HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 18 of 29  Not logged in ELOG logo
Entry  Sun Mar 15 15:08:44 2020, Jan, Calibration, run035 - Xray145 calib B133 high rate,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 145
Entry  Sun Mar 15 17:12:40 2020, Laszlo, Jan, Detectors, new Ortec spec amps ,  
We are now using new SpecAmps for the x-ray detectors from ORTEC, they deliver much improved resolution but have other strange effects as discribed in the
next entry.
Entry  Sun Mar 15 17:13:21 2020, Laszlo, Jan, Calibration, the x-ray gate issue,  IMG_20200315_172129.jpg
We found a strange behaviour of our ADC gates for the x-ray detectors.
The setting as shown in the foto below corresponds to a delay of 5 us and a gate length of 15 us.
This is the only setting that produces nice spectra, even though the signals and gate are not aligned.
Entry  Sun Mar 15 17:14:08 2020, Laszlo, Calibration, run036 - Xray90 calib Am241, distance 200!,  
Detector: 90
Source: Am241 
Distance: 200mm
Entry  Sun Mar 15 17:33:17 2020, Laszlo, Calibration, run037 - Xray90 calib Am241,  run037_241Am_145.png
Detector: 90
Source: Am241 
Distance: 167.5mm
Entry  Sun Mar 15 17:50:42 2020, Laszlo, Calibration, run038 - Xray90 calib Ba133, high rate,  run038_133Ba_high_145.png
Detector: 90
Source: Ba133 - high rate
Distance: 167.5mm
Entry  Sun Mar 15 18:09:19 2020, Laszlo, Calibration, run039 - Xray90 calib Ba133,  
Detector: 90
Source: Ba133
Distance: 167.5mm
Entry  Sun Mar 15 18:53:42 2020, Laszlo, Calibration, run040 - Xray145 calib Am241,  run040_241Am_90.png
Detector: 145
Source: Am241
Distance: 305mm
Entry  Sun Mar 15 19:22:58 2020, Laszlo, Calibration, run041 - Xray145 calib Ba133 - high rate,  run041_133Ba_high_90.png
Detector: 145
Source: Ba133
Distance: 305mm
Entry  Sun Mar 15 19:46:34 2020, Laszlo, Calibration, run042 - Xray35 calib Ba133 - high rate,  
Detector: 35
Source: Ba133, strong source
Distance: 334mm
Entry  Sun Mar 15 20:26:08 2020, Laszlo, Calibration, run043 - Xray35 calib Am241,  run043_241Am_35.png
Detector: 35
Source: Am241
Distance: 334mm
Entry  Sun Mar 15 21:01:23 2020, Laszlo, Calibration, run044 - Xray35 calib Ba133 - a night long run ,  run044_133Ba_high_35.png
Detector: 35
Source: Ba133
Distance: 334mm
Entry  Mon Mar 16 15:15:22 2020, Jan, Calibration, Gamma- and X-ray intensities for efficiency calib,  
Intensities for special gamma or x-ray lines needed for efficiency calibration can be found here:

Entry  Tue Mar 17 08:15:49 2020, Jan, General, current grids & screen in TE ,  2020-03-16_18-51-50-170.pngIMG_0694.jpg
measured beam diagnosis with 124Xe48+ at 326 MeV/u
Entry  Tue Mar 17 11:44:58 2020, Jan, Runs, run entry - template ,  
beam: 118Te52+
energy: 7.4 MeV/u
Entry  Wed Mar 18 09:53:28 2020, Laszlo, Jan, General, vacuum after opening gate valve,  vacuum_ESR1.jpgvacuum_setup1.jpg
Gate valve to DSSSD setup was opened on Tue 17.03. ~9:00

The vacuum on Wed 18.03. ~9:00 was
Entry  Thu Mar 19 09:43:28 2020, Laszlo, General, Status of the ESR,  
After two days of tuning the beam, yesterday evening (~8pm), it was found out that within one ESR pattern using the new control system the harmonics of
the cavities cannot be changed. This gives us a fatal limitation, that we cannot go lower 
than 10MeV/u with the beam energy.
Entry  Thu Mar 19 15:09:29 2020, Jan, General, starting off with DSSSD,  
here is my short guide how to start with the measurement as soon as we have a beam available.

0. ESR timing in DAQ (maybe Uwe can also assist here)
Entry  Thu Mar 19 19:14:40 2020, Laszlo, General, primary beam measurement,  
Now our aim is to decelerate the primary beam (naked 124Xe) down to 10MeV/u. At this energy we can test our detectors and that how the scraping works. In
addition, in the E108b experiment, 124Xe(p,g), there is no measurement point at 10MeV/u.
Entry  Thu Mar 19 23:48:56 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetOFF,  IMG_20200319_232647.jpgIMG_20200319_232704.jpgIMG_20200319_234450.jpg
Beam lifetime is estimated to be 11sec at least (hard to.see with the cursor the corrct values on the shottky monitor) 
but Yury says it is even 
~20sec. The particle njmbers are on the attached picture, however at 10Mev the cirrent measurement is not.really 
ELOG V3.1.5-fc6679b