ID Date Author Category Subject Year
  499   Thu May 27 14:38:14 2021 Yuri, JanRunsRun 01552021

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0155.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 14:38:00 27.05.2021
run stop: 15:11:15 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  498   Thu May 27 14:33:05 2021 Jan, Beatriz, AlexRunsRun 0154 - crap run2021
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0154.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 14:32:05 27.05.2021
run stop: 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  497   Thu May 27 13:48:18 2021 Helmut WeickAcceleratorFRS wrong status display for one day2021
By checking the log files we realized that from yesterday 26.05. 13:44 - today 13:05 the FRS degrader was shown as out.
TS3ET7US should be at -420.0mm not at -580mm (=out). This 3.26mm Sci is used as a degrader and is essential.

After recognizing we set the drive controller back to remote and moved the degrader to -420mm (at 13:02)
The wrong values start on 26.05. at 13:44 and show variation until 16:11 until over night it was always shown as out.

It was tested today (~14h) that if you really move it out no beam is injected into ESR, but beam and even Te was observed in ESR last night.

The drive controller was in manual mode and it may not have given correct updates.
But it was also tested today that drives on the same crate get updates even in manual mode (at ~16h with TS1DG5_S and TS3ED7DS).

We also checked graylog. No drive command was issued yesterday in this time period, whereas the drive commands for testing today can be clearly seen.
Yesterday other drives in S4 area on the same controller were tested. This is most likely the reason for the manual mode.
Attachment 1: drivestat-log.JPG
drivestat-log.JPG
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021
Maybe, our degrader in FRS was removed by hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
All runs taken in this period have to be double checked!

However, the xray lines from this night show Te for k_alpha and K-KREC

It is also possible that the readout of this degrader motor was just wrong due to its state as hand-controlled.
  495   Thu May 27 13:24:29 2021 Yuri, JanRunsRun 01532021
All runs before (since 13:40 26/05/21) were taken without the degrader in FRS!


No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0153.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 13:23:57 27.05.2021
run stop: 13:31:44 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  494   Thu May 27 12:41:25 2021 Yuri, JanRunsRun 01522021
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0152.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 12:39:21 27.05.2021
run stop: 13:23:57 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  493   Thu May 27 11:36:23 2021 Yuri, Beatriz, JanRunsRun 01512021
Power supplies for correction coils were in failure.
No effect seen in schottky after reset and repower, however.


No. of stacks: 10 (switched to 20 shortly)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0151.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 11:36:01 27.05.2021
run stop: 12:39:18 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  492   Thu May 27 10:21:41 2021 Yuri, BeatrizRunsRun 01502021
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0150.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 10:21:17 27.05.2021
run stop: 11:35:36 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 80 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  491   Thu May 27 09:39:15 2021 Yuri, BeatrizRunsRun 01492021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0149.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 09:38:49 27.05.2021
run stop: 10:09:21 27.05.2021 (stopped for filling det.)
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 100 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
  490   Thu May 27 08:26:15 2021 Yuri, BeatrizGeneralOptimisation beam position on target and scraper position2021
Optimised overlap with the target by shifting the beam from -11.5 to 12.8 mm. This lead to an increase of the DSSSD rate of a factor between 2.5 or 3.
Adjusted scraper position  by looking at x-ray rate and move it from +1 to +2. 
  489   Thu May 27 08:23:05 2021 Yuri, BeatrizRunsRun 01482021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm

open file : e127b_run0148.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 08:22:28 27.05.2021
run stop: 09:38:31 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 100 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 4.6e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Beam was off for a few minutes, after coming back the number of particles was reduced for a few minutes and then increased to the values at the beginning of the run.
  488   Thu May 27 05:48:12 2021 Pierre-Michel, EnisRunsRun 01472021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm

open file : e127b_run0147.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 05:47:44 27.05.2021
run stop: 06:54:01 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.75e9 (one shoot)
ESR current at injection: 4.5e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  487   Thu May 27 04:48:19 2021 Pierre-Michel, EnisRunsRun 01462021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm


open file : e127b_run0146.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 04:47:41 27.05.2021
run stop: 05:47:41 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.75e9 (one shoot)
ESR current at injection: 4.5e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  486   Thu May 27 03:47:18 2021 Pierre-Michel, EnisRunsRun 01452021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm


open file : e127b_run0145.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 03:46:53 27.05.2021
run stop: 04:47:38 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 3e9 (one shoot)
ESR current at injection: 5e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  485   Thu May 27 02:47:00 2021 Pierre-Michel, EnisRunsRun 01442021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm


open file : e127b_run0144.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 02:46:26 27.05.2021
run stop: 03:46:50 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 4.8e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  484   Thu May 27 01:46:48 2021 Pierre-Michel, EnisRunsRun 01432021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm


open file : e127b_run0143.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 01:46:21 27.05.2021
run stop: 02:46:22 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 3e9 (one shoot)
ESR current at injection: 4.0e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  483   Thu May 27 00:46:33 2021 Pierre-Michel, EnisRunsRun 01422021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm

open file : e127b_run0142.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 00:46:03 27.05.2021
run stop: 01:46:19 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 5.0e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  482   Wed May 26 23:46:49 2021 Pierre-Michel, EnisRunsRun 01412021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm

open file : e127b_run0141.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 23:46:05 26.05.2021
run stop: 00:46:01 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 2 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 5.0e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  481   Wed May 26 22:42:56 2021 Ragan, ThanassisRunsRun 01402021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm


open file : e127b_run0140.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 22:42:39 26.05.2021
run stop: 23:45:58 26.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ Hz
Xray_ON_bdt: Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 7.0e8 (one shoot)
ESR current at injection: 3.0e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14
  480   Wed May 26 21:42:46 2021 Ragan, ThanassisRunsRun 01392021
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm


open file : e127b_run0139.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm

run start: 21:42:25 26.05.2021
run stop: 22:42:33 26.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5-6 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 7.0e8 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14