Fri Mar 20 19:37:43 2020, Jan, Calibration, Xray energies - rough 1. calibration ,
|
-- E calibration seems to have changed! ---
This calibration is based on the source data taken before the experiment:
Xray1: E [keV] = ch*0.01582-1.963
Xray2: E [keV] = ch*0.01799-1.803
Xray3: E [keV] = ch*0.01941-2.618 |
Fri Mar 20 22:26:42 2020, Jan, Detectors, BaF2 deactivated,
|
BaF2 detectors are deactivated nor for the following runs. |
Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,
|
From the previous settings:
JetOn
mashine number 11
Event number 55
JetOff
Machine number 13
Event number 55
The new settings for our daq:
Jeton
Machine number 12
Event nr. 32
Jetoff
Machine njmber 13
Event number 55 |
Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,
|
Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible. However we could.catch it somehow with Shottky (picture below) |
Fri Mar 20 23:43:26 2020, Laszlo, General, Vacuum while moving in the detector at yesterday evening,
|
Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
This oscillating effect is due to magnets? |
Sat Mar 21 01:25:07 2020, Laszlo, General, Vacuum while moving in the detector for fragment measurement,
|
Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11 |
Sat Mar 21 01:44:57 2020, Laszlo, General, ,
|
from the SIS side they could optimize the intensity. we gained a factor ~3. Now the SIS intensity is at |
Sat Mar 21 02:00:08 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,
|
Beam is back at 01:59 am.
Open file: runstart051
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 01:59 , first file: run051_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 10:30
ON Rates
Si_X: 0-1 Hz
Si_Y: 0-1 Hz
Xray_35: 2 Hz
Xray_90: 33 Hz
Xray_145: 33 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.98 uA
SIS particles before: 2.3e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.46e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 02:15:19 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,
|
Open file: runstart051
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 01:59 , first file: run051_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 01:59 am.
ON Rates
Si_X: 0-1 Hz
Si_Y: 0-1 Hz
Xray_35: 2 Hz
Xray_90: 33 Hz
Xray_145: 33 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.98 uA
SIS particles before: 2.3e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.46e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 02:31:48 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,
|
Open file: runstart051
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 01:59 , first file: run051_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 02:31 am.
ON Rates
Si_X: 0-1 Hz
Si_Y: 0-2 Hz
Xray_35: 1-3 Hz
Xray_90: 39 Hz
Xray_145: 21 Hz
BaF_OR: - Hz
Si voltage: 60.01 V
Si leakage current: 3.98 uA
SIS particles before: 2.3e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.46e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 02:36:44 2020, Laszlo, General, detector and scraper position,
|
For the 124Xe primary beam measurement:
-with the DSSSD we scraped the beam at position -40
-position of the detector is set to -25. (1.5cm away from the beam)
-with the scraper (at Eggelhof 1 position) we scraped the beam at ~(-15)-(-13)
-position of the scraper is set to +20 (3.5cm away from beam axis (sollbahn))
For the 118Te fragment measurement:
-with the DSSSD we scraped the beam at position -39
-position of the detector is set to -24 (1.5cm away from the beam)
-with the scraper (at Eggelhof 1 position) we scraped the beam at ~ -14
-position of the scraper is set to +19 (3.5cm away from beam axis (sollbahn)) |
Sat Mar 21 03:01:22 2020, Tino, Oliver, Runs, run entry - run051,
|
Open file: runstart051
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 01:59 , first file: run051_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 03:01 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 3 Hz
Xray_90: 23 Hz
Xray_145: 18 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.99 uA
SIS particles before: 2.3e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.24e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 03:03:53 2020, Tino, Oliver, Runs, run entry - run052,
|
Open file: runstart052
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 03:03 , first file: run052_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 03:03 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 19 Hz
Xray_145: 26 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.99 uA
SIS particles before: 2.3e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.22e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 03:30:21 2020, Tino, Oliver, Runs, run entry - run052,
|
Open file: runstart052
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 03:03 , first file: run052_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 03:30 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 22 Hz
Xray_145: 14 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.98 uA
SIS particles before: 2.5e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.23e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 03:58:56 2020, Tino, Oliver, Runs, run entry - run053,
|
Open file: runstart053
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 03:03 , first file: run053_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 03:58 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 21 Hz
Xray_145: 21 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.96 uA
SIS particles before: 2.5e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.16e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 04:29:59 2020, Tino, Oliver, Runs, run entry - run053,
|
Open file: runstart053
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 03:03 , first file: run053_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 04:30 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 27 Hz
Xray_145: 17 Hz
BaF_OR: - Hz
Si voltage: 60.01 V
Si leakage current: 4.03 uA
SIS particles before: 2.4e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.40e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 05:01:09 2020, Tino, Oliver, Runs, run entry - run054,
|
Open file: runstart054
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 05:00 , first file: run054_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 05:00 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 19 Hz
Xray_145: 23 Hz
BaF_OR: - Hz
Si voltage: 60.01 V
Si leakage current: 3.98 uA
SIS particles before: 2.4e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.34e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 05:29:17 2020, Tino, Oliver, Runs, run entry - run054,
|
Open file: runstart054
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 05:00 , first file: run054_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 05:29 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 25 Hz
Xray_145: 15 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 3.98 uA
SIS particles before: 2.4e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.31e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 06:00:19 2020, Tino, Oliver, Runs, run entry - run054,
|
Open file: runstart054
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 05:00 , first file: run054_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 06:00 am.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 58 Hz
Xray_145: 0 Hz
BaF_OR: - Hz
Si voltage: 60.02 V
Si leakage current: 4.01 uA
SIS particles before: 2.2e9
ESR particles at injection: estimated ~10^5 - 10^4
ESR particles after decel.:
Target ON density: 1.47e13
copy and repeat the above (below the line) every 30 minutes |
Sat Mar 21 06:02:22 2020, Tino, Oliver, General, Detector filling,
|
Run stopped for detector fillings |