HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 129     Entry time: Sat Mar 21 13:44:16 2020
Author: Pierre-Michel 
Category: Detectors 
Subject: Recoil detector 
Year:  
We turn on Recoil detector, to use it as a monitor for target overlap.

MCP front -2500 V for highest signal rate. 
(Used to be -2250 V during previous beam time.)

DAQ triggered with 1 kHz clock in 2nd trigger input.
(2nd trigger used to be x-rays in previous beam time.)

The picture shows the increase of the Recoil rate when increasing the voltage from 2250 V to 2500 V in steps of 50 V. The last shot was taken without beam, so just target on.
Attachment 1: Recoil.pdf  20 kB  | Show | Show all
ELOG V3.1.5-fc6679b