HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 28 of 29  Not logged in ELOG logo
Entry  Mon Mar 23 14:12:54 2020, Ragan, Runs, E127 experiment stops,  
close file : run104 (14:12:44)
E127 experiment finishes on a successful note )) Congratulations to the entire team !!
Entry  Mon Mar 23 14:23:01 2020, Pierre-Michel, DAQ, Backup recoil files,  
Recoil detector files backup to lxg1260:/data.local2/hillenbrand/Laszlo
Entry  Mon Mar 23 14:32:03 2020, Jan, Analysis, runs_100to104 NO-SCRAPER RESULTS,  124Xe_Si_map.png124Xe_Si_projection.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png
Without scraper, we have very few (p,g) counts, hard to get numbers quickly, maybe ~50.

X-rays look fine!
Entry  Mon Mar 23 15:48:15 2020, Laszlo, Calibration, run105 - Xray90 calib Am241, distance 167.5mm, wrong?,  
Detector: 90
Source: Am241 
Distance: 167.5mm
Start time: 15:46:49 23.03.2020
Stop time:  

file name: run105_xxxx.lmd
avrg. rate: 610Hz
dead-time:  7.5%

suspiciously not Gaussian shaped peaks --> investigation with oscilloscope
Entry  Mon Mar 23 16:17:58 2020, Laszlo, Calibration, run106 - garbage!,  
run106 was clicked by accident, please delete!
Entry  Mon Mar 23 16:21:33 2020, Laszlo, Calibration, run107 - Xray90 calib Am241, distance 167.5mm,  
Detector: 90
Source: Am241 
Distance: 167.5mm
Start time: 15:46:49 23.03.2020
Stop time:  17:32 23.03.2020

file name: run107_xxxx.lmd
avrg. rate: 610Hz
dead-time:  7%

not Gaussian shaped peaks, after previous investigations with the scope, the scope is disconnected.

Just to mention, in order to improve deadtime the other two Xray dets are disconnected.
Entry  Mon Mar 23 17:32:42 2020, Laszlo, Calibration, run108 - Xray90 calib Ba133, distance 167.5mm - high rate - deadtime too high!,  
Detector: 90
Source: Ba133 - strong source
Distance: 167.5mm
Start time: 17:32:11 23.03.2020
Stop time:  17:35:34

file name: run108_xxxx.lmd
avrg. rate: 2.7kHz
dead-time:  26%
Entry  Mon Mar 23 17:40:33 2020, Laszlo, Calibration, run109 - Xray90 calib Ba133, distance 167.5mm -low rate,  
Detector: 90
Source: Ba133 - weak source
Distance: 167.5mm
Start time: 17:40:11 23.03.2020
Stop time:  

file name: run109_xxxx.lmd
avrg. rate: 170Hz
dead-time:  2%
Entry  Mon Mar 23 18:15:55 2020, Laszlo, General, noisy 90degree Xray det,  
Uwe found out, that there was some common ground effect between 90 and 145 degree detectors. after moving the grounds, we could record much more nicer (Gaus 
shaped) peaks in the spectra. Now we continue with this settings
Entry  Mon Mar 23 18:17:27 2020, Laszlo, Calibration, run110 - Xray90 calib Ba133, distance 167.5mm -low rate - LESS NOISE,  
Detector: 90
Source: Ba133 - weak source
Distance: 167.5mm
Start time: 18:14:50 23.03.2020
Stop time:  

file name: run110_xxxx.lmd
avrg. rate: 160Hz
dead-time:  2%

Uwe reduced the noise on the 90 degree detector (see previous elog entry)
Entry  Mon Mar 23 19:32:53 2020, Laszlo, Calibration, run112 - Xray90 calib Am241, distance 200mm - LESS NOISE,  
Detector: 90
Source: 241Am
Distance: 200mm
Start time: 20:01:43 23.03.2020
Stop time:  

file name: run112_xxxx.lmd
avrg. rate: 444Hz
dead-time:  5%

Uwe reduced the noise on the 90 degree detector (see elog entry)
Entry  Mon Mar 23 20:52:37 2020, Laszlo, Calibration, run113 - Xray145 calib Am241, distance 305mm - LESS NOISE,  
Detector: 145
Source: 241Am
Distance: 305mm
Start time: 20:01:43 23.03.2020
Stop time:  21:43:34

