HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 20 of 29  Not logged in ELOG logo
Entry  Fri Mar 20 19:37:43 2020, Jan, Calibration, Xray energies - rough 1. calibration ,  
-- E calibration seems to have changed! ---

This calibration is based on the source data taken before the experiment:
Entry  Fri Mar 20 22:26:42 2020, Jan, Detectors, BaF2 deactivated,  
BaF2 detectors are deactivated nor for the following runs.
Entry  Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,  IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg
From the previous settings:
JetOn
  mashine number 11
Entry  Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,  IMG_20200320_222748.jpgIMG_20200320_223424.jpg
Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible. However we could.catch it somehow with Shottky (picture below)
Entry  Fri Mar 20 23:43:26 2020, Laszlo, General, Vacuum while moving in the detector at yesterday evening,  DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg
Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
Entry  Sat Mar 21 01:25:07 2020, Laszlo, General, Vacuum while moving in the detector for fragment measurement,  DSSSD_moving_vacuum_change1.JPG
Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
Entry  Sat Mar 21 01:44:57 2020, Laszlo, General, ,  
from the SIS side they could optimize the intensity. we gained a factor ~3. Now the SIS intensity is at 
Entry  Sat Mar 21 02:00:08 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,  
Beam is back at 01:59 am.
Open file: runstart051
Entry  Sat Mar 21 02:15:19 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,  
Open file: runstart051

beam: 118Te52+
Entry  Sat Mar 21 02:31:48 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,  
Open file: runstart051

beam: 118Te52+
Entry  Sat Mar 21 02:36:44 2020, Laszlo, General, detector and scraper position,  IMG_20200321_025644.jpg
For the 124Xe primary beam measurement:
-with the DSSSD we scraped the beam at position -40
-position of the detector is set to -25. (1.5cm away from the beam)
Entry  Sat Mar 21 03:01:22 2020, Tino, Oliver, Runs, run entry - run051,  
Open file: runstart051

beam: 118Te52+
Entry  Sat Mar 21 03:03:53 2020, Tino, Oliver, Runs, run entry - run052,  
Open file: runstart052

beam: 118Te52+
Entry  Sat Mar 21 03:30:21 2020, Tino, Oliver, Runs, run entry - run052,  
Open file: runstart052

beam: 118Te52+
Entry  Sat Mar 21 03:58:56 2020, Tino, Oliver, Runs, run entry - run053,  
Open file: runstart053

beam: 118Te52+
Entry  Sat Mar 21 04:29:59 2020, Tino, Oliver, Runs, run entry - run053,  
Open file: runstart053

beam: 118Te52+
Entry  Sat Mar 21 05:01:09 2020, Tino, Oliver, Runs, run entry - run054,  
Open file: runstart054

beam: 118Te52+
Entry  Sat Mar 21 05:29:17 2020, Tino, Oliver, Runs, run entry - run054,  
Open file: runstart054

beam: 118Te52+
Entry  Sat Mar 21 06:00:19 2020, Tino, Oliver, Runs, run entry - run054,  
Open file: runstart054

beam: 118Te52+
Entry  Sat Mar 21 06:02:22 2020, Tino, Oliver, General, Detector filling,  
Run stopped for detector fillings
ELOG V3.1.5-fc6679b