HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 13 of 29  Not logged in ELOG logo
ID Date Authordown Category Subject Year Text Attachments
  513   Fri May 28 02:51:02 2021 Mario, SophiaRunsRun 01682021only beam in the first minutes

No. of stacks: 10 
  
  514   Fri May 28 03:15:01 2021 Mario, SophiaRunsRun 01692021only beam in the first minutes

No. of stacks: 10 
  
  515   Fri May 28 04:45:06 2021 Mario, SophiaRunsRun 01702021only beam in the first minutes

No. of stacks: 10 
  
  516   Fri May 28 05:46:15 2021 Mario, SophiaRunsRun 01712021only beam in the first minutes

No. of stacks: 10 
  
  230   Mon Mar 23 08:51:01 2020 Laszlo,YuryRunsrun entry - run095 open file : run095

beam: 124Xe54+
  
  231   Mon Mar 23 09:22:12 2020 Laszlo,YuryRunsrun entry - run096 open file : run096

beam: 124Xe54+
  
  235   Mon Mar 23 10:08:12 2020 Laszlo,YuryRunsrun entry - run098 open file : run098

beam: 124Xe54+
  
  236   Mon Mar 23 10:26:36 2020 Laszlo,YuryRunsrun entry - run099 open file : run099

beam: 124Xe54+
 2020-03-23_10-39-59-234.pnginjection_current_spike.png 
  237   Mon Mar 23 11:00:29 2020 Laszlo,SergeyRunsrun entry - run100 - SCRAPER removed! open file : run100

beam: 124Xe54+
  
  238   Mon Mar 23 11:17:42 2020 Laszlo,SergeyRunsrun entry - run101 open file : run101

beam: 124Xe54+
 2020-03-23_11-19-53-652.pnginjection_current_spike_withoutScraper.png 
  240   Mon Mar 23 11:35:52 2020 Laszlo,SergeyRunsrun entry - run102 open file : run102

beam: 124Xe54+
  
  94   Sat Mar 21 02:00:08 2020 Laszlo, Tino, OliverRunsrun entry - run051 Beam is back at 01:59 am.
Open file: runstart051
  
  95   Sat Mar 21 02:15:19 2020 Laszlo, Tino, OliverRunsrun entry - run051 Open file: runstart051

beam: 118Te52+
  
  96   Sat Mar 21 02:31:48 2020 Laszlo, Tino, OliverRunsrun entry - run051 Open file: runstart051

beam: 118Te52+
  
  395   Sat May 22 20:46:19 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021The scraper was moved into 2.5mm in absolute
which corresponds to 20mm away from the beam
axis.
  
  400   Sat May 22 22:29:48 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021The scraper was moved into 7.5 mm in absolute
which corresponds to 25 mm away from the
beam axis.
  
  47   Sun Mar 15 17:12:40 2020 Laszlo, JanDetectorsnew Ortec spec amps  We are now using new SpecAmps for the x-ray
detectors from ORTEC, they deliver much improved
resolution but have other strange effects
  
  48   Sun Mar 15 17:13:21 2020 Laszlo, JanCalibrationthe x-ray gate issue We found a strange behaviour of our ADC gates
for the x-ray detectors.
The setting as shown in the foto below corresponds
 IMG_20200315_172129.jpg 
  62   Wed Mar 18 09:53:28 2020 Laszlo, JanGeneralvacuum after opening gate valve Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
 vacuum_ESR1.jpgvacuum_setup1.jpg 
  149   Sat Mar 21 22:57:28 2020 Laszlo, JanDAQchanging cables of the Xray 90 and 145 Energy signals of 90 and 145 degree detector
have been checked and exchanged
They were connected to the wrong ADC channel.
  
ELOG V3.1.5-fc6679b