HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 23 of 29  Not logged in ELOG logo
ID Date Author Category Subject Year Text Attachments
  134   Sat Mar 21 15:30:34 2020 SergiyGeneralgo into the ESR We are going into the ESR to check the electronics.
Use calibration sources (133Ba etc).
  
  133   Sat Mar 21 15:26:49 2020 LaszloGeneralSCRAPER is ON use again Yuri puts back the scraper (Egelhof 1 - GE01DD1IG)
into position = +19. (where it was in the
evening)
  
  132   Sat Mar 21 15:23:57 2020 SergiyRunsrun entry - run063 open file : run063

beam: 118Te52+
  
  130   Sat Mar 21 14:52:05 2020 LaszloGeneraltarget optimization previous position of the beam at target was
-3mm (for the night position)
max. intensity position of the beam at target
 IMG_20200321_145105.jpgIMG_20200321_145059.jpg 
  129   Sat Mar 21 13:44:16 2020 Pierre-MichelDetectorsRecoil detector We turn on Recoil detector, to use it as a
monitor for target overlap.
 Recoil.pdf 
  128   Sat Mar 21 13:37:53 2020 Laszlo MCP can monitor target now with the MCP we can see clearly the effect
of the target :) (scintillation?)
so we want to scan through the target thickness
  
  127   Sat Mar 21 13:24:10 2020 LaszloRunsrun entry - run063 open file : run063

beam: 118Te52+
  
  126   Sat Mar 21 12:42:21 2020 RaganGeneralEntry to ESR for MCP detector Pierre Michel and Laszlo go inside the ESR
for switching on the MCP detector so that
the photons from the gas jet and secondary
  
  125   Sat Mar 21 12:32:00 2020 LaszloGeneralEstimated target thickness Target thickness must be like 5mm (was measured
with a moving thin wire)
The beam thickness is small because of the
  
  124   Sat Mar 21 12:30:30 2020 RaganRunsrun entry - run061 
beam: 118Te52+
energy: 10 MeV/u
  
  123   Sat Mar 21 12:06:50 2020 LaszloGeneralrun61 - SCRAPER moved out we want to see any change on the Silicon count
rate, because we will have now also Rutherford
scattering. 
  
  122   Sat Mar 21 12:02:57 2020 Ragan, LaszloGeneralrun entry - run061 12:02 pm - scapper is taken out completely

open file : runstart061
  
  121   Sat Mar 21 12:00:27 2020 Ragan, AlexRunsrun entry - run060 
beam: 118Te52+
energy: 10 MeV/u
  
  120   Sat Mar 21 11:32:46 2020 Ragan, AlexRunsrun entry - run060 Open file: runstart060

beam: 118Te52+
  
  119   Sat Mar 21 11:30:04 2020 LaszloGeneralMWPC movement now we try to move the capture detector (MWPC
in the 1. dipol before our Si setup) inside
the ring while the DAQ was ON
 MWPC_movement.png 
  118   Sat Mar 21 11:25:47 2020 Laszlo possible misalignement between target and fragment beam after 9hours of measurement we see only 19
counts on our targetON silicon detector histo.
this low count rate can indicate two scenarios:
 Te_measurement_after_first_night.png 
  117   Sat Mar 21 11:04:47 2020 Ragan, Alex, LaszloRunsrun entry - run059 beam: 118Te52+
energy: 10 MeV/u
  
  116   Sat Mar 21 10:28:23 2020 Ragan, AlexRunsrun entry - run059 Open file: runstart059

beam: 118Te52+
  
  115   Sat Mar 21 10:20:27 2020 Ragan, AlexGeneralTarget LN2 The LN2 Dewar on the ESR roof has been refilled.   
  114   Sat Mar 21 10:00:19 2020 Ragan, AlexRunsrun entry - run058 beam: 118Te52+
energy: 10 MeV/u
  
ELOG V3.1.5-fc6679b