file name: run113_xxxx.lmd
avrg. rate: 220Hz
dead-time:  2.5%

Uwe reduced the noise on the 145 degree detector as well. 
Entry  Mon Mar 23 21:47:40 2020, Laszlo, Calibration, run114 - Xray145 calib Ba133, distance 305mm - LESS NOISE,  
Detector: 145
Source: 133Ba - strong source
Distance: 305mm
Start time: 21:47:20 23.03.2020
Stop time:  22:04:06 23.03.2020

file name: run114_xxxx.lmd
avrg. rate: 950Hz
dead-time:  11%

Uwe reduced the noise on the 145 degree detector as well. 

During measurement the oscilloscope remained connected!
Entry  Mon Mar 23 22:25:41 2020, Laszlo, Calibration, run115 - Xray35 Ba133 d=334mm, Xray90 Lead source, d=167.5mm,  
Simultaneous measurement of Xray35 and Xray90. The dead-time is <3%

Detector: 35
Source: 133Ba - strong source
Distance: 334mm

Detector: 90
Source: Lead source
Distance: 167.5mm: the lead source was measured 3mm width with the source in the middle. Therefore, I set the paper zylinder to ~169mm distance. 

Start time: 22:25:22 23.03.2020
Stop time:  00:04:49 24.03.2020

file name: run115_xxxx.lmd
avrg. rate35: 75Hz
avrg. rate90: 55Hz
dead-time:  2%

Uwe reduced the noise on the 145 degree detector as well. 

During measurement the oscilloscope remained connected!
Entry  Tue Mar 24 00:11:35 2020, Laszlo, Calibration, run116 - Xray35 calib AM241, distance 334mm,  
Detector: 35
Source: 241Am
Distance: 334mm
Start time: 00:11:03 24.03.2020
Stop time:  10:01:4224.03.2020

file name: run116_xxxx.lmd
avrg. rate: 20Hz
dead-time:  0%
Entry  Tue Mar 24 10:20:26 2020, Laszlo, Calibration, Pictures of the xray calibration,  IMG_20200324_101357.jpgIMG_20200324_101303.jpgIMG_20200324_101334.jpgIMG_20200324_100725.jpg
 
Entry  Tue Mar 24 10:59:18 2020, Jan, Calibration, Sources - Specifications,  Pb-210-1.pdf241Am_Uwe.pdf133Ba_low.pdf133Ba_hi.pdf
We used the following sources:

Am241 (OM666) [GSI - Uwe]
Reference Activity: 430 kBq
Uncertainty: 3%
Reference Date: 19.09.2006

Ba133 hi (AN-5868) [GSI - Kozuharov]
Reference Activity: 438 kBq
Uncertainty: 3%
Reference Date: 01.06.2019

Ba133 low (OL 918) [GSI - Angela]
Reference Activity: 39.7 kBq
Uncertainty: 3%
Reference Date: 08.09.2006

Pb210 (2015-1552) [GUF - Rene]
Reference Activity: 7.42 (15) kBq
Uncertainty: 0.15/7.42 = 2%
Reference Date: 01.01.2016
Entry  Wed Mar 25 14:26:22 2020, Laszlo, Calibration, run111 - Xray90 calib Am241, distance 167.5mm - LESS NOISE,  
Detector: 90
Source: 241Am
Distance: 167.5mm
.Start time: ? 23.03.2020
Stop time:  

file name: run111_xxxx.lmd
avrg. rate: 444Hz
dead-time:  5%

Uwe reduced the noise on the 90 degree detector (see elog entry)
Entry  Wed Mar 25 15:06:09 2020, Laszlo, Analysis, quick summary of the run numbers,  SP54120032515060.pdf
 
Entry  Thu Mar 26 12:05:22 2020, Laszlo, Calibration, measurement of collimators,  SP54120032612091.pdfSP54120032612090.pdf
The measurements were taken by using a caliper ruler, with precision of +/-0.05mm
ELOG V3.1.5-fc6679b