ID |
Date |
Author |
Category |
Subject |
Year |
487
|
Thu May 27 04:48:19 2021 |
Pierre-Michel, Enis | Runs | Run 0146 | 2021 |
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm
open file : e127b_run0146.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm
run start: 04:47:41 27.05.2021
run stop: 05:47:41 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.75e9 (one shoot)
ESR current at injection: 4.5e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14 |
488
|
Thu May 27 05:48:12 2021 |
Pierre-Michel, Enis | Runs | Run 0147 | 2021 |
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm
open file : e127b_run0147.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +1.0 mm
run start: 05:47:44 27.05.2021
run stop: 06:54:01 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.75e9 (one shoot)
ESR current at injection: 4.5e6 (stacked)
ESR particles after decel.: 2.3e5 (more or less)
Target ON density: 1.0e14 |
489
|
Thu May 27 08:23:05 2021 |
Yuri, Beatriz | Runs | Run 0148 | 2021 |
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -11.5 mm
open file : e127b_run0148.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 08:22:28 27.05.2021
run stop: 09:38:31 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 100 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 4.6e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Beam was off for a few minutes, after coming back the number of particles was reduced for a few minutes and then increased to the values at the beginning of the run. |
490
|
Thu May 27 08:26:15 2021 |
Yuri, Beatriz | General | Optimisation beam position on target and scraper position | 2021 |
Optimised overlap with the target by shifting the beam from -11.5 to 12.8 mm. This lead to an increase of the DSSSD rate of a factor between 2.5 or 3.
Adjusted scraper position by looking at x-ray rate and move it from +1 to +2. |
491
|
Thu May 27 09:39:15 2021 |
Yuri, Beatriz | Runs | Run 0149 | 2021 |
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0149.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 09:38:49 27.05.2021
run stop: 10:09:21 27.05.2021 (stopped for filling det.)
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 100 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
492
|
Thu May 27 10:21:41 2021 |
Yuri, Beatriz | Runs | Run 0150 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0150.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 10:21:17 27.05.2021
run stop: 11:35:36 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: 80 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
493
|
Thu May 27 11:36:23 2021 |
Yuri, Beatriz, Jan | Runs | Run 0151 | 2021 |
Power supplies for correction coils were in failure.
No effect seen in schottky after reset and repower, however.
No. of stacks: 10 (switched to 20 shortly)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0151.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 11:36:01 27.05.2021
run stop: 12:39:18 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
494
|
Thu May 27 12:41:25 2021 |
Yuri, Jan | Runs | Run 0152 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0152.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 12:39:21 27.05.2021
run stop: 13:23:57 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
495
|
Thu May 27 13:24:29 2021 |
Yuri, Jan | Runs | Run 0153 | 2021 |
All runs before (since 13:40 26/05/21) were taken without the degrader in FRS!
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0153.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 13:23:57 27.05.2021
run stop: 13:31:44 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
496
|
Thu May 27 13:26:35 2021 |
Jan | Accelerator | FRS degrader failure | 2021 |
Maybe, our degrader in FRS was removed by hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
All runs taken in this period have to be double checked!
However, the xray lines from this night show Te for k_alpha and K-KREC
It is also possible that the readout of this degrader motor was just wrong due to its state as hand-controlled. |
497
|
Thu May 27 13:48:18 2021 |
Helmut Weick | Accelerator | FRS wrong status display for one day | 2021 |
By checking the log files we realized that from yesterday 26.05. 13:44 - today 13:05 the FRS degrader was shown as out.
TS3ET7US should be at -420.0mm not at -580mm (=out). This 3.26mm Sci is used as a degrader and is essential.
After recognizing we set the drive controller back to remote and moved the degrader to -420mm (at 13:02)
The wrong values start on 26.05. at 13:44 and show variation until 16:11 until over night it was always shown as out.
It was tested today (~14h) that if you really move it out no beam is injected into ESR, but beam and even Te was observed in ESR last night.
The drive controller was in manual mode and it may not have given correct updates.
But it was also tested today that drives on the same crate get updates even in manual mode (at ~16h with TS1DG5_S and TS3ED7DS).
We also checked graylog. No drive command was issued yesterday in this time period, whereas the drive commands for testing today can be clearly seen.
Yesterday other drives in S4 area on the same controller were tested. This is most likely the reason for the manual mode. |
Attachment 1: drivestat-log.JPG
|
|
498
|
Thu May 27 14:33:05 2021 |
Jan, Beatriz, Alex | Runs | Run 0154 - crap run | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0154.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 14:32:05 27.05.2021
run stop: 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
499
|
Thu May 27 14:38:14 2021 |
Yuri, Jan | Runs | Run 0155 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0155.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 14:38:00 27.05.2021
run stop: 15:11:15 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
500
|
Thu May 27 15:18:17 2021 |
Michele, Cobus | Runs | Run 0156 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0156.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 15:32:43 27.05.2021
run stop: 16:34:41 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 370 nA
SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
501
|
Thu May 27 16:35:48 2021 |
Michele, Cobus | Runs | Run 0157 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0157.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 16:34:47 27.05.2021
run stop: 17:12:25 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~2 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 370 nA
SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Comments:
H gas bottle changed ca. 16:55
Stopped early. No beam from 17:10. |
502
|
Thu May 27 17:14:58 2021 |
Michele, Cobus | Runs | Run 0158 - no beam | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0158.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 17:13: 27.05.2021
run stop: 17:14:40 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 370 nA
SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Comments:
No beam. |
503
|
Thu May 27 17:48:14 2021 |
Michele, Cobus | Runs | Run 0159 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0159.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 17:47:47 27.05.2021
run stop: 18:36:47 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 110 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 370 nA
SIS particles before: 2.2e9 (one shoot)
ESR current at injection: 1.5e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Comments:
No Beam from 18:34:30
ESR monitor was red at the time. Not sure when it started,
but magnets kp02-kp09 and kp20-kp22 were off at the time.
Operator switched them on subsequently. |
504
|
Thu May 27 18:38:19 2021 |
Michele, Cobus | Runs | Run 0160 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0160.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 18: 27.05.2021
run stop: 19: 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 110 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 370 nA
SIS particles before: 2.2e9 (one shoot)
ESR current at injection: 1.5e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Comment: No Beam from 18:34:00 |
505
|
Thu May 27 18:51:32 2021 |
Michele, Cobus | Runs | Run 0160 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0160.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 18:50:44 27.05.2021
run stop: 19:49:37 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 370 nA
SIS particles before: 2.9e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |
506
|
Thu May 27 19:50:20 2021 |
Michele, Cobus | Runs | Run 0161 | 2021 |
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm
open file : e127b_run0161.lmd
beam: 118Te52+
energy: 6 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm
run start: 19:49:43 27.05.2021
run stop: 20:49:23 20 27.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.3e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14 |