RuiJiu, Tino, GeneralNikos is changing gas jet target
The gas jet target is now being changed from H2 to Ar by Nikos.
  139   Fri Apr 3 17:55:13 2020 ShahabRunsNice picture from 205-Tl
In this high contrast Schottky recording, the main three frequency peaks are resolved w.r.t. time from left to right:

203 Hg 80 +, 200 Hg 79+ and 205 Tl 81+

There are also some spurs visible, whose nature is not 100% sure. One possible explanation can be:

Since this is taken during the storage time (gas target still off), we have no separation between parent and daughter ions, the daughter 205 Pb 81+ basically has the same revolution frequency as parent. It is a possibility that after the decay, daughter ions are slowly cooled back to the nominal frequency. Daughter ions are highly charged and have a high velocity, so single ion sensitivity is expected. They come from all directions, but Schottky measures only the longitudinal plane. Symmetric spurs can hence be an indication of this.
Attachment 1: Tl-daughter_spurs.PNG
Tl-daughter_spurs.PNG
  21   Fri Mar 27 13:40:54 2020 RaganGeneralNTCap start and shutdown information
The attachment contains information on how to start and shutdown NTCap and bridge computer.
Attachment 1: ntcapmanual.pdf
ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf
  183   Sun May 30 12:09:00 2021 RaganGeneralNTCAP
Attached is the info given by Carsten.
The instructions to operate NTCAP are given on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
Attachment 1: ntcap_carsten.pdf
ntcap_carsten.pdf ntcap_carsten.pdf
  29   Sat Mar 28 11:00:14 2020 Ragan, RuiJiu, Mei, Yuri, TinoDetectorsMovement of detector
10:51 am the CsISiPHOS is moved to 65 mm from 60 mm.The spot on the DSSSD is changed by 5 mm which confirms the hit of the beam.

11:05 
Detector is moved back to 60 mm.
Attachment 1: IMG_20200328_110253.jpg
IMG_20200328_110253.jpg
Attachment 2: IMG_20200328_110258.jpg
IMG_20200328_110258.jpg
  170   Thu Apr 9 11:16:35 2020 RaganGeneralMeasurements done in the experiment
Attachment 1: storage11.pdf
storage11.pdf
Attachment 2: storage12.pdf
storage12.pdf
Attachment 3: storage13.pdf
storage13.pdf
  118   Thu Apr 2 07:01:32 2020 Ragan, Esther, OliverRunsMeasurement with 4 hrs storage time
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 01:48 , first file: run0287.lmd
file running:    0287.lmd

_______________________________________________________________________________

time when accumulation starts: 04:45
time when storage starts: 04:55
time when storage ends: 06:55
I_cooler during storage time: 10 mA

I_cooler =  mA


I_SIS: 1.8e9      
ESR particles after stacking: ~e5  
Number of stackings: 20
Target ON density:   4e12
Target on time: 06:56:30
Target off time: 07:06:30
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01_16-36-43/0000xxx.iq.tdms
\IQ_2020-04-01_16-36-43/0000xxx.iq.tdms
IQ rate: 8 MS/s
(saved in drive : o)

copy and repeat the above (below the line) for every storage time measurement
  115   Thu Apr 2 02:46:57 2020 Ragan, Yuri, Sergey, Esther, OliverRunsMeasurement with 2 hrs storage time


beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 2 hrs
(In the picture below, it can be seen that the beam cooled. On right most is the Tl beam and rest are the contaminants.)

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 01:48 , first file: run0287.lmd
file running:    0287.lmd

______________________________________________________
_________________________

time when accumulation starts: 02:08
time when storage starts: 02:21
time when storage ends: 04:21
I_cooler during storage time: 10 mA

I_cooler =  mA


         
ESR particles after stacking:     
Number of stackings: 20
Target ON density:   3.9e12
Target on time: 04:22:40
Target off time: 04:32:40
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01_16-36-43/0000xxx.iq.tdms
\IQ_2020-04-01_16-36-43/0000xxx.iq.tdms
IQ rate: 8 MS/s
(saved in drive : o)

copy and repeat the above (below the line) for every storage time 
measurement
Attachment 1: E682FBC9-1374-4582-8202-C8AA5DC8E6D5.jpeg
E682FBC9-1374-4582-8202-C8AA5DC8E6D5.jpeg
  42   Sat Mar 28 16:29:27 2020 Ragan, RuiJiu, EstherGeneralMalfunction of several ESR machines
The HKR crew informs us that several machines in ESR are showing malfunctions.
The on-call expert cannot be reached.

