HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 13 of 29  Not logged in ELOG logo
Entry  Thu May 27 16:35:48 2021, Michele, Cobus, Runs, Run 0157, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0157.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 16:34:47 27.05.2021
run stop: 17:12:25 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~2 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 370 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comments:

H gas bottle changed ca. 16:55
Stopped early. No beam from 17:10.
Entry  Thu May 27 17:14:58 2021, Michele, Cobus, Runs, Run 0158 - no beam, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0158.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 17:13: 27.05.2021
run stop: 17:14:40 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 370 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comments:

No beam.
Entry  Thu May 27 17:48:14 2021, Michele, Cobus, Runs, Run 0159 , 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0159.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 17:47:47 27.05.2021
run stop: 18:36:47 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 110 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 370 nA


SIS particles before: 2.2e9 (one shoot)
ESR current at injection: 1.5e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comments:

No Beam from 18:34:30
ESR monitor was red at the time. Not sure when it started,
but magnets kp02-kp09 and kp20-kp22 were off at the time.
Operator switched them on subsequently.
Entry  Thu May 27 18:38:19 2021, Michele, Cobus, Runs, Run 0160 , 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0160.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 18: 27.05.2021
run stop: 19: 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 110 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 370 nA


SIS particles before: 2.2e9 (one shoot)
ESR current at injection: 1.5e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comment: No Beam from 18:34:00
Entry  Thu May 27 18:51:32 2021, Michele, Cobus, Runs, Run 0160 , 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0160.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 18:50:44 27.05.2021
run stop: 19:49:37 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 370 nA


SIS particles before: 2.9e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Thu May 27 19:50:20 2021, Michele, Cobus, Runs, Run 0161, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0161.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 19:49:43 27.05.2021
run stop: 20:49:23 20 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.3e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Thu May 27 20:50:06 2021, Michele, Cobus, Runs, Run 0162, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0162.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 20:49:30 27.05.2021
run stop: 21:11:17 20 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 1.9e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comment:

Stopped early for LN2 filling.
Entry  Thu May 27 21:14:16 2021, Michele, Cobus, Runs, Run 0163, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0163.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 21:36:44 27.05.2021
run stop: 21:56:54 20 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~5 Hz
Xray_ON_bdt: 100 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.7e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comment: Started losing beam at around 21:48.
Entry  Thu May 27 22:00:28 2021, Michele, Cobus, Runs, Run 0164, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0164.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 21:58:38 27.05.2021
run stop: 22:43:21 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.6e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14

Comment: Beam lost in SIS at 22:39.
Entry  Thu May 27 22:45:13 2021, Michele, Cobus, Runs, Run 0165, 2021 

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0165.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 22:43:37 27.05.2021
run stop: 23:43:26 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Thu May 27 23:44:56 2021, Mario, Sophia, Runs, Run 0166, 2021 
Note: beam was gone for 8 min (23:47 - 23:55) and from 00:01 on.
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0166.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 23:43:36 27.05.2021
run stop: 00:10:55 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 00:16:15 2021, Mario, Sophia, Runs, Run 0167, 2021 
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0167.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 01:43:59 28.05.2021
run stop: 02:50:17 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 02:51:02 2021, Mario, Sophia, Runs, Run 0168, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0168.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 02:50:30 28.05.2021
run stop: 03:12:20 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 03:15:01 2021, Mario, Sophia, Runs, Run 0169, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0169.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 03:41:27 28.05.2021
run stop: 04:43:38 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 04:45:06 2021, Mario, Sophia, Runs, Run 0170, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0170.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 04:43:54 28.05.2021
run stop: 05:44:18 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 05:46:15 2021, Mario, Sophia, Runs, Run 0171, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0171.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 05:44:28 28.05.2021
run stop: 06:47:06 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 06:48:31 2021, Rene, Tino, Runs, Run 0172, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0172.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 06:47:10 28.05.2021
run stop: 07:48:28 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 07:51:07 2021, Rene, Tino, Runs, Run 0173, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0173.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 07:48:32 28.05.2021
run stop: 08:48:49 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 130 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.9e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 08:50:03 2021, Rene, Tino, Runs, Run 0174, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0174.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 08:48:51 28.05.2021
run stop: 09:48:07 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 130 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.9e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
Entry  Fri May 28 10:06:11 2021, Rene, Tino, Runs, Run 0175, 2021 
only beam in the first minutes

No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0175.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 10:48:51 28.05.2021
run stop: 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~3 Hz
Xray_ON_bdt: 130 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.9e9 (one shoot)
ESR current at injection: 1.8e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
ELOG V3.1.5-fc6679b