Fri Mar 20 01:11:58 2020, Laszlo, General, Target - beam jntersection,
|
We have managed to find the target position with the beam by looking at the xray spectra. The trick was that at 10mev we
only have a low increase in the xray rates, so.we went for 400Mev/u where the rate change was dramatic (see in the
picture) |
Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,
|
|
Fri Mar 20 01:22:23 2020, Shahab, Runs, Setting for Gas target,
|
Setting for the machines. |
Fri Mar 20 01:36:48 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetON,
|
We didmt see any effect on the lifetime if the target is switched on. It is because we use only hydrogen target (but why
is.it so?) |
Fri Mar 20 04:29:45 2020, Jan, DAQ, DAQ settings for the first night,
|
|
Fri Mar 20 04:32:22 2020, Shahab, Runs, run entry - run046,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 05:03:03 2020, Shahab, Runs, run entry - run046,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 05:32:44 2020, Shahab, Runs, run entry - run047,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 06:00:26 2020, Shahab, Runs, run entry - run047,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 06:34:40 2020, Shahab, Runs, run entry - run048,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 07:01:06 2020, Shahab, Runs, run entry - run048,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 07:30:16 2020, Ragan, RuiJiu, Runs, run entry - run049,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 08:01:40 2020, Ragan, RuiJiu, Runs, run entry - run049,
|
beam: 124Xe54+
energy: 10 MeV/u
|
Fri Mar 20 08:30:52 2020, Ragan, RuiJiu, Runs, run entry - run049,
|
There is no beam due to water leakage in the transfer channel of SIS.
Stop file: run049 at 8:29 am |
Fri Mar 20 10:28:31 2020, Ragan, RuiJiu, Runs, run entry - run050,
|
Beam is back at 10:27 am.
Open file: runstart050
|
Fri Mar 20 11:00:25 2020, Ragan, RuiJiu, Runs, run entry - run050,
|
Yuri and ESR team are optimising
the deceleration in ESR.
DSSSD detector is taken out at
|
Fri Mar 20 13:21:33 2020, Jan, Laszlo, Analysis, 124Xe data of first night,
|
The unpacked data of all runs from the first night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
|
Fri Mar 20 16:48:00 2020, Laszlo, General, flipped Si shaper output in x and y,
|
Yesterday evening we have found out that the energy signals from the silicon are negative --> wrong polarity of the shapers was chosen while using the jumpers.
Cables coming from the preamp are switched now. --> in the recorded data the X and Y coordinates of the Si strip detector is the other way around!
Hopefully, the left and right side we can judge well... |
Fri Mar 20 16:54:53 2020, Jan, DAQ, BaF OFF downscaled red=32,
|
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
|
Fri Mar 20 16:58:02 2020, Jan, DAQ, Xray2 & Xray3 cabling,
|
We found that Xray2 and Xray3 the cabling is not consistent:
90 degree detector
|