HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 20 of 29  Not logged in ELOG logo
ID Date Author Category Subject Yeardown
  87   Fri Mar 20 19:37:43 2020 JanCalibrationXray energies - rough 1. calibration  
-- E calibration seems to have changed! ---

This calibration is based on the source data taken before the experiment:

Xray1: E [keV] = ch*0.01582-1.963
Xray2: E [keV] = ch*0.01799-1.803
Xray3: E [keV] = ch*0.01941-2.618
  88   Fri Mar 20 22:26:42 2020 JanDetectorsBaF2 deactivated 
BaF2 detectors are deactivated nor for the following runs.
  89   Fri Mar 20 22:51:36 2020 LaszloGeneralTarget on signal change 
From the previous settings:
JetOn
  mashine number 11
  Event number 55
JetOff
  Machine number 13
  Event number 55

The new settings for our daq:
Jeton
  Machine number 12
  Event nr. 32
Jetoff
  Machine njmber 13
 Event number 55
  90   Fri Mar 20 22:54:30 2020 LaszloGeneralFirst view of the beam 
Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible. However we could.catch it somehow with Shottky (picture below)
  91   Fri Mar 20 23:43:26 2020 LaszloGeneralVacuum while moving in the detector at yesterday evening 
Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11

This oscillating effect is due to magnets?
  92   Sat Mar 21 01:25:07 2020 LaszloGeneralVacuum while moving in the detector for fragment measurement 
Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
  93   Sat Mar 21 01:44:57 2020 LaszloGeneral  
from the SIS side they could optimize the intensity. we gained a factor ~3. Now the SIS intensity is at 
  94   Sat Mar 21 02:00:08 2020 Laszlo, Tino, OliverRunsrun entry - run051 
Beam is back at 01:59 am.
Open file: runstart051

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 01:59 , first file: run051_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 10:30

ON Rates
Si_X:      0-1 Hz
Si_Y:       0-1 Hz
Xray_35:   2 Hz
Xray_90:   33 Hz
Xray_145:  33 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           2.3e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.46e13


copy and repeat the above (below the line) every 30 minutes
  95   Sat Mar 21 02:15:19 2020 Laszlo, Tino, OliverRunsrun entry - run051 
Open file: runstart051

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 01:59 , first file: run051_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 01:59 am.

ON Rates
Si_X:      0-1 Hz
Si_Y:       0-1 Hz
Xray_35:   2 Hz
Xray_90:   33 Hz
Xray_145:  33 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           2.3e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.46e13


copy and repeat the above (below the line) every 30 minutes
  96   Sat Mar 21 02:31:48 2020 Laszlo, Tino, OliverRunsrun entry - run051 
Open file: runstart051

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 01:59 , first file: run051_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 02:31 am.

ON Rates
Si_X:      0-1 Hz
Si_Y:       0-2 Hz
Xray_35:   1-3 Hz
Xray_90:   39 Hz
Xray_145:  21 Hz
BaF_OR:    - Hz

Si voltage:          60.01 V  
Si leakage current:  3.98 uA


SIS particles before:           2.3e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.46e13


copy and repeat the above (below the line) every 30 minutes
  97   Sat Mar 21 02:36:44 2020 LaszloGeneraldetector and scraper position 
For the 124Xe primary beam measurement:
-with the DSSSD we scraped the beam at position -40
-position of the detector is set to -25. (1.5cm away from the beam)
-with the scraper (at Eggelhof 1 position) we scraped the beam at ~(-15)-(-13)
-position of the scraper is set to +20 (3.5cm away from beam axis (sollbahn))

For the 118Te fragment measurement:
-with the DSSSD we scraped the beam at position -39
-position of the detector is set to -24 (1.5cm away from the beam)
-with the scraper (at Eggelhof 1 position) we scraped the beam at ~ -14
-position of the scraper is set to +19 (3.5cm away from beam axis (sollbahn))
  98   Sat Mar 21 03:01:22 2020 Tino, OliverRunsrun entry - run051 
Open file: runstart051

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 01:59 , first file: run051_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 03:01 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   3 Hz
Xray_90:   23 Hz
Xray_145:  18 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.99 uA


SIS particles before:           2.3e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.24e13


copy and repeat the above (below the line) every 30 minutes
  99   Sat Mar 21 03:03:53 2020 Tino, OliverRunsrun entry - run052 
Open file: runstart052

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 03:03 , first file: run052_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 03:03 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   19 Hz
Xray_145:  26 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.99 uA


SIS particles before:           2.3e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.22e13


copy and repeat the above (below the line) every 30 minutes
  100   Sat Mar 21 03:30:21 2020 Tino, OliverRunsrun entry - run052 
Open file: runstart052

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 03:03 , first file: run052_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 03:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   22 Hz
Xray_145:  14 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           2.5e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.23e13


copy and repeat the above (below the line) every 30 minutes
  101   Sat Mar 21 03:58:56 2020 Tino, OliverRunsrun entry - run053 
Open file: runstart053

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 03:03 , first file: run053_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 03:58 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   21 Hz
Xray_145:  21 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.96 uA


SIS particles before:           2.5e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.16e13


copy and repeat the above (below the line) every 30 minutes
  102   Sat Mar 21 04:29:59 2020 Tino, OliverRunsrun entry - run053 
Open file: runstart053

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 03:03 , first file: run053_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 04:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   27 Hz
Xray_145:  17 Hz
BaF_OR:    - Hz

Si voltage:          60.01 V  
Si leakage current:  4.03 uA


SIS particles before:           2.4e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.40e13


copy and repeat the above (below the line) every 30 minutes
  103   Sat Mar 21 05:01:09 2020 Tino, OliverRunsrun entry - run054 
Open file: runstart054

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 05:00 , first file: run054_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 05:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   19 Hz
Xray_145:  23 Hz
BaF_OR:    - Hz

Si voltage:          60.01 V  
Si leakage current:  3.98 uA


SIS particles before:           2.4e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.34e13


copy and repeat the above (below the line) every 30 minutes
  104   Sat Mar 21 05:29:17 2020 Tino, OliverRunsrun entry - run054 
Open file: runstart054

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 05:00 , first file: run054_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 05:29 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   25 Hz
Xray_145:  15 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           2.4e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.31e13


copy and repeat the above (below the line) every 30 minutes
  105   Sat Mar 21 06:00:19 2020 Tino, OliverRunsrun entry - run054 
Open file: runstart054

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 05:00 , first file: run054_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 06:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   58 Hz
Xray_145:  0 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  4.01 uA


SIS particles before:           2.2e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.47e13


copy and repeat the above (below the line) every 30 minutes
  106   Sat Mar 21 06:02:22 2020 Tino, OliverGeneralDetector filling 
Run stopped for detector fillings
ELOG V3.1.5-fc6679b