Update (16:36): On-call service has been informed.

Update (16:48): ESR cycle stopped.
  28   Sat Mar 28 04:50:34 2020 RaganDetectorsMWPC
Alex and Pierre-Michel applied 1500 V to the anode and adjusted the threshold in Messhute.
x1 signal was small & noisy and rest of the signals were fine.
Attachment 1: 4475A53F-48AB-430E-8A22-7D92E5FEACBF.jpeg
4475A53F-48AB-430E-8A22-7D92E5FEACBF.jpeg
  61   Sun Mar 29 21:55:47 2020 RaganGeneralMWPC
Alex goes to Messhute to check the signals from MPWC. After he completes, we start with the measurements with the primary beam )
Attachment 1: Comparison.png
Comparison.png
  9   Tue May 28 08:36:14 2019 JanDAQMBS start & RFIO server
You need a DAQ-PC and the RIO crate computer.
All of the DAQ proceedures laid out here are operated from inside the DAQ screen session.
Right now for e121 the following DAQ-setup is used: (might change in the future)

DAQ-PC: lxg0155
screen session: e121_daq @ lxg0155
RIO: r4l-47
DAQ dir: /esr/usr/litv-exp/2019Munich-Det



The most important commands:

on DAQ-PC
mbs - start mbs DAQ
rawDispRFIO64 - start RFIO server

in MBS shell
@startup - initialize MBS (only inside DAQ dir)
@connect - connect RFIO server (only if server running)
@runstart - open file for data writing
@runstop - close file
start acq - start DAQ
show acq - status of DAQ
show file - status of current file/RFIO server




The full proceedure for the DAQ:
  • on DAQ-PC enter screen session:
    litv-exp@lxg____:~$ screen -x e121_daq
    or create new screen session if non is exisiting:
    litv-exp@lxg____:~$ screen -S e121_daq
  • inside screen: go to 1st tab (MBS) and login to RIO if not yet done:
    <Ctrl-a 0>
    litv-exp@lxg____:~$ ssh r4l-47
    
  • on RIO reset and start MBS
    R4L-47 litv-exp > cd 2019Munich-Det
    R4L-47 litv-exp > resl
    R4L-47 litv-exp > mbs
    mbs > @startup
    
  • inside screen go to 2nd tab (RFIO)
    <Ctrl-a 1>
    or create 2nd tab if not exisiting
    <Ctrl-a c>
  • start RFIO server on DAQ-PC
    litv-exp@lxg____:~$ cd /u/litv-exp/rfio
    litv-exp@lxg____:~$ ./rawDispRFIO64-wheezy
    -I- 64 bit RFIO test server (lxg0155) listening on port 1974
        forks './rawServRFIO64-wheezy' for each client request
  • inside screen go to 1st tab and connect MBS to RFIO server
    <Ctrl-a 0>
    mbs > @connect
    mbs> show file
    mbs> -R4L-47  :transport  :Name of output device = RFIO
    -R4L-47  :transport  :current tape label    = lxg0155 , opened
    -R4L-47  :transport  :current file name     =  , closed
    -R4L-47  :transport  :       0.000 MBytes written to tape
    -R4L-47  :transport  :       0.000 MBytes written to current file
  • start acquisition
    mbs > start acq
    mbs > show acq
    ...
    -R4L-47  :util       :Name of output device = RFIO
    -R4L-47  :util       :RFIO server  lxg0155, file CLOSED
    -R4L-47  :util       :       0.000 [MB] written to tape,        0.000 to file
    -R4L-47  :util       :--------------------------------------------------------------
    -R4L-47  :util       :Collected:    61.1451 MB,    1866 Buffers,     131990 Events.
    -R4L-47  :util       :Rate     :         33 KB/s,     1 Buffers/s,       71 Events/s
    -R4L-47  :util       :--------------------------------------------------------------
  • open file / start a run
    mbs > @runstart
    -R4L-47  :transport  :open   file at server lxg0155::
    -R4L-47  :transport  :/data.local1/E121/predata/e121_run_1239.lmd
  • close file / stop a run
    mbs > @runstop
    -R4L-47  :transport  :Rfio server lxg0155: closed file after      0.262 MB written:
    -R4L-47  :transport  :-I- remote output file /data.local1/E121/predata/e121_run_1239.lmd closed
    mbs> -R4L-47  :transport  :/data.local1/E121/predata/e121_run_1239.lmd
ELOG V3.1.5-fc6679b