HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 7 of 9  Not logged in ELOG logo
Entry  Mon Mar 30 03:30:03 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 04:00:19 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Mon Mar 30 04:30:17 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
Entry  Wed Jan 29 10:42:42 2020, Shahab, General, Gas target control with the new control system event IMG_20200128_153508.jpgIMG_20200128_145345.jpgIMG_20200128_145340.jpgIMG_20200128_145307.jpgIMG_20200128_144555.jpg
Entry  Sun Mar 29 18:55:19 2020, Shahab, Runs, Frequency list for identification freqs.jpg
Entry  Tue Mar 31 23:31:41 2020, Shahab, Runs, alpha_p calibration ap_calibration.jpg
Entry  Fri Apr 3 10:06:15 2020, Shahab, Runs, Plots from Scopes magnets.pngkicker.png
Entry  Fri Apr 3 11:52:27 2020, Shahab, Runs, Stacking 54 times! 2020-04-03_11-48-11-781.png
Entry  Fri Apr 3 14:08:41 2020, Shahab, Runs, Stacking 2020-04-03_14-07-13-250.png
Entry  Fri Apr 3 17:55:13 2020, Shahab, Runs, Nice picture from 205-Tl Tl-daughter_spurs.PNG
Entry  Sat Apr 4 13:41:04 2020, Shahab, Runs, cooler down 
Entry  Sun Apr 5 10:21:54 2020, Shahab, Runs, 10 hour measurement pictures 2020-04-05-10h-aftergasjet2.PNG2020-04-05-10h-aftergasjet.PNG205Tl_gasjet_view3.PNG
Entry  Sun Apr 5 12:48:58 2020, Shahab, Runs, 2hour measurement parent pictures 6x
Entry  Mon Apr 6 09:34:58 2020, Shahab, Runs, Pictures from one and a half hour measurement wideband_rec_001.PNG
Entry  Mon Apr 6 14:57:04 2020, Shahab, Runs, cooler down 
Entry  Mon Mar 30 07:34:06 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 08:00:40 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 08:32:05 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
Entry  Mon Mar 30 08:56:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  
Entry  Mon Mar 30 09:26:37 2020, Tino, Runs, Stopped Second measurement with 206Pb81+ beam at I_cooler = 10 mA  
ELOG V3.1.5-fc6679b