HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 14 of 29  Not logged in ELOG logo
Entry  Sat May 29 18:29:26 2021, Sophia, Mario, Runs, Run 0198, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sat May 29 19:34:41 2021, Sophia, Mario, Runs, Run 0199, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sat May 29 20:35:22 2021, Sophia, Mario, Runs, Run 0200, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sat May 29 21:37:54 2021, Sophia, Mario, Runs, Run 0201, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sat May 29 22:03:28 2021, Sophia, Mario, Runs, Run 0202, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sat May 29 23:05:52 2021, Oliver, Diego, General, No Beam, 2021 
Due to a radioprotection issue in CaveA there is no beam. We wait for the radioprotection shift to arrive...

Beam back at 23:18
Entry  Sat May 29 23:18:43 2021, Oliver, Diego, Runs, Run 0203, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 00:14:58 2021, Oliver, Diego, General, SIS Pattern changed, 2021 
The pattern in SIS was changed so that we get more injections into ESR. Before HTD had 9 seconds which resulted in a timeout in the ESR. Now HTD has 10
seconds which improved a lot...
Entry  Sun May 30 00:19:33 2021, Oliver, Diego, Runs, Run 0204, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 01:22:03 2021, Oliver, Diego, Runs, Run 0205, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 02:26:07 2021, Oliver, Diego, Runs, Run 0206, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 03:30:37 2021, Oliver, Diego, Runs, Run 0207, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 04:27:58 2021, Oliver, Diego, Runs, Run 0208, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 05:32:42 2021, Oliver, Diego, Runs, Run 0209, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 06:32:43 2021, Oliver, Diego, Jan, Runs, Run 0210, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 07:26:14 2021, Oliver, Diego, Jan, Runs, Run 0211, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 10:24:20 2021, Jan Glorius, Calibration, run0212 - X-calib. 90-pb 145-am, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 11:32:06 2021, Jan Glorius, Calibration, run0213 - X-calib. 90-am 145-pb 35-ba, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 13:23:26 2021, Jan Glorius, Calibration, run0214 - X-calib. 90-ba 145-ba 35-am, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 14:38:09 2021, Jan Glorius, Calibration, run0216 - X-calib. 90-ba 35-pb, 2021 
Efficiency calibration in ESR after experiment

************************************
ELOG V3.1.5-fc6679b